The utility model belongs to ship
fuel supply technical field, specifically disclose LNG power ship
fuel supply system delivery line, including cold box, gas delivery section, gas input section, GVU valve box, air input
pipe, air output
pipe, fan and
gas engine, gas delivery section is double -walled
pipe structure, including inner tube and the outer tube of
bushing in the outer side of inner tube, GVU valve box includes valve piece and casing, cold box, inner tube, valve piece, gas input section and
gas engine are connected in proper order, constitute gas delivery line, air input pipe, casing, outer tube, fan and air output section constitute air delivery line, and air input pipe is linked together with heat exchange structure. The utility model's gas delivery section uses double -walled pipe all -time, not only can promote the service life of
gas pipeline, can also guarantee the stability of gas state in
gas pipeline inside, and through heat exchange structure to the air of entering outer tube heat exchange treatment, guarantee the stability of
air temperature of entering outer tube, and then guarantee the state of inner tube gas.