Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

26results about How to "Avoid construction accidents" patented technology

Intelligent construction scheme optimization system based on building decoration

The invention discloses an intelligent construction scheme optimization system based on building decoration, and relates to the technical field of building decoration. The system comprises four modules, and the constructor selection module is used for selecting a construction principal according to the performance value of the constructor. The building material monitoring module is used for dividing the storage area into a plurality of monitoring areas and marking the monitoring areas as deviation or overlapping areas according to the area overlap ratio; calculating a zone condition value, and marking the zone condition value as a suitable or non-suitable zone; and calculating a storage score value, and generating a storage early warning signal or a storage qualified signal. The construction safety supervision and analysis module is used for monitoring a construction site in real time and generating a construction early warning signal; calculating an operation monitoring value; and calculating a construction environment coefficient, and generating an environment control abnormal signal or an environment control normal signal. The construction progress risk monitoring module is used for collecting delay data, calculating progress influence values and generating influence signals of different levels; and adjusting the progress plan. According to the system, through intelligent management, the construction efficiency and safety are improved, and the construction cost is reduced.
Owner:HUIZHOU XIANGZHANXING CONSTRUCTION CO LTD

Safety monitoring method and equipment for tunnel construction, medium and product

The invention relates to the technical field of safety monitoring, in particular to a safety monitoring method and device for tunnel construction, a medium and a product, and the method comprises the steps: carrying out the monitoring target analysis based on a tunnel design file and a construction safety specification, and determining a safety monitoring target. Then, sensor deployment analysis is carried out based on the safety monitoring target and the tunnel design file, and sensor deployment information is sent to an installation personnel mobile terminal; sensors are scientifically deployed according to a tunnel design file and a safety monitoring target, it is ensured that monitoring points are comprehensively and reasonably covered, and the accuracy and reliability of monitoring data are improved. And when a sensor deployment completion instruction is detected, acquiring sensor data sent by each sensor in real time, performing construction safety analysis based on each sensor data, and determining an environment safety monitoring result. Sensor data are acquired in real time, construction safety analysis is performed, potential safety hazards in the construction process can be quickly responded, and the efficiency and accuracy of tunnel construction safety monitoring are improved.
Owner:CHINA NUCLEAR SIDA CONSTR SUPERVISION CO LTD

Automatic sensing monitoring system and method for pipe jacking underneath pass construction process

PendingCN119533399AImprove deformation monitoring efficiencyAccurate acquisitionHeight/levelling measurementThe InternetData acquisition
The invention discloses an automatic sensing and monitoring system for a pipe jacking underneath pass construction process. The automatic sensing and monitoring system comprises a data acquisition system, an internet of things, a data processing system, a cloud server and a remote management terminal, the data acquisition system is used for acquiring settlement and horizontal displacement data of monitoring points in a construction monitoring area, and comprises GNSS receivers arranged at the monitoring points in the construction area; the data acquisition system sends acquired data to the data processing system through the Internet of Things; the data processing system is provided with a three-dimensional model of the terrain around the jacking pipe, corrects the three-dimensional model in real time according to the data acquired by the data acquisition system, obtains a ground surface settlement change three-dimensional motion cloud picture, and uploads the three-dimensional motion cloud picture to the cloud server in real time; and the remote management terminal communicates with the cloud server, downloads the three-dimensional motion cloud picture, and realizes remote on-site construction monitoring and management. According to the invention, the field work intensity can be greatly reduced, 24-hour unattended monitoring is realized, and the construction safety and efficiency are improved.
Owner:CHINA RAILWAY BEIJING ENG GRP CO LTD +1

Shield construction disturbance detection equipment

PendingCN119102770Aavoid construction accidentsdrawn preciselyMining devicesTunnelsControl theoryDistance measuring equipment
The invention discloses disturbance detection equipment for shield construction. The disturbance detection equipment comprises a mounting frame, a plurality of disturbance detection points arranged in an array and a point location early warning mechanism, the disturbance detection point comprises a base, a settlement rod, a displacement sensor, a first distance measuring head and a second distance measuring head, whether the settlement rod generates settlement displacement or not is detected through the displacement sensor, and the height change of the settlement rod is detected through the first distance measuring head; the point location early warning mechanism comprises range finders, an axis net module and an early warning module, position signals of the second range finding heads of the disturbance detection points are obtained through the range finders respectively, the position signals are fed back to the axis net module to obtain coordinate information of the disturbance point locations, an axis net diagram is generated according to the coordinate information and compared with an original axis net diagram, and when the change exceeds a threshold value, the early warning module is started. And an early warning alarm is sent to the background terminal through the early warning module. The ground surface change caused by shield disturbance is fed back in time, the accurate position of the ground surface change is obtained, the ground surface change is fed back to shield construction at any time for adjustment, and construction accidents are prevented.
Owner:CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2

Overhead transmission line pay-off control method and system based on multi-source parameter perception

The invention discloses an overhead transmission line pay-off control method and system based on multi-source parameter perception, and the system comprises a sensing subsystem which collects the load and posture of a pay-off pulley, the posture and geographic positioning of a walking board, and the sag of a pay-off segment observation gear lead, and employs the collected data as the parameter induction quantity of a field pay-off process; the network subsystem is used for integrating the parameter induction quantity acquired by the sensing subsystem through a wireless ad hoc network to obtain a multi-device parameter value and transmitting the multi-device parameter value to the execution subsystem; and the execution subsystem is used for judging the obtained multi-device parameter values, and realizing the automatic unwinding of the overhead transmission line conductor based on multi-source parameter perception through automatic output adjustment of the stretching device.
Owner:STEJT GRID ELEKTRIK PAUER INZHINIRING RISERCH INSTITYUT KO LTD +3

Intelligent guiding device for pile planting machine

ActiveCN121110657Bprevent rotationAdjust the pitch angle in real timeUniversal jointMachine
The application discloses a pile driver intelligent guiding device arranged on the surface of a machine body and comprising a vertical guiding mechanism, the vertical guiding mechanism comprising a frame rod fixedly connected with the machine body, a fixed plate fixedly installed at the end of the frame rod, and a universal joint arranged on the top surface of the fixed plate. The pile driver intelligent guiding device is connected with the fixed plate through the universal joint, and a sliding cylinder-screw rod driving structure is combined to adjust the pitch angle of a laser instrument in real time. When the sliding cylinder slides along the fixed cylinder, the fixed plate is pushed to rotate around the universal joint as the fulcrum, so that the laser line emitted by the laser instrument is always perpendicular to the ground, the high-precision guiding requirement of the vertical implantation of a steel sheet pile is met, the inner wall of the sliding cylinder is provided with an embedded nut and is threadedly connected with a screw rod, the end of the screw rod is limited from being separated from the sliding cylinder through a stop ring, the threaded connection is prevented from being invalid due to vibration or impact, the surface groove of the sliding cylinder is matched with the inner wall protrusion of the fixed cylinder to prevent the rotation of the sliding cylinder and ensure that the sliding direction is always along the axial direction, and the structural reliability is improved.
Owner:CCCC SHANGHAI DREDGING CO LTD

Transportation device of power transmission line matched cableway system

The invention relates to the technical field of transmission line construction transportation, in particular to a transportation device for a transmission line matched cableway system. The automatic loading and unloading vehicle comprises a vehicle body device, a wheel train device and a rail device, the wheel train device is installed on the vehicle body device, a loading and unloading device is further installed on the vehicle body device and controls the vehicle body device to automatically load and unload goods, and the wheel train device comprises main wheels and supporting wheels. The vehicle body device is used for storing materials, construction garbage and the like, the wheel train device is used for driving the vehicle body device to move to transport the materials and the construction garbage, the rail device facilitates relying transportation of the vehicle body device and the wheel train device, and transportation is conducted through a planned route. Materials and construction waste in the vehicle body device can be conveniently and automatically dumped out through the loading and unloading device, the unloading time is shortened, the conveying continuity and the construction efficiency are improved, the main wheels are used for running on the ground, the supporting wheels are used for running on the rail device, different conveying scenes can be conveniently switched, and the application range is widened.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO CONSTR CO +1

Sling cart for building construction

The utility model discloses a sling cart for building construction, relates to the technical field of sling carts, and adopts the technical scheme that the sling cart comprises a sling cart handle, the sling cart handle comprises a cart body and a mechanical arm, the mechanical arm is rotatably connected to the cart body, a rope is arranged on the mechanical arm, the lower end of the rope is fixedly connected with a connecting block, and the lower end of the connecting block is fixedly connected with the sling cart handle. The lower surface of the connecting block is fixedly connected with a hook; the protection mechanism comprises a fixed frame and a movable frame, the fixed frame is fixedly connected to the mechanical arm, the movable frame is located on one side of the fixed frame, the movable frame is slidably connected to the mechanical arm, a telescopic rod is rotatably connected to the side wall of the movable frame, one end of the telescopic rod is rotatably connected to the connecting block, and the other end of the telescopic rod is rotatably connected to the connecting block. The mechanical arm has the beneficial effects that the shaking amplitude of an object on the hook can be effectively reduced in the process that the mechanical arm lifts the object, the situation that the object on the hook falls off from the hook due to the too large shaking amplitude and hurts a worker is avoided, and building accidents are avoided.
Owner:CHINA YOUTH AVIATION INVESTMENT TECHNOLOGY (JIANGSU) CO LTD

A device for cleaning sediment from embedded rock piles

ActiveCN115852964BContinuous position adjustmentGuaranteed reliabilityBulkheads/piles
This invention relates to the field of pile foundation sediment cleaning devices, and discloses a sediment cleaning device for embedded rock piles, comprising: a first support frame; a vertical through hole provided on the horizontal plate of the first support frame, through which a first guide tube passes; a second guide tube fixed to the upper side wall of the first guide tube and sealed with a transverse sealing plate, the top side wall of the first guide tube also being provided with a slurry return pipe; a third guide tube located above an adjusting plate, the second guide tube vertically passing through the transverse sealing plate and rotatably extending into the interior of the first guide tube; a fourth support frame fixed to the upper surface of the adjusting plate; and an adjusting component for rotating the first guide tube. The device of this invention rotates the second guide tube through the adjusting component, and in conjunction with the threaded section outside the second guide tube and the first support frame, enables continuous position adjustment of the air-lift reverse circulation device relative to the embedded rock pile hole, ensuring the reliability of the air-lift reverse circulation device in cleaning sediment.
Owner:SINOHYDRO BUREAU 5

A kind of building construction assembled I-beam hoisting equipment and use method thereof

The present invention belongs to the technical field of cranes supported by buildings, and in particular to an assembled I-beam lifting device for building construction and a method for using the same. In view of the difficulties in placing the I-beam on a support plate with the existing lifting equipment, the manual operation steps are extremely numerous, which seriously affects the lifting efficiency of the I-beam, and the problem of large errors when the tower crane lifts the I-beam to a specified position, the following scheme is proposed, which includes a lifting plate and an I-beam, and the I-beam is located below the lifting plate; and also includes a top plate, and the top plate is located above the lifting plate, and is used to lift the lifting plate and the I-beam to the building, and a plurality of sliding bars are welded to the top of the lifting plate. In the present invention, the T-shaped casting and the U-shaped clip can be driven to move toward the middle by the rise of the top plate, and the L-shaped clip plate can be limited when the T-shaped casting moves, so that no manual operation is required. The rise of the top plate can automatically clamp and fix the two sides and both ends of the I-beam, and the operation is simple.
Owner:HEBEI ORGU CONSTR ENG CO LTD

Method and system for supervising pole and tower assembling process based on machine vision

The invention discloses a machine vision-based pole and tower assembly process supervision method and system, and relates to the technical field of pole and tower monitoring, and the system comprises a historical grabbing position obtaining module, a reference grabbing position range obtaining module, a robot dog platform, an image obtaining and processing module, an image acquisition and recognition module and an analysis and alarm module. The violation signal indicates that when the mechanical gripper grabs the construction assembly, serious deviation of the spatial position and the attitude angle occurs at the same time, operation needs to be stopped immediately, comprehensive inspection and correction need to be conducted, errors of the mechanical gripper in the pole and tower assembling process can be found and corrected in time, the construction accuracy, safety and quality are guaranteed, and the construction efficiency is improved. Construction accidents caused by improper postures can be prevented, for example, components fall off due to wrong postures of grippers, and on-site personnel and equipment can be possibly damaged.
Owner:STATE GRID ANHUI ELECTRIC POWER CO LTD +1

Plastering device for building wall

The utility model provides a plastering device for a building wall. The plastering device comprises a trolley, a lifting device which horizontally moves is arranged on the trolley, a support is arranged on the lifting device, a liftable plastering device is arranged on the support, a material collecting disc is arranged at the bottom of the plastering device, and the material collecting disc rotates relative to the plastering device. And after plastering of the wall face in the vertical direction is completed, the trolley is moved, and the whole wall face is covered with the whole device. The whole device is simple in structure, easy and fast to operate and high in automation degree, and the whole device can avoid the phenomenon that time and labor are wasted manually. And the phenomenon of physical fatigue caused by long-time standing, stooping and hand raising gesture operation of the worker is avoided. By reducing the steps of manpower and erecting a scaffold, the construction cost can be greatly reduced, the step of erecting the scaffold is omitted, the construction steps can be optimized, and the construction period is shortened. The whole device can avoid the risk that a worker falls from a high place, construction accidents are avoided, and the device has high popularization value.
Owner:HUBEI JIUDINGFENG CONSTR CO LTD

Underground diaphragm wall structure

The utility model relates to and discloses an underground diaphragm wall structure. Relates to the technical field of building construction. The structure specifically comprises a wall pit transversely dug underground, reinforcement cages arranged in the wall pit, a concrete layer poured in the wall pit and a penetrating area allowing a shield tunneling machine to longitudinally penetrate through the wall pit, and the concrete layer is filled between the reinforcement cages and the outer sides of the reinforcement cages; the reinforcement cage comprises a reinforcement frame, a glass fiber rib frame and a connecting piece for connecting the reinforcement frame and the glass fiber rib frame. The steel reinforcement cage comprises the steel reinforcement frame and the glass fiber rib frame which are separated from each other, and the position of the penetrating area reserved on the wall body is partially or completely overlapped with the position of the glass fiber rib frame, so that the glass fiber rib frame is cut in the process of cutting the wall body at the position of the penetrating area by a shield machine; therefore, the shield machine can quickly penetrate through the underground diaphragm wall, construction efficiency is improved, construction accidents can be prevented, damage to a cutter of the shield machine can be reduced, and construction cost is reduced.
Owner:NINGBO CONSTR GRP

Automatic laying system and laying method for pipeline ultraviolet curing repair lining hose

The invention discloses an automatic laying system and laying method for a pipeline ultraviolet curing repair lining hose, and the automatic laying system comprises an automatic folding conveying device, a traction unit, a resistance reduction unit and a control unit. The automatic folding and conveying equipment comprises a support, a first horizontal conveying belt and a second horizontal conveying belt, the first horizontal conveying belt and the second horizontal conveying belt are arranged on the support front and back in the longitudinal direction, an elastic pressing roller is arranged above the first horizontal conveying belt, and a folding plate is arranged above the second horizontal conveying belt and in the transverse middle. The lining hose is automatically folded and conveyed through automatic equipment, and the traditional manual folding and conveying operation process is replaced; meanwhile, the tension meter and the tachometer are used for monitoring the tension and the installation speed of the lining hose in real time, it is guaranteed that the lining hose is installed within the normal parameter range, damage to the lining hose is avoided, the installation construction efficiency of the lining hose is improved, and the construction quality is guaranteed.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD

Perforating device for house building construction

The utility model discloses a punching device for house building construction. The punching device comprises a power assembly, a positioning assembly, a fixing assembly and a drill rod. The fixed end of the drill rod is detachably connected with the fixing assembly, the fixing assembly is used for clamping and fixing the fixed end of the drill rod, and the fixing assembly is further fixed to the power output end of the power assembly so as to drive the drill rod to rotate. The power assembly is detachably arranged on the positioning assembly, the positioning assembly is used for abutting against a to-be-punched face to be punched for positioning, and meanwhile the positioning assembly is further used for guiding and limiting the power assembly in the punching pushing direction so that the drill rod can vertically drill the to-be-punched face. According to the device, it can be ensured that the drill rod is always kept in the state of being perpendicular to the face to be punched in the punching process, the problem that punching is inaccurate due to the fact that the drill rod deviates or inclines in the drilling and beating process is solved, meanwhile, the drill rod is detachably connected with the fixing assembly so that the drill rod can be rapidly disassembled and replaced, then the downtime is shortened, and the production efficiency is improved. And the overall construction efficiency and the construction flexibility are improved.
Owner:HUNAN THIRD ENG CO LTD

Vertical transportation equipment for super high-rise building construction

The invention relates to the technical field of vertical transportation equipment, and discloses vertical transportation equipment for super high-rise building construction, which comprises an outer cylinder, the top end of the outer cylinder is of an opening structure, a baffle ring is integrally formed on the inner wall of the bottom end of the outer cylinder, an end cover is fixedly mounted at the top end of the outer cylinder, and a hanging ring is fixedly mounted at the top end of the end cover. A movable pipe capable of moving up and down is installed in the outer cylinder, a pull rod is inserted in the movable pipe, a lifting hook is fixedly installed at the bottom end of the pull rod, and a buffering mechanism is installed between the movable pipe and the interior of the outer cylinder. When a steel cable for hoisting a winch is wound, the hanging ring and the end cover drive the outer barrel to be lifted upwards, so that the outer barrel and the movable pipe generate relative displacement, the compression spring arranged on the outer side of the movable pipe in a sleeving mode is compressed along with rising of the outer barrel, and therefore impact force generated at the moment of hoisting is effectively buffered; in this way, impact of sudden pulling force on vertically-hoisted building construction materials can be avoided, and the building construction materials are prevented from being damaged.
Owner:JIANGSU ZHONGZHUANG CONSTR CO LTD

Large-span bridge steel transportation mechanism and using method

PendingCN119262028AWill not affect mutual frictionimprove securityLifting framesCranesBrakeTruck
The invention provides a large-span bridge steel transportation mechanism and a using method, and belongs to the technical field of bridge steel transportation mechanisms. Comprising a weighing plate trailer assembly, a small magnetic steel hoisting assembly is arranged at the position, close to the top surface, of one end of the weighing plate trailer assembly, folding height assemblies are arranged at the positions, close to the left side edge and the right side edge, of the top surface of the weighing plate trailer assembly correspondingly, and a transportation support assembly is arranged at the tops of the two folding height assemblies. According to the weighing plate trailer assembly, a worker can conveniently push a plate trailer to a designated position through the foot brake pulley, the triangular plate support and the handle and then step on a foot brake of the foot brake pulley to fix the plate trailer, the electronic weighbridge plate is connected with the gravity sensor and the weight alarm, and the gravity of installed steel can be recorded in real time; and when the weight exceeds the weight of the weighing plate trailer assembly, the weight alarm can make a sound to alert workers, so that the safety is improved, and construction accidents caused by overweight are prevented.
Owner:CCCC SECOND HIGHWAY ENG CO LTD

Installation method of oblique shear steel plate in core tube oblique steel plate shear wall

ActiveCN118958700ASolve the problem of large weight and volumeensure safetyBuilding material handlingLoad-engaging elementsButt jointClassical mechanics
The invention discloses a method for installing an inclined shear steel plate in a core tube inclined steel plate shear wall. The method comprises the steps that a top moving device is arranged on a platform beam of an overall climbing steel platform system in a suspended mode, and a bottom moving device is installed on the constructed uppermost steel plate shear wall on a core tube; the upper end and the lower end of a to-be-installed oblique shear steel plate are connected with lifting ropes correspondingly, the oblique posture of the oblique shear steel plate is controlled through the upper lifting ropes and the lower lifting ropes by means of lifting equipment, and the oblique shear steel plate is obliquely put down to shelving platforms of all the bottom translation mechanisms from gaps of the platform beams; the vertical gradient of the inclined shear steel plate is adjusted through the take-up and pay-off of the upper and lower lifting ropes; electrifying each electromagnet, and performing telescopic control through each oil cylinder of each top translation mechanism and each bottom translation mechanism, so that the inclined shear steel plates connected with the electromagnets on the corresponding oil cylinders are translated and butted on the shear steel plates of the constructed steel plate shear wall; and welding the butt joint. Installation of the oblique shear steel plate of the core tube can be achieved.
Owner:SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD

Anti-tilting safety protection device for climbing formwork and construction method of anti-tilting safety protection device

The invention provides a climbing formwork frame anti-inclination safety protection device and a construction method thereof, and belongs to the technical field of building construction.The climbing formwork frame anti-inclination safety protection device comprises a climbing formwork frame, a climbing formwork frame anti-inclination assembly and a wall, the climbing formwork frame anti-inclination assembly is arranged between climbing formworks of the adjacent climbing formwork frame, and the climbing formwork frame anti-inclination assembly comprises four vertical rods, a plurality of transverse rods, an adjusting mechanism and a balancing weight; the four vertical rods serve as four corners, the transverse rods are welded between the adjacent vertical rods, the adjusting mechanisms are arranged on the inner sides of the upper ends of the vertical rods, the balancing weights are arranged on the upper surfaces of the adjusting mechanisms, and the top anti-inclination assembly is arranged at the top of the climbing formwork and comprises a reel, a motor B and a steel wire rope A; the anti-inclination control system is used for monitoring the overturning state of the climbing formwork and controlling the climbing formwork anti-inclination assembly. The problem that potential safety hazards exist in constructors due to the fact that a traditional creeping formwork frame inclines due to external factors during construction or use is solved.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Rotation detection device of overhead working truck

The rotation detection device comprises an equipment plate, one side of the equipment plate is provided with a rack plate, one end of the rack plate is fixedly provided with a buzzer, the upper surface of the equipment plate is provided with two alarms, the two alarms are vertically arranged in a mirror image mode, and the other side of the equipment plate is provided with an attaching groove; a centering detection mechanism is arranged on the equipment plate and the rack plate, a bearing detection mechanism is arranged on the centering detection mechanism, and a moving mechanism is arranged between the equipment plate and the rack plate; according to the device, through cooperation of a first pressing disc and a second pressing disc in the bearing detection mechanism, a switch in the middle of any alarm is pressed, the situation that the rotation bearing capacity of rotation is too large due to the fact that a rotating base above the rotation is inclined is avoided, constructors are warned to stop high-altitude work in time, construction accidents are avoided, and the construction efficiency is improved. And meanwhile, damage caused by long-time overweight bearing during rotation is avoided, and potential safety hazards are reduced.
Owner:ZHEJIANG UNIV OF TECH

An LED display screen with automatic dust removal and decontamination function

The present invention discloses an LED display screen with automatic dust removal and decontamination function, including a display screen body provided with a dust removal and decontamination mechanism; the dust removal and decontamination mechanism includes a control component, a cleaning component and a camera component; the control component is electrically connected to the cleaning component and the camera component respectively, and the control component is also connected to a control computer for communication, and controls the operation of the cleaning component, the camera component and itself through the instructions issued by the control computer; the cleaning component is used to complete the dust removal and decontamination action of the display screen body; the camera component is used to take pictures to check whether the dust removal and decontamination work is completed. The present invention realizes automatic dust removal and decontamination of the LED display screen through the dust removal and decontamination mechanism, avoids the trouble of manual cleaning, saves time and labor, improves cleaning efficiency, and also avoids construction accidents that may occur in manual cleaning. It has a sophisticated design and good user experience, and is worthy of vigorous promotion by the society.
Owner:SHENZHEN HUACAISHENG TECH CO LTD

Self-powered wire unwinding pulley

ActiveCN222348392Uconstant speedconstant positionFilament handlingWire tensionControl engineering
The utility model relates to the technical field of wire unwinding, and discloses a self-powered wire unwinding pulley, which comprises a base, a winding shaft arranged in the base, a driving box arranged on one side of the base, a linkage shaft arranged at the lower end of the outer wall of the driving box, a linkage assembly arranged in the driving box, and a transmission shaft arranged on the lower end of the outer wall of the linkage assembly, the driving box is used for driving the winding shaft to rotate, the adjusting assembly is matched with the linkage shaft to provide power for the winding shaft, the adjusting assembly is arranged at the upper end of the bottom of the base and used for controlling the operation power of the linkage shaft, and the mounting shell is arranged in the center of the outer wall of the driving box. And the condition of over-tightness or over-looseness is avoided.
Owner:ZHONGSHENG HONGCHENG (GROUP) CO LTD

Hollow pile post-grouting device and pile bottom post-grouting method thereof

The invention relates to the technical field of civil engineering, in particular to a hollow pile post-grouting device and a pile bottom post-grouting method thereof. The hollow pile post-grouting device comprises a hollow pile body, a grouting pump, a flow control system, an intelligent pressure detection unit, a grouting nozzle and a guide positioning mechanism. The pile bottom post-grouting method implemented through the hollow pile post-grouting device comprises the following steps that a pile body is installed; the grouting pump and the hollow pile body are connected; detecting and calibrating the system; adjusting a flow regulator; starting a grouting pump; the grouting pressure is monitored in real time; a protection program; the nozzle automatically expands; adjusting the spraying angle; and grouting is completed. By introducing the intelligent control system, the flow regulator, the automatic stop valve, the pressure compensator, the adjustable jet orifice and the electronic positioning system, the problems of complicated operation, non-uniform grouting effect, high safety risk, material waste, inaccurate positioning and the like in the prior art are solved, and the grouting construction efficiency, safety and reliability are improved.
Owner:TANGSHAN KAILUAN CONSTR (GRP) CO LTD

A method for installing oblique shear steel plates in core tube oblique steel plate shear walls

The invention discloses a method for installing an oblique shear steel plate in an oblique steel plate shear wall of a core tube, comprising: suspending a top moving device on a platform beam of an integral climbing steel platform system, installing a bottom moving device on the uppermost steel plate shear wall constructed on the core tube; connecting the upper and lower ends of the oblique shear steel plate to be installed with suspension ropes respectively, using a lifting device to control the inclination of the oblique shear steel plate through upper and lower suspension ropes to tilt it from the gap of the platform beam to the shelf platform of each bottom translation mechanism; adjusting the vertical inclination of the oblique shear steel plate through the retracting and releasing lines of the upper and lower suspension ropes; energizing each electromagnet, and performing telescopic control through each oil cylinder of each top and bottom translation mechanism so that the oblique shear steel plate connected to the electromagnet on the corresponding oil cylinder is translated and docked on the shear steel plate of the constructed steel plate shear wall; and welding the docking seam. The invention can realize the installation of the oblique shear steel plate of the core tube.
Owner:SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD

A method for determining the horizontal misalignment between segment rings during prefabricated caisson construction

ActiveCN117328509BAccurately calculate horizontal misalignmentavoid construction accidentsFoundation testingCaissonsSoil scienceFriction angle
This invention discloses a method for determining the horizontal misalignment between segments during the construction of prefabricated caissons, comprising: obtaining the unit weight γ of each soil layer. i The thickness h of each soil layer i The internal friction angle of soil layer i on the outer sidewall of the caisson and the cohesion c of each soil layer. i ; Calculate the active earth pressure coefficient K of each soil layer based on the internal friction angle of soil layer i on the outer sidewall of the caisson. ai ; Calculate the earth pressure intensity p at the top of the upper segment above the bolt. au1 Earth pressure intensity p at the bottom of the upper segment of the bolt au2 Earth pressure intensity p of the lower segment ad Based on the earth pressure strength p of the upper segment of the bolt. au Earth pressure strength p of the lower segment ad Calculation of the height L of a single segment and the force V exerted by the bolts on the upper segment. au The force V acting on the lower segment by the bolts ad According to the force V exerted by the bolt on the upper segment au The force V acting on the lower segment by the bolts ad Calculate the uniformly distributed load q on the bolt; calculate the horizontal misalignment w between the segment rings based on the uniformly distributed load q on the bolt. This enables accurate measurement of the horizontal misalignment between the segment rings.
Owner:CHINA RAILWAY CONSTR SOUTH CHINA CONSTR CO LTD

A method and device for determining the load of new structures in mining-affected areas

ActiveCN115081081BFully tap the value of land and buildingsIncrease the value of land resourcesGeometric CADDesign optimisation/simulationMining engineeringStructural engineering
The present invention discloses a method and device for determining the load of a newly built structure in a mining-affected area, the method comprising: calculating the duration T of surface movement, determining a stable settlement area and an unstable settlement area according to the mined and planned mining working faces; the unstable settlement area is an area not suitable for construction, and the surface ultimate residual deformation is calculated in the stable settlement area; determining the type of the proposed structure according to the surface ultimate residual deformation; calculating the height of the water-conducting fracture zone and the load influence depth of the type of the proposed building, and then judging whether the load influence depth and the water-conducting fracture zone are connected in combination with the height from the mining working face to the surface; if not, the type of the proposed building is feasible, otherwise the type of the proposed building is downgraded; repeating the above steps to obtain the type of the proposed building, and then determining its reasonable load; the advantages of the present invention are: being able to obtain the type of the proposed building in the mining-affected area and determine its reasonable load, providing a practical and reliable scientific basis for the refined construction of coal mining subsidence areas.
Owner:PINGAN COAL MINING ENG RES INST CO LTD +1