Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

65results about How to "Reduce the number of deployments" patented technology

AOA base station positioning method and device based on Bluetooth

The invention is suitable for the technical field of communication, and provides an AOA base station positioning method and device based on Bluetooth, and the method comprises the steps: obtaining a phase value corresponding to an antenna at a home terminal; the number of the antennas being at least four; the phase value being determined by a received signal broadcasted by a to-be-detected object;and calculating the position information of the to-be-detected object based on the phase value corresponding to each antenna and a preset position calculation strategy. According to the method, the position information of the to-be-detected object can be determined through the phase value corresponding to each antenna and the preset position calculation strategy, single-base-station positioning is realized, data of multiple base stations do not need to be calculated, the positioning speed is improved, and the number of deployed base stations is reduced. Moreover, when the position informationis acquired, the direction angle which is an intermediate variable can be skipped, and the phase difference is directly converted into coordinates, so that the positioning precision is improved.
Owner:深圳市微能信息科技有限公司

Parking space state identification method and device based on video streaming

The invention discloses a parking space state identification method and device based on video streaming. The method comprises the steps that firstly, four corner point coordinates of a parking space are acquired, and through perspective transformation, a parking space image is converted into a standard rectangular image; the standard rectangular image is input to an identification model, and the duty probability of the parking space of the frame is output; the duty probability of the parking space of the frame is compared with a preset threshold value, and whether or not a vehicle exists underthe state of the parking space of the frame is judged; finally, in combination with the state of the parking space of the current frame and preset frames before the current frame, a final state of the parking space is judged. According to the scheme, a parking lot is subjected to parking space state identification based on a camera mode, and the defects can be greatly overcome that in a traditional mode, the cost is high, maintenance is troublesome, and the device is easily damaged. According to the technical scheme, the state of the parking space is comprehensively judged through multiple frames of pictures, a small number of mistaken results caused by interference factors such as pedestrian and vehicle movement are filtered out, the anti-interference capacity is high, and the identification accuracy is high.
Owner:NEWLAND DIGITAL TECH CO LTD

Network data packet classification method and system based on 7-layers of application

The invention provides a network data packet classification method and system based on 7-layer of applications. The network data packet classification method based on 7-layer of applications includes the steps: according to the data frame type, performing classified judgment on the data packet, when the source MAC address for receiving the data or the target MAC address is matched with the preset MAC address in the strategy; obtaining the data message head by splitting and analysis the data packet, and according to the data message head, determining the type of sub data; and finally matching the application layer protocol characteristic codes in the effective load of data, and according to the application layer protocol characteristic codes, obtaining the application layer protocol type. Therefore, the network data packet classification method and system based on 7-layer of applications can accurately identify various network applications, can reduce the output flow, can improve the convergence ratio, and can greatly reduce the displayed quantity of data content analysis servers at the back end.
Owner:湖北微源卓越科技有限公司

Relay node deployment method in time delay limited wireless sensor network

The invention relates to the technology of wireless network, in particular to a relay node deployment method in a time delay limited wireless sensor network. The method comprises two steps of coverageand communication; the main objective of the coverage step is to cover all the sensor nodes with relay nodes as few as possible under the condition of time delay constraint, and the main objective ofthe communication step is to construct network connectivity with the relay nodes as few as possible under the condition of time delay constraint, wherein the coverage comprises three steps of feasible deployment position grouping, grouping selection and feasible position selection; and the communication comprises three steps of feasibility inspection, connectivity construction and relay pruning.According to the method, the requirements of the time delay limited wireless sensor network for time delay and deployment cost are fully considered; a relay node deployment method based on set coverage in a time delay limited double-layer wireless sensor network is provided; and the network connectivity is constructed by deploying the relay nodes as few as possible on the premise that the networktime delay requirement is met.
Owner:SHENYANG INST OF AUTOMATION - CHINESE ACAD OF SCI

SDN (Software Defined Network) environment important node information acquisition method

ActiveCN105245362AReduce the number of collection nodesImprove service capabilitiesData switching networksLivenessRelevant information
The invention discloses an SDN (Software Defined Network) environment important node information acquisition method. The method is used for selecting important nodes in a network so as to carry out key monitoring and key deployment on network services. The method includes the following steps that: related information of a forwarding plane and a network service program are collected; and the important degrees of forwarding nodes are subjected to quantitative analysis, and then, focused information acquisition can be performed on the network services. According to the method, selected parameters include the following four parts: 1) communication traffic; 2) network topology; 3) forwarding node liveness; and 4) network service information, wherein the network service information is indexes related to the evaluation of the urgent degree of the deployment of the services by the forwarding nodes and can be selected from indexes provided by specific network services according to the specific network services. With the method of the invention adopted, the information acquisition work of the network services is optimized, and the number of network service information acquisition nodes can be decreased, and excellent service effects can be obtained.
Owner:HENAN UNIVERSITY OF TECHNOLOGY +1

Service quality detection method and device

The invention provides a service quality detection method and device, which relates to the field of communication and is used for detecting the quality of services sent by SR (Service Router) equipment to optical line terminal (OLT) equipment in an Internet protocol television service system. The method comprises the steps of sending a detection instruction to the first SR equipment, wherein the detection instruction is used for enabling the first SR equipment to send a first service flow to a probe, and the first service flow is the same as a service flow transmitted by a port to be detected;and obtaining a key performance indicator (KPI) obtained by the probe after decoding the first service flow, and carrying out quality detection on the KPI to determine the quality of the first service flow. The method can collect and analyze the service flow transmitted by an SR node to an OLT in the IPTV (Internet Protocol Television) service transmission system, reduce the deployment number ofprobes and reduce the network investment.
Owner:CHINA UNITED NETWORK COMM GRP CO LTD

Construction site personnel positioning system and using method thereof

In order to solve the problem that the construction site personnel cannot be positioned precisely, the invention provides a construction site personnel positioning system and a using method thereof. The construction site personnel positioning system is characterized in that: the construction site personnel positioning system comprises a plurality of master anchor nodes distributed in a construction site, a plurality of slave anchor nodes distributed on the periphery of each master anchor node, positioning tags, a data gateway and a server; each positioning tag comprises a master tag that communicates with the master anchor nodes, slave tag that communicates with the slave anchor nodes, and a battery supplying power to the master tag and the slave tag; the master anchor nodes and the slaveanchor nodes are connected with the data gateway separately; and the data gateway is connected with the server. The construction site personnel positioning system adopts a multi-level anchor point mechanism, gradually reduces the range of a positioning region, reduces the interference of obstacles on positioning during the positioning process, and realize precise positioning of the personnel at the construction site.
Owner:SHANGHAI CONSTRUCTION GROUP

K-fence construction and charger optimal deployment method for wireless rechargeable sensor network

The invention discloses a k-fence construction and charger optimal deployment method for a wireless rechargeable sensor network. The method comprises the following specific steps: step 1, constructing a fence diagram according to monitoring area information; and step 2, solving a fence network structure by using a minimum cost and maximum flow algorithm; step 3, finding each sensor node forming the fence according to the solving information of the minimum cost maximum flow algorithm; step 4, dividing the whole monitoring area into grid points, and calculating the effectiveness of arranging the charger at each grid point; and step 5, selecting a charger position according to the charging utility of each grid point; judging whether all sensor nodes meet the charging requirement or not, and if yes, ending; otherwise, returning to the step 4 to recalculate the charging effectiveness of the remaining grids. Fence coverage and charger deployment are combined, and the number of deployed chargers is reduced on the premise of ensuring the fence coverage requirement.
Owner:HANGZHOU DIANZI UNIV

Network element agency managing method and system

The invention provides a network element agency managing method and system. The method comprises the steps that an RMI and / or EJB request network data message sent by an operation maintenance terminal (OMT) to an operation maintenance center (OMC) server is monitored, intercepted and captured; a source port of the request network data message is extracted and preprocessed; the request network data message is sent to a target OMC server; an OMC response message returned by the target OMC server is intercepted and captured; a target port of the response message is extracted, and inverse processing of preprocessing is carried out on the target port of the response message; the OMC response message is sent to the OMT according to the processed target port. According to the network element agency managing method and system, due to the fact that the network data message of an RMI and EJB protocol is monitored, intercepted, captured and forwarded, a one-to-many mode is achieved between the OMT and the OMC, all network elements managed by a login user can be checked by logging into one OMT, the efficiency of network element daily maintaining managing is effectively improved, and the maintaining managing cost is reduced.
Owner:DATANG MOBILE COMM EQUIP CO LTD

Video monitoring method and apparatus based on virtual cameras

The invention discloses a video monitoring method and apparatus based on virtual cameras, applied to a video monitoring system. The method comprises the following steps: receiving basic stream video data from the camera, and virtualizing a predetermined number of virtual cameras; receiving a code stream request from a video terminal, and allocating the virtual camera to the received code stream request to serve as a stream sending end of the video terminal; sending the basic stream video data to the stream sending end, packaging the basic stream video data of the stream sending end according to a code stream package mode corresponding to the code stream request, and sending the packaged basic stream video data to the corresponding video terminal. By adoption of the video monitoring method and apparatus disclosed by the invention, the shared use of the camera is achieved, thereby greatly reducing the deployment number of physical cameras and improving the monitoring utilization rate of the cameras, only a plurality of virtual cameras are configured to be compatible with different platforms, and the cameras only need to send encoded basic streams, so that the performance requirements for the cameras are greatly reduced, and the investment cost of the cameras is reduced.
Owner:ZHEJIANG UNIVIEW TECH

Illumination probe generation method, device, storage medium and computer equipment

The invention relates to an illumination probe generation method, an illumination probe generation device, a storage medium and computer equipment. The method comprises the following steps of: selecting the shadow points of a target object in a virtual scene; converting the selected shadow points into a voxelized shadow voxel object; reducing the number of vertexes in the shadow voxel object to obtain a reduced shadow voxel object; and generating illumination probes at the vertex positions of the vertex-reduced shadow voxel object. With the method provided by the technical schemes of the invention adopted, when the illumination probes are distributed, the occupation of a large amount of memory and the consumption of a large amount of distribution time can be effectively avoided.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Hybrid network mobile node coverage detection method and node deployment selection method

The invention provides a hybrid network mobile node deployment selection method which comprises the following steps: a mobile node starts from a starting point, a basic behavior is firstly selected to carry out deployment detection, a static node is deployed after the completion of implementing one basic behavior, and the mobile point initiatively obtains the distance difference of an obstacle in the horizontal direction in the deployment process; if no obstacle exists in the horizontal direction, the deployment detection is continuously performed; after the completion of implementing one basic behavior, the mobile node uses and implements a vertical basic behavior to carry out static node deployment, and after completion, a deployment detection process of a basic behavior in the next direction is started; the mobile node judges whether a point location close to an obstacle area in the X direction belongs to an effective point location of a deployed static node or not by using a 3 node plus 1 distance method, the deployment of the static node is performed after the predetermined conditions are met, otherwise, the deployment is not carried out. The node deployment selection method provided by the invention has the benefit that the deployment number of the static node can be effectively reduced.
Owner:SOUTHEAST UNIV

Resource scheduling method, base station and terminal

InactiveCN106550476AQuality improvementReduce the delay waiting for schedulingWireless communicationResource blockComputer terminal
The invention provides a resource scheduling method, a base station and a terminal. The method comprises the steps of receiving a resource scheduling request of the terminal, wherein the resource scheduling request comprises the size of a transmission block expected to request and a physical resource block expected to request; distributing the physical resource blocks to the terminal according to the situation of a coding and modulation mode distributed at the last time, the size of the transmission block expected to request, and physical resource block expected to request and the currently valid physical resource block when a time interval between current time and last resource distribution time is within a preset cycle, or variations of channel quality between the current time to the last resource distribution time are within a preset rang; and when the time interval between current time and last resource distribution time exceeds the preset cycle, or variations of channel quality between the current time to the last resource distribution time are out of the preset rang, executing a link adaption method to distribute the resources to the terminal. According to the method provided by the invention, the last link adaption scheduling information is multiplexed to distribute the resources when the variations of channel quality is within the preset range, so that time used for distributing the resources to the terminal is reduced.
Owner:BAICELLS TECH CO LTD

Tebuconazole emulsion in water

The invention relates to a tebuconazole emulsion in water. The tebuconazole emulsion in water comprises, by mass, 10-30% of a tebuconazole original drug, 10-25% of dimethyl sulfoxide, 5-15% of dimethyl formamide, 5-15% of isooctyl acetate, 5-10% of an emulsifier and 45-65% of water. In preparation, dimethyl sulfoxide, dimethyl formamide and isooctyl acetate are added into a stirring device according to the above mass percent, then the tebuconazole original drug is added into and dissolved in the mixture with stirring, then the emulsifier is added into the mixed solution, the mixed solution is stirred to obtain a uniform solution, then water is slowly added into the solution and the solution is mixed so that the uniform tebuconazole emulsion in water is obtained. A detection result shows that the tebuconazole emulsion in water has a lasting foam volume (standing for 1min) / mL index less than or equal to 8 and has invariable other main technical indexes. In a real process, the used agent dosage (concentration) can be easily and effectively controlled under the condition of the same spray volume, normal agent action is promoted, a foam generation is reduced, a change range is reduced, blending frequency and time are reduced and work efficiency is improved.
Owner:ZHEJIANG LONGYOU DONGFANG ANASAKE CROP TECHCO

SDN matrix network probe deployment method and device based on greedy algorithm

The invention discloses an SDN matrix network probe deployment method and device based on a greedy algorithm. The method comprises the following steps: converting an SDN network matrix into an undirected graph, judging whether points and edges in the graph can be deleted or not, and removing all deletable points through a recursive algorithm to obtain a final probe deployment node distribution map, thereby determining the position of a probe to be deployed. According to the method, degree sorting is no longer taken as a selection standard, but the method starts from the points which cannot becut and obtains the minimum set of the acquisition points, thereby improving the existing minimum vertex coverage greedy algorithm, and effectively reducing the number of deployed probes.
Owner:CHINA ELECTRONICS TECH CYBER SECURITY CO LTD

Electromagnetic wave lens, antenna and antenna array

The invention provides an electromagnetic wave lens. An outline shape of a cross section of a wave beam passing through the lens is similar to a rectangle or a square so that blind-area-free signal coverage can be realized by using the least lens antennas. A kernel body and a plurality of dielectric layers wrapping the kernel body are included. A dielectric constant of the kernel body is 1.7-2.3,the dielectric constant of the dielectric layer on the outermost layer is 1-1.2, and the dielectric constants of all the layers are smaller and smaller from the kernel body to the dielectric layer onthe outermost layer. Especially, the kernel body is a cuboid, and an appearance of each dielectric layer is also a cuboid. In fact, debugging personnel can complete debugging work of ground coverage more simply and accurately under a condition of avoiding large-area overlapping of different wave beams. The invention also provides an antenna adopting the electromagnetic wave lens and an electromagnetic wave lens antenna array.
Owner:FOSHAN CITY EAHISON COMM

Air wireless energy transfer system adopting unmanned aerial vehicles

The invention discloses an air wireless energy transfer system adopting unmanned aerial vehicles, and belongs to the technical field of new-generation air traffic and renewable energy utilization. Anenergy charging framework of unmanned aerial vehicles (UAVs) with a no-stopping characteristic is designed in the system, and an air charging platform framework is realized. The framework comprises aground radio transmission array consisting of a charging coil and an air unmanned aerial vehicles (P-UAVs) located inside the effective radiation angle of the array, and also relates to an intelligentinformation processing and control mechanism related to machine learning. For the UAVs to be charged, the P-UAVs can be used for positioning and tracking the UAVs actively, and wireless energy transfer can be carried out on the P-UAVs, so that the coverage range of an original wireless energy transfer device is expanded. According to the system, the omni-directional coverage range of the ground wireless charging array is expanded, and the deployment quantity of ground charging array equipment is reduced, so that the deployment cost is reduced; and through the no-stopping characteristic, the energy charging and traffic operation efficiency in air traffic is also improved.
Owner:NANJING UNIV OF POSTS & TELECOMM

Unmanned aircraft system for supervision and enforcement of industrial gas emission

The invention discloses an unmanned aircraft system for supervision and enforcement of industrial gas emission. The unmanned aircraft system is characterized in that the system comprises an unmanned aircraft, a mobile platform and a controlling and supervising system, the unmanned aircraft is provided with a camera and a sensor, and the camera and the sensor are both connected with a single chip microcomputer on the unmanned aircraft; the mobile platform provides electric energy and a landing place for the unmanned aircraft, and is loaded with a third wireless communication module, a wireless charging launcher, a fixed groove and a laser distance measuring sensor; the controlling and supervising system is connected with the unmanned aircraft in a wireless manner and is used for controlling and obtaining data acquired by the unmanned aircraft, and the controlling and supervising system can be connected with the mobile platform in a wireless manner and controls the mobile platform to carry out wireless charging and to fix and release the unmanned aircraft. The unmanned aircraft system is applied to supervision and enforcement of industrial gas emission, can be controlled flexibly and can work outdoors for a long time, and manual work is saved.
Owner:ZHEJIANG UNIV

Data compression storage method

The invention discloses a data compression storage method. The data compression storage method comprises the step of data algorithm generation and storage, the step of data storage and defining and the step of data storage. Data are matched according to algorithms in data marker definitions, after matching is successfully carried out, the current values can be compressed, otherwise, original storage of the values is carried out, same nodes just need storing once, accordingly, space where a plurality of repeated data nodes need storing is reserved, and therefore the problem that huge storage space is occupied is solved, the number of deployed hardware is reduced, the deploying environment is miniaturized, and deploying cost is saved. The data compression storage method can achieve real-time, high-frequency and large-data-volume data compression storage, and the purpose of greatly reducing storage space is achieved.
Owner:莱诺斯科技(北京)股份有限公司

Visual large-screen intelligent editing system

The invention relates to a visual large-screen intelligent editing system, which comprises a template component selection unit which is provided with a plurality of pre-edited template components; thelarge-screen real-time editing and previewing unit which is configured with a visual editing window which can be synchronized with a preset large-screen interface, and the selected component can be edited for the second time in the editing window; and the component attribute configuration unit which is configured to perform specific attribute configuration on the component selected in the editingwindow. According to the invention, the visual large screen can be adjusted on site without the need for research and development personnel, and the visualization can be quickly configured without the need for research and development personnel, so that the large screen generation process is greatly simplified, the deployment frequency of operation and maintenance personnel is reduced, the repeated labor is reduced, and the working efficiency is improved.
Owner:上海数依数据科技有限公司

Software-defined optical network controller deployment method based on multipath survivability protection

The invention discloses a software-defined optical network controller deployment method based on multipath survivability protection, belongs to the technical field of networks, and is applied to deployment of a two-layer SDN (Software Defined Network) controller. On the premise that the survivability requirement of a user for a control plane is guaranteed, the situation of multi-controller multi-path collaborative management and control of exchange nodes is provided, the number of controllers is further reduced, and the control cost is further reduced. According to the method, a controller deployment scheme in which a switch and a controller have a unique link is firstly solved, the scheme contains redundant controllers, and the number of the controllers needs to be further reduced. According to the method, a posterior idea is adopted, that is, whether the fault probability of each switch is lower than the fault probability required by a user is verified according to a deployment result. The number of the controllers is gradually reduced, and the survival probability of the switch is ensured all the time until the deployment number of the controllers reaches the minimum. And finally, selecting the controller with the lowest communication time delay as a management and control center to complete the deployment work of the whole control plane.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Accurate positioning device and method for assisting automatic driving

The invention relates to an accurate positioning device and method for assisting automatic driving. The device comprises road sign millimeter wave emitters, millimeter wave array receiving antennas, an automatic driving control system and a container truck. The plurality of road sign millimeter wave emitters are deployed on a guide path center line of a specified road surface corresponding to thecoordinate codes of a precise map; each of the two ends of the container truck is provided with a column of millimeter wave array receiving antennas, each millimeter wave array receiving antenna is composed of a plurality of antenna units which are arranged in two rows in a staggered mode, the automatic driving control system is installed on the container truck, and the automatic driving control system comprises a millimeter wave signal processor and a vehicle control unit. The cost of AGV transportation equipment is reduced, the efficiency is improved, and automatic transportation of variousport containers is met.
Owner:福建中科云杉信息技术有限公司

Columnar storage technology-based real-time data compression algorithm

ActiveCN107193925ASolve the huge storage space occupationReduce the number of hardware deploymentsSpecial data processing applicationsDeployment environmentData compression
The invention discloses a columnar storage technology-based real-time data compression algorithm. According to the algorithm, trial calculation and assessment of a variable-step calculation formula are completed for a sequence in a specific column package, search and parameter calculation of a unit calculation formula are covered, and real-time data column packages in compression division can be compressed, so as to solve the problem of huge storage space occupancy, decrease the hardware deployment quantity, downsize the deployment environment and save the deployment cost. The algorithm disclosed by the invention is capable of realizing real-time high-frequency and large-data volume data compression and storage, and greatly decreasing the storage space occupancy problem.
Owner:浙江正泰中自控制工程有限公司

Directed wireless charger deployment method for multi-hop rechargeable sensor network

The invention discloses a directed wireless charger deployment method used in a multi-hop rechargeable sensor network, and belongs to the field of Internet-of-Things wireless rechargeable sensor networks, and the method comprises the steps: firstly dividing nodes in a whole area into a plurality of subareas through a circular coverage method according to the charging range of a charger and the actual distribution of the nodes; secondly, designing a multi-hop charging coverage method of the nodes to determine a multi-hop charging path of the nodes; and finally, designing a method for searchingfor the optimal deployment position and angle of the charger according to the node distribution condition in the subarea. According to the method, the problem of directed charger deployment in the multi-hop wireless rechargeable sensor network is solved, and the method is an economical and effective energy supplementing method for prolonging the life cycle of the wireless rechargeable sensor network.
Owner:KUNMING UNIV OF SCI & TECH

Water meter data acquisition method based on Bluetooth networking

The invention discloses a water meter data acquisition method based on Bluetooth networking, which utilizes the characteristic of centralized installation of water meter wells, a Bluetooth NB-IoT water meter proxy node acquires data of other Bluetooth water meter tail end nodes installed nearby through networking Bluetooth, and integrally packs and uploads the data, so that the deployment number of NB-IoT water meter nodes can be greatly reduced, the problem of NB-IoT network data reporting congestion is solved, and meanwhile, due to the fact that only one Bluetooth NB-IoT water meter proxy node needs to be equipped with the NB-IoT module at one centralized installation point, the installation and maintenance cost of the overall solution can be remarkably reduced.
Owner:QINGDAO TOPSCOMM COMM

Software optical network controller deployment method and storage medium

The invention discloses a software optical network controller deployment method and a storage medium, belongs to the technical field of networks, and is applied to two-layer SDN controller deployment.On the premise that the survivability requirement of a user for a control plane in a large-scale network (namely a network with more nodes and higher total degree) is met, the control redundancy is reduced as much as possible, and the deployment cost of a controller is reduced. According to the method, the maximum fault probability P provided by the user is obtained, then the controller combination meeting the condition is obtained through calculation, the dependence of each SDN switch node on the whole network is calculated accordingly, and finally the optimal controller deployment scheme isobtained.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Network dial testing method, network dial testing system and computer readable storage medium

According to a network dial testing method, a network dial testing system and a computer readable storage medium provided by the invention, the dial testing task type is abstracted, the dial testing task type can be configured to the dial testing end through the abstracted data, and the dial testing end does not need to be upgraded and iterated. Moreover, the dial testing efficiency is improved, a large number of periodic dial testing tasks can be supported, and the deployment number of load dial testing ends of the same level can be reduced. The network dial testing method provided by the invention specifically comprises the following steps: S1, a dial testing task descriptor for defining the type of a dial testing task is constructed; S2, the dial testing end receives the dial testing task sent by the dial testing server; and S3, the dial testing end executes the dial testing task according to the dial testing task descriptor corresponding to the dial testing task type of the dial testing task.
Owner:SHANGHAI YAMU COMMUNICATION TECHNOLOGY CO LTD

Blade fault monitoring method and equipment based on double arrays

ActiveCN111120223AReduce the number of deploymentsTo overcome the problem that the positioning accuracy will become lower and lowerMachines/enginesWind motor monitoringControl engineeringMonitoring methods
The invention relates to a blade fault monitoring method based on double arrays. The method comprises the following steps that S1, the first array is arranged, and blade fault information is obtainedthrough monitoring; and S2, a fault is positioned, specifically, S21, a fault azimuth is estimated, the minimum fault azimuth is obtained, and then positioning is performed by means of the first array; and S22, the second array is arranged, and the first array and the second array are matched to perform fault positioning. The invention further discloses blade fault monitoring equipment based on the double arrays. According to the blade fault monitoring method and equipment based on the double arrays, the first array and the second array are combined, and the problem that the positioning precision is increasingly low as an included angle between the first array and a rotating plane increases is solved; and the fault point estimation precision is improved, the array arrangement quantity is greatly decreased, fault positioning under the condition that a blade rotary shaft rotates with the wind direction is completed by means of the first array and the second array only, the array arrangement quantity is greatly decreased, and the cost is lowered.
Owner:大连赛听科技有限公司

DCS control system

The invention discloses a DCS control system which comprises a control station connected with a configuration monitoring software device and at least two DP main stations connected with the control station, the control station is a control station of a multi-task operating system and used for configuring a plurality of IEC tasks, and the DP main stations and the IEC tasks are in mapping association. The control station adopts a multi-task operation system, a plurality of IEC tasks can be configured at the same time, the DP main station and the IEC tasks are in mapping association, one IEC taskcan be associated with a plurality of DP main stations, but the same DP main station can only be associated with one IEC task, and as the support of the plurality of DP main stations can be realized,the faster operation speed can be realized; the whole DCS control system is suitable for being deployed in a large-scale complex scene, the deployment number of control stations is reduced, the utilization efficiency of a DP main station is improved, and the DCS control system is low in deployment cost, high in integration degree, good in reliability and flexible in configuration.
Owner:HANGZHOU HOLLYSYS AUTOMATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products