Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

40results about How to "Solve the "curse of dimensionality" problem" patented technology

Privacy-protection index generation method for mass image retrieval

The invention discloses a privacy-protection index generation method for mass image retrieval, relates to the privacy protection problem in mass image retrieval and involves with taking privacy protection into image retrieval. The method is used for establishing an image index with privacy protection, and therefore, the safety of the privacy information of a user can be protected while the retrieval performance is guaranteed. The method comprises the steps of firstly, extracting and optimizing SIFT (Scale Invariant Feature Transform) and HSV (Hue, Saturation and Value) color histogram, performing feature dimension reduction by use of a use of a manifold dimension reduction method of locality preserving projections, and constructing a vocabulary tree by using the dimension-reduced feature data. The vocabulary tree is used for constructing an inverted index structure; the method is capable of reducing the number of features, increasing the speed of plaintext domain image retrieval and also optimizing the performance of image retrieval. The method is characterized in that privacy protection is added on the basis of a plaintext domain retrieval framework and the inverted index is double encrypted by use of binary random codes and random projections, and therefore, the image index with privacy protection is realized.
Owner:数安信(北京)科技有限公司

Hexapod-robot real-time gait planning method based on deep reinforcement learning

InactiveCN107450555AEnables real-time gait planningFast convergencePosition/course control in two dimensionsSimulationGait
The invention provides a hexapod-robot real-time gait planning method based on deep reinforcement learning. The method comprises the following steps of using a hexapod robot to acquire environment road condition information and making an integral movement track; through a camera, acquiring an environment photograph, according to the photograph, using a binocular range finding method to calculate road condition information of a target track, and using the calculated road condition information of the track in robot center of mass movement track navigation; in a foot end swinging space range of robot legs, taking photographs of a road condition environment, and through a trained deep reinforcement learning network based on a depth determinacy policy gradient (DDPG), carrying out data dimension reduction and feature extraction on the photograph; and according to a feature extraction result, acquiring a control policy of a hexapod robot, wherein the hexapod robot controls foot laying of a robot according to the control policy so that real-time walking of the hexapod robot is realized. By using the gait planning method, a complex and non-structural environment of a road condition can be planned in real time. The method has an important meaning for increasing an environmental adaptive capacity of the hexapod robot.
Owner:唐开强

Feature selection method and system, computer readable storage medium and electronic equipment

The invention relates to a feature selection method and system, a computer readable storage medium and electronic equipment. The method comprises the steps that a first feature subset is acquired, anda first evaluation index corresponding to the first feature subset is determined; Obtaining a second feature subset and a third feature subset; Determining a second evaluation index corresponding tothe third feature subset; When the second evaluation index is superior to the first evaluation index, executing an updating operation; And when it is determined that the first updating cut-off condition is met, determining the current target feature subset as the target input feature of the target model, otherwise, determining the third feature subset as a new first feature subset, determining thesecond evaluation index as a new first evaluation index, and returning to the step of obtaining the second feature subset and the third feature subset. Therefore, the target input features of the better target model can be quickly and effectively screened out, the dimension of the feature set is greatly reduced, the problem of 'dimension disaster' is solved to a great extent, and the calculationefficiency is improved.
Owner:NEUSOFT CORP

'Source-network-load' two-stage multi-target control method and system for power distribution network

The invention discloses a 'source-network-load 'two-stage multi-target control method and system for a power distribution network, and aims to provide a control method and system capable of realizingthe stability of safe operation of a power distribution system. The method comprises the following steps: establishing a two-stage multi-objective mathematical optimization model; establishing a first-stage centralized optimization control objective function and a second-stage distributed optimization control objective function; solving a first-stage centralized optimization control objective function of the current day by adopting a multi-objective harmony search algorithm; setting weight preferences to obtain a network structure of the power distribution network and the total number of partition feeders; adopting a harmony search algorithm to solve a second-stage distributed optimization control objective function of the partition feeder line; if the current time point is equal to 24 hours, generating distributed power supply and flexible load power sequence data of the 24 time points; and if the current date is equal to the preset value, ending the whole calculation process. According to the method, the frequency of global information transmission processing is reduced, and the security is improved.
Owner:TIANJIN UNIV

Word computing method and device based on broad general type-2 fuzzy set

The invention relates to a word computing method and a word computing device based on a broad general type-2 fuzzy set. The method comprises the steps of building a broad general type-2 fuzzy set word model; building a univariate rule module, measuring proximity between an actual input assessment criteria linguistic value and a corresponding univariate rule module rule first component to serve as a weight and a rule consequent, and aggregating to acquire an intermediate output word linguistic value; operating to acquire a univariate rule module weight via a constrained multi-objective optimization algorithm, and aggregating the univariate rule module weight with the intermediate output word linguistic value to acquire a final output word linguistic value; determining a plurality of object relations to be evaluated through sorting via a fractional function method, or computing proximity between the final output word linguistic value and the known output word linguistic values and selecting the value with the maximum proximity to serve as the actual output word linguistic value of the object to be evaluated. According to the method and the device provided by the invention, the problem of curse of dimensionality caused by rapid increase of fuzzy rules is solved, word computing efficiency and accuracy in artificial intelligence equipment are effectively improved, and wider application prospects are provided.
Owner:HENAN UNIVERSITY OF TECHNOLOGY

Hierarchical dimensionality reduction dynamic planning method for load optimization distribution of hydropower station

The invention discloses a hierarchical dimensionality reduction dynamic planning method for load optimization distribution of a hydropower station, which is based on a dynamic planning method and overcomes the problem of curse of dimensionality of the dynamic planning method by using a hierarchical planning method. A table storage to-be-looked-up method is adopted. Firstly, an optimal operation general table of the whole plant is calculated off line, and an optimal operation scheme is obtained by looking up the table through a computer in the operation process. On the basis of unit design characteristic data of the power station, dynamic characteristics of each unit and each unit are calculated. On the basis, the optimal load distribution problem under the ideal condition that all the units in the plant can work normally (namely, all the units are good in state, free of faults and capable of working according to designed dynamic characteristics) is researched, a scheme of optimal load distribution of the hydropower station units is given, and a general conclusion of load distribution of the units is obtained. The method has the advantage that the operation efficiency of optimal distribution of the hydropower station unit load is improved. The calculation workload is reduced, the calculation time is shortened, and the real-time operation requirement is met.
Owner:SICHUAN UNIV

Variable-stage gradual optimization based joint optimization scheduling method for cascaded hydropower stations

ActiveCN105354630AOvercome local convergenceGood global search abilityForecastingPower stationWater level
The present invention discloses a variable-stage gradual optimization based joint optimization scheduling method for cascaded hydropower stations. The method comprises: step 1, acquiring an initial scheduling process of each hydropower station, and performing water level regulation in a constraint search manner; step 2, fixing water levels of an ith node and an (i+VP)th node, and performing optimization calculation for problems in VP stages by adopting a differential evolution algorithm; step 3, selecting a population size NP, wherein initial individuals are adjustable points of the cascaded hydropower stations; step 4, obtaining a water level process line of each cascaded hydropower station; step 5, by using the water level process line of each hydropower station obtained in the step 4 as an initial trajectory, repeating the steps 2 to 5 until a variable-stage convergent condition is satisfied; step 6, setting VP to be equal to the sum of VP and 1; repeating the steps 2 to 5 until a final convergent condition is satisfied; and step 7, ending the calculation, and obtaining an optimal water level process line of each hydropower station. The method disclosed by the present invention has very good global search capability for solving the problem in joint optimization scheduling of the cascaded hydropower stations, and effectively solves the local convergence problem of a conventional algorithm.
Owner:HUAZHONG UNIV OF SCI & TECH

Multi-unmanned aerial vehicle cooperative search method under communication constraint

The invention discloses a multi-unmanned aerial vehicle cooperative search method under communication constraint, which belongs to the field of unmanned aerial vehicle regulation and control, and comprises the following steps of: firstly, determining the coverage area of each unmanned aerial vehicle; secondly, carrying out two-dimensional gridding processing on a given search region, and calculating an area coverage rate corresponding to each unmanned aerial vehicle at each moment; thirdly, setting an initial position, a speed and a direction of each unmanned aerial vehicle randomly , and determining a communication distance d between the unmanned aerial vehicles according to the communication quality; fourthly, establishing two neural networks with identical structures and different parameters for each unmanned aerial vehicle in each flight control system, and initializing the neural networks; fifthly, respectively calculating a node position of each unmanned aerial vehicle at the next moment by using the initialized unmanned aerial vehicles and a neural network, updating corresponding neural network parameters, carrying out loop iteration, and connecting all nodes to obtain a corresponding search path; and finally, enabling each unmanned aerial vehicle to fly according to the respective search path to complete the search task. According to the multi-unmanned aerial vehicle cooperative search method, the maximum search range is achieved, and meanwhile the communication quality is guaranteed.
Owner:BEIHANG UNIV

Virtual power plant rolling scheduling technology considering temperature control load polymer

The invention provides a virtual power plant rolling scheduling method considering mass temperature control load aggregation, which comprises the following steps: counting temperature control loads on each bus of a virtual power plant, carrying out cluster clustering on each temperature control load according to demand information of each temperature control load, and calculating parameters of an aggregator; then, according to prediction information of a temperature control load aggregation result, renewable energy sources and various types of electricity prices, establishinga virtual power plant optimization scheduling model considering temperature control load aggregators , obtaining a pre-optimization result of rolling scheduling through solving, and obtaining reference power of each aggregator ; allowing each aggregator to decompose and optimize the reference power and distribute the reference power to each temperature control load in the aggregator to obtain an actual power demand of each temperature control load in the aggregator; and formulating a final rolling scheduling plan according to the actual power requirements of all the temperature control loads. By implementing the method, coordinated scheduling of mass temperature control loads in the virtual power plant can be achieved, and the method has the advantages of being high in calculation efficiency, wide in compatibility and high in practicability.
Owner:SHENZHEN POWER SUPPLY BUREAU

Dynamic planning dimension reduction reservoir scheduling method based on dynamic search and discrete mechanism

The invention belongs to the technical field related to reservoir scheduling, and particularly relates to a dynamic planning dimension reduction reservoir scheduling method based on a dynamic search and discrete mechanism. The method comprises the following steps: S1, determining an upper limit and a lower limit of an initial reservoir capacity of a reservoir to be processed; S2, dispersing the continuous curve of the storage capacity and the time into a plurality of moments, and updating the upper limit and the lower limit of the storage capacity corresponding to each moment; S3, dividing a part between the upper limit and the lower limit of the storage capacity at each moment into a plurality of equal parts to obtain the number of discrete points so as to obtain the number of the required discrete points; and S4, inputting the required discrete points and the upper limit and the lower limit of the reservoir capacity corresponding to each moment into a target function corresponding to the maximum peak clipping criterion of the reservoir so as to obtain the maximum discharge flow and the calculation time of the reservoir. By means of the method, the problems that in the dynamic planning calculation process, the number of discrete points is small, the discharged flow is negative, the dispersion degree is large, and the calculation time is long are solved.
Owner:HUAZHONG UNIV OF SCI & TECH

A privacy-preserving index generation method for massive image retrieval

The invention discloses a privacy-protection index generation method for mass image retrieval, relates to the privacy protection problem in mass image retrieval and involves with taking privacy protection into image retrieval. The method is used for establishing an image index with privacy protection, and therefore, the safety of the privacy information of a user can be protected while the retrieval performance is guaranteed. The method comprises the steps of firstly, extracting and optimizing SIFT (Scale Invariant Feature Transform) and HSV (Hue, Saturation and Value) color histogram, performing feature dimension reduction by use of a use of a manifold dimension reduction method of locality preserving projections, and constructing a vocabulary tree by using the dimension-reduced feature data. The vocabulary tree is used for constructing an inverted index structure; the method is capable of reducing the number of features, increasing the speed of plaintext domain image retrieval and also optimizing the performance of image retrieval. The method is characterized in that privacy protection is added on the basis of a plaintext domain retrieval framework and the inverted index is double encrypted by use of binary random codes and random projections, and therefore, the image index with privacy protection is realized.
Owner:数安信(北京)科技有限公司

A Distributed Security Feature Selection Method Based on Power Grid Operation Data

The present invention relates to a distributed safety characteristic selection method based on power grid operation data, and belongs to the power grid safety operation technology field. The method comprises the steps of establishing a power grid power flow characteristic set INP according to the power grid operation data; for the established power grid power flow characteristic set INP, obtaining the correlation among the power grid power flow characteristics, and then obtaining the correlation degrees among the power grid power flow characteristic subsets, and merging the power grid power flow characteristic subset having the maximum correlation degree to finish the correlation grouping based on the power grid power flow characteristics; at different calculation nodes, carrying out the conventional characteristic selection on each power grid power flow characteristic subset INPi in a distributed manner, and integrating the calculation node results at coordination nodes to finish the distributed safety characteristic selection. According to the present invention, the dimensions of the power grid power flow characteristic set are reduced substantially, so that the curse of dimensionality problem in a conventional characteristic selection algorithm is solved to a large extent, and the calculation efficiency is improved.
Owner:TSINGHUA UNIV

Four-rotor unmanned aerial vehicle formation reconstruction control system based on ADP and obstacle avoidance mechanism

The invention discloses a quad-rotor unmanned aerial vehicle formation reconstruction control system based on an ADP and an obstacle avoidance mechanism, and the system comprises a finite time comprehensive disturbance observer based on a sliding mode, which carries out the estimation of the external comprehensive disturbance, and designs a cost function which reflects the uncertainty, tracking errors and controlled quantity at the same time according to a disturbance estimation value; an ADP-based formation reconstruction controller approximates an optimal cost function through a neural network and solves an optimal control law, and a potential energy function is adopted to complete collision avoidance item design of the unmanned aerial vehicle; and the finite time attitude tracking controller based on the sliding mode performs stable response tracking control on the yaw angle, the rolling angle and the pitch angle of the attitude of the unmanned aerial vehicle, and realizes formation keeping and formation transformation control of the multi-unmanned aerial vehicle formation in the interference environment. By adopting the quad-rotor unmanned aerial vehicle formation reconstruction control system, formation generation, maintenance and reconstruction control of multiple unmanned aerial vehicles under the influence of comprehensive disturbance is realized, and high-quality flight of the unmanned aerial vehicles is ensured.
Owner:TIANJIN UNIV

Word Computing Method and Device Based on Generalized General Type II Fuzzy Set

The invention relates to a word computing method and a word computing device based on a broad general type-2 fuzzy set. The method comprises the steps of building a broad general type-2 fuzzy set word model; building a univariate rule module, measuring proximity between an actual input assessment criteria linguistic value and a corresponding univariate rule module rule first component to serve as a weight and a rule consequent, and aggregating to acquire an intermediate output word linguistic value; operating to acquire a univariate rule module weight via a constrained multi-objective optimization algorithm, and aggregating the univariate rule module weight with the intermediate output word linguistic value to acquire a final output word linguistic value; determining a plurality of object relations to be evaluated through sorting via a fractional function method, or computing proximity between the final output word linguistic value and the known output word linguistic values and selecting the value with the maximum proximity to serve as the actual output word linguistic value of the object to be evaluated. According to the method and the device provided by the invention, the problem of curse of dimensionality caused by rapid increase of fuzzy rules is solved, word computing efficiency and accuracy in artificial intelligence equipment are effectively improved, and wider application prospects are provided.
Owner:HENAN UNIVERSITY OF TECHNOLOGY

Formation Reconfiguration Control System of Quadrotor UAV Based on ADP and Obstacle Avoidance Mechanism

The invention discloses a four-rotor unmanned aerial vehicle formation reconstruction control system based on ADP and obstacle avoidance mechanism, including: a limited-time comprehensive disturbance observer based on sliding mode, which estimates the external comprehensive disturbance, and simultaneously reflects it according to the disturbance estimation value design The cost function of uncertainty, tracking error and control quantity; the formation reconstruction controller based on ADP uses the neural network to approximate the optimal cost function and solve the optimal control law, and uses the potential energy function to complete the design of UAV collision avoidance items ; The finite-time attitude tracking controller based on the sliding mode performs stable response tracking control on the yaw angle, roll angle and pitch angle of the UAV attitude, and realizes the formation maintenance and formation transformation of the multi-UAV formation in the interference environment control. The present invention adopts the above-mentioned four-rotor UAV formation reconfiguration control system, realizes multi-UAV formation generation, maintenance and reconfiguration control under the influence of comprehensive disturbance, and ensures high-quality flight of UAVs.
Owner:TIANJIN UNIV

A Control Method of Inverted Pendulum Based on Neural Network and Reinforcement Learning

The invention, which belongs to the technical field of artificial intelligence and control, relates to a neural network and enhanced learning algorithm, particularly to an inverted pendulum control method based on a neural network and reinforced learning, thereby carrying out self studying to complete control on an inverted pendulum. The method is characterized in that: step one, obtaining inverted pendulum system model information; step two, obtaining state information of an inverted pendulum and initializing a neural network; step three, carrying out and completing ELM training by using a straining sample SAM; step four, controlling the inverted pendulum by using an enhanced learning controller; step five, updating the training sample and a BP neural network; and step six, checking whether a control result meets a learning termination condition; if not, returning to the step two to carry out circulation continuously; and if so, finishing the algorithm. According to the invention, a problem of easy occurrence of a curse of dimensionality in continuous state space as well as a control problem of a non-linear system having a continuous state can be solved effectively; and the updating speed becomes fast.
Owner:CHINA UNIV OF MINING & TECH

Method for optimizing minimum broken point set based on characteristics of spatial distribution

The invention discloses a method for optimizing a minimum broken point set based on characteristics of spatial distribution. The method for optimizing minimum broken point set based on the characteristics of the spatial distribution comprises the first step of dividing the whole network into k communicated subnets at the positions of a node-cutting point and an edge-cutting set, the second step of dividing four gathered subspaces of the i connected subnets into a first subpopulation, a second subpopulation, a third subpopulation and a fourth subpopulation, the third subpopulation and the first subpopulation are mutually symmetrical, the fourth subpopulation and the second subpopulation are mutually symmetrical, the third step of working out minimum broken point sets of the first subpopulation and the second subpopulation by means of binary particle swarm optimization, the fourth step of obtaining minimum broken point sets of the third subpopulation and the fourth subpopulation according to the spatial symmetrical characteristics of the minimum broken point sets, the fifth step of repeating the step 2 to the step 4 and getting the minimum broken point sets of the k connected subnets, the sixth step of conducting union set operation on the minimum broken point sets of the k connected subnets and obtaining multiple sets of the minimum broken point sets of the whole net. The method for optimizing the minimum broken point set based on the characteristics of the spatial distribution solves the problem of 'curse of dimensionality', and rapidly obtains multiple sets of the MBPS which are quite different in positions by means of the spatial symmetrical characteristics.
Owner:CHINA SOUTHERN POWER GRID COMPANY +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products