Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

50 results about "Group topology" patented technology

Any group given the discrete topology, or the indiscrete topology, is a topological group. Example 2. R under addition, and R or C under multiplication are topological groups. R and C are topological elds.

Residual-current circuit breaker remote monitoring system integrated with Internet of Things

The invention relates to the technical field of earth leakage protection monitoring, and discloses an earth leakage circuit breaker remote monitoring system integrated with the Internet of Things. An electric leakage characteristic modeling module of the system obtains real-time monitoring data, extracts current waveform characteristic parameters, identifies an abnormal waveform mode and a first occurrence time sequence, and generates an original electric leakage characteristic template; the network path generation module performs topological sorting on the monitoring nodes based on the template, establishes an equipment connection path and constructs an Internet of Things topological path; a path anomaly analysis module extracts a node sequence and screens abnormal transmission paths to obtain an abnormal path set; the risk level judgment module collects terminal node risk tags and obtains a risk level tag group through matching; and the topological structure output module counts associated nodes, divides abnormal paths, establishes a mapping relation and generates a remote monitoring topological table. The system improves the accuracy and efficiency of electric leakage monitoring, and is suitable for a complex power network environment.
Owner:ZHEJIANG WOWEI ELECTRIC CO LTD

Monitoring point layout method for defect diagnosis of drainage pipe network

A monitoring point layout method for defect diagnosis of a drainage pipe network comprises the following steps: based on pipe network geographic information system data, constructing a grouping topology table through topological structure extraction and connectivity analysis, layering nodes according to a flow collection path to form a flow-closed upstream and downstream hierarchical relationship, and combining point backtracking, collection and upstream and downstream query in a group to obtain a flow-closed upstream and downstream hierarchical relationship; point locations in each layer of node group are adjusted to ensure the flow closeness; and with the fewest monitoring points and the longest covered pipe diameter as targets, an optimal node group combination is screened through an optimization model, and a final monitoring point position is generated by fusing a pipe diameter threshold value and environmental factors. According to the method, through a flow closing algorithm and a hierarchical optimization mechanism, the problems of low efficiency, insufficient coverage and flow closing deficiency of traditional manual layout are solved, automatic and high-precision point location layout is realized, the timeliness and accuracy of defect diagnosis are remarkably improved, meanwhile, the monitoring cost is reduced, and systematic technical support is provided for operation and maintenance of the urban drainage network.
Owner:TSINGHUA SHENZHEN INTERNATIONAL GRADUATE SCHOOL +1

Wind turbine generator fault early warning method and system based on multi-modal data fusion

The invention relates to the technical field of wind turbine generator fault early warning, and discloses a wind turbine generator fault early warning method and system based on multi-modal data fusion, and the method comprises the steps: collecting the data of a multi-modal sensor, and carrying out the time-space alignment preprocessing; multi-modal features are extracted through variational mode decomposition, STL decomposition and other methods, and cross-modal fusion is achieved through dimension adaptive projection and a multi-head attention mechanism; calculating a dynamic weight based on three factors of data quality, fault type correlation and information gain, and carrying out weighted fusion; constructing a dynamic unit topological graph, and capturing cross-unit association features by using a space-time diagram convolutional network; long-time early warning with confidence is realized through double-branch gating fusion in combination with a Bayesian neural network; a multi-label classification identification multi-fault mode is adopted, and an operation and maintenance decision is optimized through an adaptive large neighborhood search algorithm. According to the method, the long early warning window of the offshore wind turbine generator can be realized, and uncertainty quantification and intelligent operation and maintenance decision support are provided.
Owner:GUODIAN POWER HUNAN LANGSHAN WIND POWER DEV CO LTD

Wind power plant short-term wind power prediction method based on data mode pre-judgment

The invention relates to the technical field of wind power plant short-term wind power prediction, in particular to a wind power plant short-term wind power prediction method based on data mode pre-judgment. Comprising the following steps: collecting historical multi-dimensional feature data, dividing the data into a core group and an edge group according to frequency, generating fine-grained codes by the core group through a sliding window, generating sparse codes by the edge group based on events, and constructing a time-space coding matrix with balanced frequency in combination with an adaptive weight algorithm; after the matrix is segmented, an intensive mode and an envelope mode are extracted, and meteorological type, unit topology and time dynamic three-level indexes are constructed and stored in a historical mode library; extracting a corresponding mode from the real-time data, matching a historical mode library through three-level indexes, and classifying the historical mode library into four association modes; based on association mode grading weight fusion prediction, forming a composite prediction model; and comparing prediction and actual measurement results in real time, and triggering an adaptive learning updating model. The method effectively balances the influence of high-frequency and low-frequency events, and improves the prediction precision and model adaptability.
Owner:SHENHUA NEW ENERGY CO LTD

Intelligent measuring tool for building mechanical and electrical installation engineering and measuring method thereof

The invention relates to the technical field of building mechanical and electrical installation, and discloses an intelligent measuring tool for building mechanical and electrical installation engineering and a measuring method thereof. The system comprises a measurement environment preparation unit, a multi-parameter acquisition unit, a spatial topology analysis unit, an error optimization unit and a measurement verification unit. The measurement environment preparation unit obtains initial environment parameters and generates an environment parameter sequence; the multi-parameter acquisition unit synchronously captures multiple types of data, calculates a spatial adaptation value and establishes a measurement feature initial set; the spatial topology analysis unit identifies the topological connection direction and conflict area of the equipment group, and generates a spatial topology deviation data set; an error optimization unit calculates a spatial positioning compensation value and adjusts a coordinate mapping relation of the equipment; and the measurement verification unit compares the deviation values, recollects the deviation values when necessary, and finally generates a measurement topological graph. The tool can realize cooperative processing and accurate measurement of multiple parameters in the building mechanical and electrical installation process, and is suitable for the field of building mechanical and electrical installation.
Owner:JIANGSU SMART WORKSHOP TECHNOLOGY RESEARCH INSTITUTE CO LTD +1

Amniotic epithelial stem cell screening method and device based on microscopic image feature extraction

The invention discloses an amniotic epithelial stem cell screening method and device based on microscopic image feature extraction, relates to the technical field of microscopic image analysis and cell screening, and is used for solving the problem that group topology and internal activity in amniotic epithelial stem cell lossless screening are difficult to collaboratively quantify. The method comprises the following steps: firstly, performing enhancement processing on a phase difference microscopic image, and extracting a kernel centroid and a global gradient energy diagram; then, constructing a Voronoi jurisdiction, and coupling a cytoplasm texture entropy and a gray scale attenuation gradient to generate a cytoplasm compactness factor; meanwhile, calculating a cell gap topology consistency index based on mapping of the Voronoi boundary and the gradient map; and finally, weighting and correcting the compactness factor by using a topological index to obtain a dryness maintenance confidence coefficient, and outputting a target coordinate. Through dual verification of geometric topology and physical gradient, combined constraint screening of internal and external characteristics of cells is realized.
Owner:PRECISION HEALTH MANAGEMENT (BEIJING) CO LTD

Department mark terminal group talkback method and system based on wireless communication

The invention belongs to the technical field of vehicle-mounted communication, and discloses a wireless communication-based ministry label terminal group talkback method and system, and the method comprises the steps: obtaining ministry label terminal data, and constructing an initial group topological relation network based on the ministry label terminal data; network optimization is carried out to obtain a group communication structure network; on the basis of a group communication structure network, a dynamic spectrum allocation algorithm is adopted to allocate communication resources for all the ministry label terminals, and optimal communication links among the ministry label terminals are calculated and issued to all the ministry label terminals; each department label terminal establishes a group talkback channel based on the received optimal communication link, and carries out the real-time transmission of the voice data in the group through the group talkback channel; meanwhile, communication parameters in the real-time transmission process are adjusted in a self-adaptive mode according to the moving state of the vehicle; according to the invention, the problem of unstable communication in a vehicle-mounted environment is effectively solved, the utilization efficiency of spectrum resources is improved, and the adaptive capacity of the system in a complex road environment is enhanced.
Owner:SHENZHEN CHEMIYUNTU INTELLIGENT TECHNOLOGY CO LTD

Hybrid microgrid coordination control method based on hierarchical regulation of interconnection converters

The invention discloses a hybrid micro-grid coordination control method based on hierarchical regulation of interconnection converters, which relates to the technical field of power electronics and comprises the following steps of: constructing physical connection among an alternating-current micro-grid, a direct-current micro-grid and the interconnection converters according to a micro-grid group topology model, and configuring a communication network to establish a communication link between adjacent interconnection converters; a distributed secondary control framework under sparse communication topology is established in each independent micro-grid, and the defects of traditional droop control are corrected through a dynamic consistency protocol; a self-adaptive power mutual aid strategy is designed for interconnection converters among micro-grids, dynamic power sharing among micro-grid clusters is achieved, and reliability of power mutual aid is ensured. Through multi-dimensional data fusion and a distributed consistency algorithm, the operating state of the micro-grid is accurately sensed, the adaptability and the communication efficiency are remarkably improved, in the aspect of multi-time scale coordination, collaborative optimization of different time scale control targets is achieved through a hierarchical control architecture and a dynamic optimization algorithm, and the system performance is improved. The dynamic response and the steady-state precision are effectively considered, and the reliability is enhanced through the multi-energy channel design.
Owner:NORTH CHINA UNIVERSITY OF TECHNOLOGY

Bridge and tunnel maintenance project whole-process intelligent management method and system

The invention relates to the technical field of data processing and engineering project process management, in particular to a full-process intelligent management method and system for bridge and tunnel maintenance engineering. The method comprises the following steps: extracting a disease geometric contour based on bridge and tunnel inner wall three-dimensional point cloud data, and calculating a centroid coordinate, a volume and a surface contour area; constructing a space retrieval sphere by using a target disease centroid, screening an adjacent disease set, and calculating a local aggregation density by combining the volume and the centroid distance; calculating the average depth of the target disease, and deducing the overlapping sharing rate of the working plane; constructing a group topology consumption equivalent through linear analysis; and inputting the extreme gradient lifting model to output an optimal repair material dosage table and a material distribution operation instruction book. According to the method, the disease space distribution and aggregation degree can be accurately evaluated, the construction loss surface overlapping probability and the material sharing potential are scientifically evaluated, the material preparation accuracy is improved, waste and cost are reduced, and the whole-process intelligent management of bridge and tunnel maintenance engineering is realized.
Owner:SHAANXI TRAFFIC CONTROL KAIDA ROAD & BRIDGE ENG CONSTR CO LTD

Drainage basin sand reduction efficiency evaluation and regulation method based on reservoir group topological structure

The invention discloses a basin sand reduction efficiency evaluation and regulation method based on a reservoir group topological structure, and belongs to the field of hydraulic engineering, and the method comprises the steps: S1, inputting basin hydrological data; s2, calculating accumulated runoff sediment transport and drawing a double-accumulation curve; s3, recognizing turning years of human activities on the water-sediment relationship through the double-accumulation curve mutation points, and dividing a natural period and a human influence period by combining the mutation points; s4, analyzing a water-sediment relationship, and calculating a drainage basin sediment reduction amount; s5, determining the topology type of the reservoir; s6, calculating an effective control drainage basin area; s7, establishing a relationship between the effective control basin area and the sand reduction rate; and S8, nonlinear regression equation modeling is carried out. The topology cutting effect theory is applied to reservoir group sand reduction efficiency evaluation, and the error problem of a traditional linear superposition model is solved; dynamic prediction of the long-term sand reduction cumulative effect of the cascade reservoir group under the watershed scale is realized; quantitative decision support is provided for newly-built reservoir site selection and built reservoir group optimization scheduling, and the river channel siltation treatment cost is reduced.
Owner:CHANGJIANG RIVER SCI RES INST CHANGJIANG WATER RESOURCES COMMISSION

Method and system for constructing power distribution network topological structure adaptive to double-high characteristic

The invention discloses a power distribution network topological structure construction method and system adaptive to a double-high characteristic, and relates to the field of topology, and the method comprises the steps: collecting double-high characteristic data through a sensor, building an evaluation system, and calculating a node comprehensive influence index; k-means clustering grouping is carried out based on the index and the geographic position, an intra-group minimum spanning tree initial topology is constructed with the transformer substation as the center, and dynamic adjustment is carried out after simulation verification; then, the inter-group power exchange requirement is determined according to the load and new energy characteristics, and the optimal contact topology is determined through multi-objective optimization; and finally, the intra-group topology and the inter-group topology are integrated to form a complete structure, and a verification model is established to test the performance under different scenes. The method has the advantages that the challenges of high-proportion new energy and power electronic equipment are effectively coped with and stable and efficient operation of a power distribution network is guaranteed by comprehensively collecting double-high data, scientifically clustering nodes, hierarchically optimizing intra-group and inter-group topologies and combining double-high scene simulation dynamic adjustment and performance verification.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD TAIZHOU POWER SUPPLY BRANCH +2

Method for identifying structure in CAD model

A computer-implemented method for identifying a topology in a three-dimensional model is described herein. A signature is obtained that includes characteristics of a first set of topologies of the three-dimensional model. A user selection of a second topology is received via a user input device. The signature is modified based on the selection to include characteristics common to the first set of topologies, the second topology, and a topological neighborhood of the second topology. And identifying other topological structures based on the modified signature.
Owner:SIMENS INDASTRI SOFTVEAR INK

Rail locomotive battery cooperative control method based on isomorphic multi-core control

The invention relates to a rail locomotive battery cooperative control method based on isomorphic multi-core control, and relates to the technical field of rail traffic electric control, and the method comprises the steps: determining a plurality of isomorphic multi-core processors of a rail locomotive, and constructing a processor core group topology; identifying the current working condition of the rail locomotive, and dynamically configuring a plurality of functional core groups in combination with the processor core group topology; a battery cluster state matrix of the rail locomotive is obtained, and a battery cooperative control strategy is generated based on the battery cluster state matrix and the current working condition through the cooperative optimization core group; and performing safety verification on the battery cooperative control strategy through the safety monitoring core group, performing cooperative control on the battery cluster by the real-time control core group according to the battery cooperative control strategy after the safety verification is passed, and continuously monitoring the execution process of cooperative control through the safety monitoring core group. The problems that a traditional heterogeneous multi-core controller is high in development cost, poor in portability and high in real-time control uncertainty are solved, and the reliability and the real-time performance of rail locomotive battery cooperative control are improved.
Owner:QINHUANGDAO TIANTUO ELECTRIC LOCOMOTIVE CO LTD

Metadata extraction based on resource attributes and user-defined policy and topology

Techniques are described herein that are capable of performing metadata extraction based on resource attributes and user-defined policy and topology. A hierarchical resource-grouping construct, which is selected from hierarchical resource-grouping constructs in a user-defined hierarchical resource-grouping topology of a cloud computing service account, is registered by enumerating at least a subset of the constructs. The subset includes the selected construct and each other construct encompassed by the selected construct. Metadata is selectively extracted from the constructs that are included in the subset to provide extracted metadata based at least in part on one or more user-defined policies, which are assigned among the constructs that are included in the subset, indicating whether the metadata is to be extracted as a result of resources associated with the constructs included in the subset having specified attributes. A searchable catalog is generated that includes the extracted metadata.
Owner:MICROSOFT TECHNOLOGY LICENSING LLC

Social simulator cognitive intervention method and system

The invention relates to the technical field of network security, and discloses a social simulator cognitive intervention method and system, and the method comprises the steps: generating a group topology based on the user interaction data of a real social network; based on the initial evaluation signal and a Bayesian optimization method, dynamically adjusting the configuration proportion of the agent node; reasoning the marginal probability of intrusive information of each agent node in the group topology based on a probabilistic graph model, screening candidate intervention nodes according to the marginal probability, deploying intervention type agent nodes based on the adjusted configuration proportion, and performing intervention on the candidate intervention nodes; the intervention result is evaluated to generate an evaluation signal, and the evaluation signal is fed back to the dynamic adjustment step to replace the initial evaluation signal. According to the method, intervention subjects of different roles can be effectively organized based on large-scale data of a complex network environment, the putting proportion is dynamically optimized, and simulation prediction is carried out on the to-be-intervened nodes based on probability graph reasoning.
Owner:UNIV OF SCI & TECH OF CHINA

Intelligent topology design method for middle-deep layer geothermal pipe group layout

The invention discloses an intelligent topology design method for middle-deep layer geothermal pipe group layout, which comprises the following steps: acquiring geothermal geological parameters and geothermal indexes of a to-be-designed area, carrying out space division and constructing a geothermal equilibrium evaluation index system, calculating a geothermal equilibrium score of the to-be-designed area, acquiring geothermal pipe group historical data and constructing a geothermal pipe group database, carrying out geothermal pipe group topology model heat exchange simulation to obtain a topology optimization coefficient, determining a geothermal pipe group topology design objective function and a geothermal pipe group topology design constraint condition, and carrying out multi-stage matching to obtain a reference geothermal pipe group topology structure; and optimizing the reference geothermal pipe group topological structure according to the geothermal pipe group topological design objective function to obtain an optimal geothermal pipe group topological structure. According to the method, the extraction efficiency of geothermal energy and the economical efficiency of a geothermal system can be remarkably improved, and meanwhile, the method has important significance on intelligent development of geothermal pipe group layout design.
Owner:CHINA ACAD OF BUILDING RES +1

Earthquake disaster scenario recognition method and system based on deep learning

The application belongs to the technical field of earthquake disaster scenario identification, and discloses an earthquake disaster scenario identification method based on deep learning, and the specific steps are as follows: S1, data acquisition and preprocessing S1.1, multi-source heterogeneous data acquisition, a comprehensive database containing seismic waveform data, ground deformation data, building structure data, geographic information data and historical disaster record data is established. Through the fusion of 3D convolution network, graph attention mechanism, space-time LSTM and adaptive cross-modal attention fusion technology, the joint modeling of seismic waveform space-time evolution law, ground deformation spatial distribution characteristics, building group topology vulnerability and disaster chain time sequence correlation is realized, the representation ability of complex nonlinear disaster mode is effectively improved, the disaster assessment response time is shortened to sub-second level through mixed precision quantization and edge computing deployment, and high identification accuracy is still maintained in the scene of strong noise and data loss by combining a multi-task classifier and a physical constraint verification mechanism.
Owner:辽宁省地震局

Microgrid group topology switching stability analysis method and system

The invention provides a microgrid group topology switching stability analysis method and system. The method comprises the steps that modeling is conducted on a microgrid system, and a Gaboff equation is introduced; solving a giboff equation in the micro-grid system by using a neural network to obtain a Lyapunov function; analyzing stability through a Lyapunov function, and calculating an attraction domain of the system; and further analyzing the stability of the micro-grid group system under different topology configurations so as to ensure that the system topology switching is stable. The technical problems that the dependence degree on explicit mathematical derivation or an approximate model is high, error accumulation stability evaluation is not accurate, and stability evaluation is not comprehensive are solved.
Owner:HEFEI UNIV OF TECH

Method of identifying structures in a CAD model

PCT designated stage expiredWO2024253635A1Geometric CADConstraint-based CADAlgorithmUser input
A computer-implemented method for identifying topological structures in a three-dimensional model is described. A signature including characteristics of a first set of topological structures of the three-dimensional model is obtained. A selection of a second topological structure by a user is received via a user input device. The signature is modified based on the selection to include characteristics common to the first set of topological structures, the second topological structure, and a topological neighborhood of the second topological structure. Further topological structures are identified based on the modified signature.
Owner:SIEMENS INDUSTRY SOFTWARE INC

Network type electrolytic water hydrogen production unit topology control method adaptive to new energy direct connection

The application discloses a network-constructing type electrolytic water hydrogen production unit topology control method suitable for new energy direct connection, and relates to the field of hydrogen production unit topology control. The application constructs a network-constructing type control system for a new energy direct connection scene, forms a unified closed-loop control structure in terms of power modeling, damping adjustment, electricity-hydrogen cooperation and impedance reconstruction, and enables the rectifier to have stronger dynamic support capability under weak power grid conditions. The application can timely enhance system damping in the oscillation energy growth stage and reduce low-frequency and subsynchronous oscillation amplitude. The application realizes dynamic cooperation of the electrolytic cell and the rectifier, weakens the influence of negative resistance characteristics on system stability, and improves the equivalent output impedance of the rectifier under voltage disturbance, so as to improve the equivalent short-circuit capacity and damping ratio of the system.
Owner:CHENGDU HENGHUA ELECTRIC POWER TECH CONSULTING CO LTD

Methods, apparatus, equipment and dielectrics for determining the topology of supercapacitor modules

PendingCN122310727ADielectricSupercapacitor
This application provides a method, apparatus, device, and medium for determining the topology of a supercapacitor module, comprising: generating virtual values ​​of high-sensitivity parameters and characteristic parameters based on the identified values ​​of high-sensitivity parameters and experimental values ​​of characteristic parameters corresponding to all supercapacitor cells; constructing a simulation model of the supercapacitor module corresponding to each test topology based on the generated virtual values ​​of high-sensitivity parameters and characteristic parameters; determining multiple average discharge times corresponding to each test topology based on the simulation model of the supercapacitor module corresponding to each test topology and a preset number of simulation rounds; and determining the target topology of the supercapacitor module based on the multiple average discharge times corresponding to each test topology. Using the technical solution provided in this application, effective comparison of the performance of different supercapacitor module topologies is achieved, the optimal topology is selected, and the module performance is optimized.
Owner:BEIJING INST OF TECH

Remote monitoring system of leakage circuit breaker integrated with internet of things

The application relates to the technical field of leakage protection monitoring, and discloses a leakage circuit breaker remote monitoring system integrated with an Internet of Things. A leakage feature modeling module of the system acquires real-time monitoring data, extracts current waveform feature parameters, identifies abnormal waveform modes and first occurrence time sequences, and generates an original leakage feature template; a network path generation module sorts monitoring node topologies based on the template, establishes device connection paths, and constructs an Internet of Things topology path; a path anomaly analysis module extracts node sequences based on the topology path, filters abnormal transmission paths to obtain an abnormal path set; a risk level judgment module collects terminal node risk labels, matches to obtain a risk level label group; and a topology structure output module counts associated nodes, divides abnormal paths, establishes a mapping relationship, and generates a remote monitoring topology table. The system improves the accuracy and efficiency of leakage monitoring and is suitable for complex power network environments.
Owner:ZHEJIANG WOWEI ELECTRIC CO LTD

Topology control method of network-forming type water electrolysis hydrogen production unit adapting to new energy direct connection

The invention discloses a topology control method of a network-forming type water electrolysis hydrogen production unit adapting to new energy direct connection, and relates to the field of topology control of hydrogen production units. According to the invention, a network construction type control system oriented to a new energy direct connection scene is constructed, and a unified closed-loop control structure is formed on the aspects of power modeling, damping adjustment, electricity-hydrogen cooperation and impedance reconstruction, so that the rectifier has stronger dynamic supporting capability under the condition of a weak power grid; the system damping can be enhanced in time in the oscillation energy increasing stage, and the low-frequency and subsynchronous oscillation amplitude is reduced; dynamic synergy of the electrolytic cell and the rectifier is achieved, and the influence of negative resistance characteristics on system stability is weakened; and the equivalent output impedance of the rectifier is improved under the condition of voltage disturbance, so that the equivalent short-circuit capacity and damping ratio of the system are improved.
Owner:CHENGDU HENGHUA ELECTRIC POWER TECH CONSULTING CO LTD

OTN subnet same route analysis method and device, electronic equipment and storage medium

The invention provides an OTN subnet same route analysis method and device, electronic equipment and a storage medium, and belongs to the technical field of communication networks, and the method comprises the steps: obtaining a network topology structure of an optical transport network OTN subnet; based on a network topology structure, grouping topology connection relationships among network elements in the OTN subnet to obtain a plurality of topology groups; matching out an optical cable section, a bearing section and a bearing point associated with each topology group; and performing same-route analysis based on the optical cable section, the bearing section and the bearing point associated with each topology group to obtain a same-route analysis result in the OTN subnet. According to the OTN subnet same-route analysis method provided by the invention, the optical cable section, the bearing section and the bearing point associated with each topology group are subjected to same-route analysis to obtain the same-route analysis result in the OTN subnet, so that the efficiency of same-route analysis of the OTN subnet is remarkably improved, the existing network same-route hidden danger can be found and eliminated in time, and the safety of the OTN subnet is improved. Therefore, the networking safety and reliability of the transmission network are improved.
Owner:INSPUR TIANYUAN COMM INFORMATION SYST CO LTD

Topological pruning optimization method based on multi-step network attack identification and scenario reconstruction

ActiveCN116915450BData packData stream
The application discloses a topology pruning optimization method based on multi-step network attack identification and scene reconstruction, and specifically comprises the following steps: step 1, defining the related attributes of data stream five-tuple, topology graph node and directed edge; step 2, preprocessing Pcap data packets, and constructing the initial network topology graph G of the entire attack process on the data set start ; step 3, proposing a model based on a convolutional neural network and a decision tree; step 4, identifying the attack type based on the convolutional neural network in step 3, performing the second pruning on the attack types and attack modes that do not match, performing the third pruning based on the time sequence correlation between each attack step of the multi-step attack, and finally, the pruned image is the reconstructed and simplified multi-step network attack scene; the application can obtain the initial attack scene through topology correlation analysis, further remove a large amount of redundant information, and finally construct the topology graph that is the most simplified and closest to the attack scene.
Owner:XIAN UNIV OF TECH

Complex part design method and system based on digital-real fusion test

The invention discloses a complex part design method and system based on a digital-real fusion test, and belongs to the field of electronic engineering and computer science, and the method comprises the steps: designing a model construction module of a complex part, then, physical constraints in the entity environment and additive manufacturing constraints in the manufacturing process are introduced, iteration and verification of the model are completed based on the additive manufacturing technology and user requirements, and a complex part model with data and real fusion is obtained; a complex part model topological optimization module is designed, the module carries out finite element division on an original model, optimization parameters are set based on multiple topological optimization algorithms and an artificial neural network algorithm, and a group of topological optimization result models are obtained; and a detection and correction module of the complex part model is designed, the module constructs an evaluation system based on user requirements and model constraints, the optimization model is evaluated through digital testing, and an optimal design scheme or correction suggestion is given.
Owner:BEIHANG UNIV

A topology-based microgrid protection setting adaptive setting method and system

PendingCN122418557AMicrogridGroup topology
This invention discloses a topology-based adaptive setting method and system for microgrid protection settings. The method generates typical grid-connected and off-grid topologies based on the microgrid's topology model. For each topology group, core features are calculated as typical core features. Protection settings are calculated for each topology group, generating a typical topology setting set. The microgrid's operating status is collected in real time. When the microgrid's operating status changes, the core features are recalculated to obtain new core features. A comprehensive similarity is calculated based on the current operating mode. Typical topologies are selected as candidate reference groups based on the comprehensive similarity. The current protection settings are then corrected based on the typical topology setting set corresponding to the candidate reference groups. This invention automates the entire setting process, improves the reliability and response speed of the protection system, and is applicable to microgrids of various sizes containing distributed power sources, energy storage devices, and multiple lines.
Owner:NARI TECH CO LTD +2

Power distribution network mutual aid operation control method and system under topology reconstruction

The invention discloses a power distribution network mutual aid operation control method and system under topology reconstruction, and relates to the related field of intelligent power distribution networks, and the method comprises the steps: obtaining the multi-source real-time information of a power distribution network, and constructing a multi-scale topology perception state tensor through the fusion of a switch connection relation and a line congestion degree; triggering a topology reconstruction demand to generate a plurality of groups of topology switching candidates; performing multi-scene power flow evolution and protection coordination simulation to construct a feasible candidate topology set; a mutual aid contribution degree matrix is introduced, a supply and demand complementation relation graph between nodes is constructed, node voltage recovery indexes, line load balance indexes and renewable absorption improvement rates under all candidate topologies are calculated, and an operation index set is established; and after a multi-objective evaluation function is constructed, performing double-domain optimization on the feasible candidate topology set, and outputting a mutual aid operation control strategy. According to the method and the device, the technical problem of insufficient mutual aid response accuracy of the existing mutual aid operation control of the power distribution network is solved, and the technical effect of improving the mutual aid operation regulation and control accuracy of the power distribution network is achieved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH +1

Method and system for suppressing output current fluctuation of open-winding topology dual-inverter system based on carrier modulation

The invention discloses a carrier modulation-based output current fluctuation suppression method and a carrier modulation-based output current fluctuation suppression system for an open-winding topology dual-inverter system. According to the method, the output current fluctuation quantity effective value is used as an evaluation index, and the quality of the output current waveform of the inverter under the action of different vector sequences is quantified, so that the optimal vector sequence is obtained for carrier modulation. The method comprises the following steps: (1) expanding 6 basic vector sequences in a traditional modulation strategy to 19 basic vector sequences; (2) taking the effective value of the fluctuation quantity of the output current as an evaluation index, and quantitatively analyzing the waveform quality of the output current of the inverter under the action of different vector sequences; (3) determining the action area of each vector sequence by taking the minimum effective value of the fluctuation quantity of the stator flux linkage as a constraint condition, and forming a carrier modulation strategy with the optimal current waveform quality; and (4) based on the carrier modulation strategy of the optimal modulation sequence, on the premise of not increasing the switching frequency of the inverter, the fluctuation of the output current of the inverter is effectively reduced, and the current waveform quality is optimized.
Owner:ELECTRIC POWER SCI & RES INST OF STATE GRID TIANJIN ELECTRIC POWER CO +2

Using and updating topological relationships between a set of nodes in event clustering

Disclosed is the use and updating of topological relationships between a set of nodes in event clustering. A current event occurs at a current node. A first group of related events includes a first event that occurs at a first node and is temporally related to the current event. The first group does not include any event that is topologically related to the current event based on an existing set of topological relationships. A level of mutual dependence between (a) the occurrence of an event at the current node and (b) the occurrence of an event at the first node is determined. Based on the level of mutual dependence, the current event is added to the first group. In addition, an event-based topological relationship between a first node and a second node is added to the set of topological relationships. Subsequently, a group of new events can be determined based on the event-based topological relationship between the first node and the second node.
Owner:ORACLE INT CORP