Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

59results about How to "Save filling material" patented technology

Method for filling friction stir welding keyhole by using T-shaped filling block and bitless stirring head

The invention discloses a method for filling a friction stir welding keyhole by using a T-shaped filling block and a bitless stirring head. The method comprises the following steps of: (1) performing chambering on the upper part of the friction stir welding keyhole, machining to form a table conical shape of which the upper side is wide and the lower side is narrow, and precleaning the inner wall of the friction stir welding keyhole; (2) preparing the T-shaped filling block; (3) prearranging the T-shaped filling block in a table conical hole, so that a T-shaped endshield is exposed with a certain height; (4) starting the bitless stirring head to rotate and press, so that the T-shaped filling block is subjected to rotary extrusion towards the keyhole; (5) when the stirring head is pressed to be flush with upper surfaces of workpieces to be subjected to repair welding basically, performing in-situ friction for a certain time; and (6) removing trimmings, so that the filling surface is smooth and beautiful. The method has the advantages that: tools (bitless tools) are easy to design and manufacture, the tools are not needed to be replaced when the keyholes are repaired in batch, the filling material is saved, the keyhole is not thinned or is thinned slightly after being welded, and membranes of the side wall and the bottom are well removed, so that the side wall and the bottom can be combined compactly. The method also can be used for repairing defects of casting surfaces and weld joints.
Owner:XI AN JIAOTONG UNIV

Building method of filled wall body for gob-side entry retaining of large-inclination coal seam

The invention relates to a building method of a filled wall body for gob-side entry retaining of a large-inclination coal seam, which comprises the following steps: erecting dense individual props on the entry retaining side on the rear part of a heading stope to retain roadway space on the rear part of the heading stope, erecting anti-tilting side supports along the dense individual props, laying reinforcing fabric and high-strength fiber cloth on the side of the dense individual props close to the gob, and building a structure used for intercepting waste rocks in the gob; and when the dropped waste rocks in the gob automatically slide along the large-inclination footwall to the waste rock blocking structure formed by the reinforcing fabric and the high-strength fiber cloth under the effect of the dead weight and pile up to a certain degree, grouting and cementing part of the dropped waste rocks near the entry retaining side for consolidation, thereby forming the filled wall body, and repeating the steps in sequence along with the advancement of the heading stope until the whole filled wall body for gob-side entry retaining. The invention has the advantages of simple method and high working efficiency, the filled wall body built in the method is of high strength and is also economical and practical, and the method is suitable for the building of the filled wall body for gob-side entry retaining under the high-inclination condition.
Owner:CHINA UNIV OF MINING & TECH

Method of brazing alloy extrusion and backflow stuffing for carrying out stirring and friction of welding keyhole

The invention discloses a method of brazing alloy extrusion and backflow stuffing for carrying out stirring and friction of a welding keyhole. The method comprises the following steps that brazing alloy is preset in a keyhole, then a stuffing block is added in the keyhole, a T-typed stuffing block is subjected to rotation and friction through a needleless stirring head and is compressed down, the brazing alloy is heated to be softened, liquid brazing alloy is extruded and stirred by the stuffing block in an enclosed environment formed by the keyhole and the stuffing block, the liquid brazing alloy is stuffed in a driving and flowing way, and the liquid brazing alloy is enabled to be filled into a gap on the bottom of the keyhole; and due to the property of non-compression of the liquid brazing alloy, the liquid brazing alloy back flows along a side wall interface upward to stuff the remaining gap of the side wall, the side wall interface is dissolved, and compact alloying of the side wall and the bottom interface is realized. When the welding keyhole is repaired in batches, the replacement of tools is not needed, reduction of a welded keyhole does not exist or is extremely small, stuffing materials are saved, preset operation of the brazing alloy and the stuffing block is convenient, and the shaping of a surface of a stirring area is smooth.
Owner:XI AN JIAOTONG UNIV

Interval skip-mining type filling coal mining method

The invention provides an interval skip-mining type filling coal mining method and belongs to the technical field of coal mine filling coal mining methods. The interval skip-mining type filling coal mining method comprises the steps that a first open-off cut is dug at the tail end of a butt entry, a second open-off cut is dug a certain distance away from the first open-off cut, and mining is conducted at the position of the second open-off cut with the wall type system coal mining method after the second open-off cut is well dug; a third open-off cut is dug a certain distance away from the second open-off cut, a gob formed after mining is conducted at the position of the second open-off cut is filled while the third open-off cut is dug, and the rest operation is conducted by analogy till mining is conducted on a mining stopping line. By the adoption of the interval skip-mining type filling coal mining method, mining can be conducted under the condition that the two ends are supported, sequential mining and sequential filling are achieved, the integrity of a base plate of a roof is guaranteed, movement of overlying rock is reduced, and the purpose of surface subsidence control is achieved; after mining with filling is completed, coal pillars left after mining do not need to be filled, filling materials are reduced, and filling cost is reduced.
Owner:SHANDONG UNIV OF SCI & TECH

Obligate cavity channel gob-side entry retaining wall filling method

An obligate cavity channel gob-side entry retaining wall filling method is characterized in that a cylinder hole is obligated on a formwork, a thin-wall steel cylinder penetrates through the formwork, a lane is located on the high position, a goaf area us located on the low position, a filling wall with a cavity is formed after filling, wall using materials are reduced, and wall strength is not influenced. An open-close door is installed at the hole opening, when the lane deforms, cannot normally use and needs to conduct dinting, a large quantity of gangue produced after lane dinting can be thrown to the inside by opening the door, and the lane is distributed in an air return along groove. Due to existence of a coal bed pitch, inbreak gangue surges up the goaf area of the transportation along grooves under the effect of gravity, in addition, side direction breaking is carried out on the top plate during caving, a lateral breaking angle is formed, a space at a button angle of the filling wall enables the inbreak gangue to be unable to achieving a filling area, a great quantity of spaces are left on the filling wall side, throwing gangue directly enters the goaf area under the effect of gravity, and deposit spaces are provided for processing undercover gangue.
Owner:CHINA UNIV OF MINING & TECH

TIG welding gun

The invention provides a TIG welding gun. The TIG welding gun comprises a water electric pipe positioned in the axis position, a core rod arranged at the outer periphery of the water electric pipe, a tungsten electrode clamp fixed at one end of the core rod, an electric conducting connection base fixed at the other end of the core rod and connected with the water electric pipe, a water cooling jacket arranged at the outer side of the core rod, an insulation block fixedly connected between the water cooling jacket and the electric conducting connection base in the axial direction, a shell fixed at the outer periphery of the water cooling jacket, and a water outlet pipe fixed on the electric conducting connection base. An isolation part is arranged in the core rod near the tungsten electrode clamp. The water electric pipe extends to the position of the isolation part, and is provided with a first water outlet hole penetrating through in the radial direction. A first water cavity communicated with the first water outlet hole is formed between the core rod and the water electric pipe. The electric conducting connection base is provided with a first water inlet communicated with the first water cavity. A second water cavity is formed between the water cooling jacket and the shell. The electric conducting connection base and the insulation block are formed with a first communication hole for communicating the first water inlet with the second water cavity and a second communication hole for communicating the second water cavity with the water outlet pipe.
Owner:HUAHENG WELDING

Extra-thick coal seam strip-type filling and mining method relying on steel mould trolleys

The invention discloses an extra-thick coal seam strip-type filling and mining method relying on steel mould trolleys. The extra-thick seam strip-type filling and mining method is used for 'three-under' extra-thick coal seam mining. After coal seam mining, an upper layer hard roof forms a cantilever plate structure, under the cover of the stable cantilever structure, a row of steel mould trolleys arranged parallel to the stope face jointly form a strip filling template to fill a goaf closely adjacent to the stope face. According to the extra-thick coal seam strip-type filling and mining method, the traditional steel mould trolley for tunnel lining is modified, the construction technology is simplified, the planned filling space of the goaf is filled at full height at one time, and false roof laying of slicing filling is avoided; a partition wall is not needed to be constructed, partial filling can be achieved, and filling materials are saved; a mode of combining filling and mining is adopted, filling and mining are pushed forwards simultaneously, coal pillars are not needed to be reserved and arranged, secondary disturbance caused by recovering the coal pillars is avoided, the subsidence of an overlying rock is strictly controlled, and the safety of ground buildings is ensured; and standardized and high modular steel mould trolleys are selected, and can be adapted to filling spaces with various sections and reused.
Owner:TAIYUAN UNIV OF TECH

Plate intelligent subpackaging method and device

The invention discloses a plate intelligent subpackaging method and device, and belongs to the field of plate-type furniture packaging. The plate intelligent subpackaging method comprises the steps: an order of plate-type furniture is obtained, and the subpackaging state of the order is read; when the order is in an un-subpackaged state, plates not needing to be pre-subpackaged and needing to be packaged in a whole cabinet or whole package mode in the order are filtered, the rest of plates are classified according to the thickness, and all the plates in any category are the same in thickness;the plates of each type are arranged and subpackaged sequentially according to the large, middle and small size sequence till each package meets the reference weight and all the plates are arranged; and all obtained package information is preserved, and the order is updated to be in the subpackaged state. The plate intelligent subpackaging device comprises an acquisition module, a classification module, a subpackaging module and an updating module. The working difficulty and burden of packaging workers of a plate-type furniture workshop are greatly relieved, the productivity of the packaging workshop is improved, and the package quality after the plates are packaged is improved.
Owner:司空定制家居科技有限公司

Uplift pile uplift force detection method

InactiveCN112459141AEasy to useSolve the problem of negative friction resistance affecting test resultsFoundation testingTest beamJackscrew
The invention discloses an uplift pile uplift force detection method. A detection device comprises an uplift pile, a steel plate, a force transmission member and a test beam, wherein the uplift pile is poured in a pile hole, a plurality of main reinforcements exposed out of the upper end of the uplift pile are arranged in the uplift pile, a hooking and pulling member is welded to one end, exposedout of the uplift pile, of each main reinforcement, the two ends of the force transmission member are detachably connected with the bottom face of the test beam and the top face of the steel plate respectively, the test beam is placed on supporting piers and separated from the ground outside the pile hole at intervals, a jack for applying pile pulling force to the uplift pile is arranged between the test beam and the ground, and the uplift pile is hung on the steel plate through the hooking and pulling members. During construction, a perfect detection state that the upper non-effective pile length is a hollow pile is reserved, and the problem that the negative friction resistance of the non-effective pile length influences a detection result is effectively solved; and meanwhile, the recyclable force transmission member is adopted for detecting the pulling resistance of the effective pile length, compared with an existing solution in the market, construction is convenient, the engineering cost can be greatly saved, and pile body filling materials in an empty hole area are effectively saved.
Owner:WUHAN CONSTR ENG

Topological optimization method for interval contraction sound insulation structure

The invention discloses a topological optimization method for an interval contraction sound insulation structure, which comprises the following steps of performing acoustic modeling on the interval contraction sound insulation structure according to a Helmholtz equation, and proposing a new interpolation function for continuous material interpolation of density and volume modulus by adopting a topological optimization method based on a variable density method. A constraint condition of the volume fraction of the material in the design domain is introduced, sensitivity analysis is carried out on an objective function and the constraint function by using an adjoint method by taking the minimized quadratic sum of the transmission sound pressure of the target frequency band in the evaluation domain as the objective function, and the objective function is optimized by using a moving asymptotic line method to obtain the optimal distribution of the solid material in the design domain; and finally, broadband sound insulation of the ventilation sound barrier in a limited space is realized. The method gets rid of the traditional thought of designing sound insulation structure parameters by experience, takes sound insulation frequency band widening as a target, and reversely designs material distribution by means of a topological optimization algorithm to obtain the optimal sound barrierwith the characteristics of broadband, ventilation, light weight and the like.
Owner:NANJING UNIV

A Method for Partial Filling of Gobs According to the Characteristics of Roof Caving

ActiveCN106150545BControl deformation damagePromote recoveryMaterial fill-upStress concentrationEngineering
The invention discloses a method for conducting goaf partial filling according to roof caving characteristics. The method comprises the steps that high-strength filling strips which are perpendicular or parallel to the mining direction are arranged in a goaf according to an initial caving pace of an immediate roof of the goaf to control caving of the immediate roof; multiple rows of high-strength filling monomers with different shapes are arranged among the filling strips at intervals according to the bending deflection of the immediate roof to control deformation of the immediate roof; large-range filling is conducted on positions with special geological structures to control stress concentration points; a high-strength filling body-immediate roof structure control system is formed, and an upper overlying strata is supported by the high-strength filling body and the immediate roof; narrow filling strip goaf-side retained roadways are arranged, the roadway driving workload of the next working face is reduced, and the goaf is filled in a sealed mode. According to the method for conducting goaf partial filling according to the roof caving characteristics, filling materials are saved, and the filling cost is reduced; the filling structure bodies with different shapes are arranged on key positions, the control effect on the roof is good, and a whole-region chain reaction caused by destruction of partial filling bodies is prevented; a large amount of underground space formed through filling can be reused.
Owner:TAIYUAN UNIV OF TECH

Downhole mining, screening, mixing and filling integrated gangue cement structure filling system and method

ActiveCN107246279BRealize the balance of mining and chargingHigh liftMaterial fill-upFilling materialsSlurry
The invention discloses an underground selection, screening and stirring integrated gangue cementation construction filling system and method. The system comprises an underground coal and gangue separating device, an underground gangue crushing and screening device, an underground filling material weighing and stirring device, an underground filling material slurry conveying device, an underground filling material slurry casting device and a PLC control device. The filling method comprises the steps that raw coal mined from a driving working face and a mining working face is transported to a raw coal bunker of a mining area, separated clean coal is transported to a clean coal bunker and is lifted by a main well, separated gangues are fed into a gangue crushing machine, and the gangues undergoing secondary smashing are fed into a gangue screening device; various raw filling materials are respectively fed into a burdening hopper, and filtered mine water is added to obtain filling material pulp through stirring after even and drying stirring; the filling material pulp is transported to a filling working face by a stirring transportation truck, then is cast into a filling formwork by a movable filling pump truck and is evenly vibrated by using a vibration device. By adopting the system and method, the mine transportation and lifting pressure is reduced, the working efficiency is improved, and the mining-filling balance of coal mine waste is achieved.
Owner:TAIYUAN UNIV OF TECH

Method for filling friction stir welding keyhole by using T-shaped filling block and bitless stirring head

The invention discloses a method for filling a friction stir welding keyhole by using a T-shaped filling block and a bitless stirring head. The method comprises the following steps of: (1) performing chambering on the upper part of the friction stir welding keyhole, machining to form a table conical shape of which the upper side is wide and the lower side is narrow, and precleaning the inner wall of the friction stir welding keyhole; (2) preparing the T-shaped filling block; (3) prearranging the T-shaped filling block in a table conical hole, so that a T-shaped endshield is exposed with a certain height; (4) starting the bitless stirring head to rotate and press, so that the T-shaped filling block is subjected to rotary extrusion towards the keyhole; (5) when the stirring head is pressed to be flush with upper surfaces of workpieces to be subjected to repair welding basically, performing in-situ friction for a certain time; and (6) removing trimmings, so that the filling surface is smooth and beautiful. The method has the advantages that: tools (bitless tools) are easy to design and manufacture, the tools are not needed to be replaced when the keyholes are repaired in batch, the filling material is saved, the keyhole is not thinned or is thinned slightly after being welded, and membranes of the side wall and the bottom are well removed, so that the side wall and the bottom can be combined compactly. The method also can be used for repairing defects of casting surfaces and weld joints.
Owner:XI AN JIAOTONG UNIV

A Method for Partial Filling of Gob Area According to Surface Subsidence Characteristics

The invention discloses a method for conducting goaf partial filling according to ground surface subsidence characteristics. The method comprises the steps that the positions of filling bodies are designed according to a ground surface subsidence contour map; complete filling is conducted within a central area range, and a subsidence center is controlled; multiple circles of filling strips are arranged outside the complete filling range, and a larger subsidence region is controlled; multiple rows of filling monomers are arranged outside the filling strips, and a subsidence edge region is controlled; the filling bodies with different shapes are arranged in a goaf in a targeted mode, deformation destruction and ground surface subsidence of a roof are controlled, a filling body-roof structure control system is formed, and deformation destruction and ground surface subsidence of an upper overlying strata are controlled; narrow filling strip goaf-side retained roadways are arranged, the roadway driving workload of the next working face is reduced, and the goaf is filled in a sealed mode. According to the method for conducting goaf partial filling according to the ground surface subsidence characteristics, deformation destruction and ground surface subsidence of the roof can be effectively controlled, the recovery rate of coal mining under buildings, railways and water bodies is increased, and the environment is protected; filling materials are saved, the filling cost is reduced, and a large amount of underground space formed through filling is reused.
Owner:TAIYUAN UNIV OF TECH

A filling coal mining method with skip mining at intervals

The invention provides an interval skip-mining type filling coal mining method and belongs to the technical field of coal mine filling coal mining methods. The interval skip-mining type filling coal mining method comprises the steps that a first open-off cut is dug at the tail end of a butt entry, a second open-off cut is dug a certain distance away from the first open-off cut, and mining is conducted at the position of the second open-off cut with the wall type system coal mining method after the second open-off cut is well dug; a third open-off cut is dug a certain distance away from the second open-off cut, a gob formed after mining is conducted at the position of the second open-off cut is filled while the third open-off cut is dug, and the rest operation is conducted by analogy till mining is conducted on a mining stopping line. By the adoption of the interval skip-mining type filling coal mining method, mining can be conducted under the condition that the two ends are supported, sequential mining and sequential filling are achieved, the integrity of a base plate of a roof is guaranteed, movement of overlying rock is reduced, and the purpose of surface subsidence control is achieved; after mining with filling is completed, coal pillars left after mining do not need to be filled, filling materials are reduced, and filling cost is reduced.
Owner:SHANDONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products