The invention discloses a parallel
septic tank construction method applied to double-layer deep and thick
sludge geology, and relates to the technical field of
building construction, the method comprises the following steps: S1, construction preparation; s2, supporting construction; s3, foundation reinforcement construction; s4, implanting a core
pile: vertically pressing the core
pile into the center of the stirring
pile before initial setting of the stirring pile; s5, inner supports are installed, specifically, enclosing purlins and steel supports are constructed; s6, layered excavation is conducted, specifically, after the stirring piles reach the design strength, earthwork layered excavation is conducted till the foundation is reached; s7, pouring a support changing plate: pouring a
reinforced concrete support changing plate at the bottom of the foundation pit; s8, parallel
septic tank foundation construction is conducted, specifically, reinforcing steel bars are bound on the support changing plate, a formwork is erected, and a
septic tank foundation is poured; s9, dismantling the inner support: dismantling the enclosing
purlin and the steel support after the support plate to be replaced and the parallel septic tank foundation reach the design strength; s10, mounting a septic tank: hoisting the prefabricated septic tank in place; s11, the steel sheet piles are dismantled; and S12, septic tank backfilling construction is conducted. The construction method has the effect of improving the construction quality.