The utility model discloses
civil engineering foundation pit excavation equipment, and relates to the technical field of
civil engineering equipment, in particular to the
civil engineering foundation pit excavation equipment which comprises a bulldozer body, a bucket is installed at the driving arm end of the bulldozer body through a bayonet, and a desilting
assembly is arranged on the bucket. The desilting
assembly comprises two driving pieces and a steel
wire rope, and the two driving pieces are arranged on the two sides of the bucket in a sliding mode; through cooperative arrangement of the two sets of driving parts, the steel
wire rope and the vibration part, the civil
engineering foundation pit excavation equipment has the effect of effectively
cutting off clay on the bucket, the two sets of driving parts drive the steel
wire rope to move on the soil shoveling face of the bucket, the moving steel wire
rope cuts the clay on the soil shoveling face of the bucket, and the vibration part vibrates the soil shoveling face of the bucket. A
vibration source is provided for the bucket through the vibration piece, so that when the bucket cuts off clay through the steel wire
rope, vibration force is applied to the clay, the clay is effectively separated from the bucket under the conditions of
cutting and vibration, and the purpose of effectively
cutting off the clay on the bucket is achieved.