Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

61results about How to "Avoid construction accidents" patented technology

Building curtain wall installation device

The invention discloses a building curtain wall installation device. The building curtain wall installation device comprises a building main body and a bolt, an upper side of the building main body isprovided with a pedestal, and a lifting machine main body is fixed on the pedestal; the bolt passes through an auxiliary fixing piece to be in threaded connection with the lifting machine main body,the lower sides of the pedestal and a base plate both are provided with lifting grooves, and a first electric telescopic rod is arranged in each limiting groove, meanwhile, a self-locking idler wheelis fixed at the lower side of the first electric telescopic rod, a winding machine is fixed at the upper side of the lifting machine main body, a second bearing steel wire is fixed at the lower side of a first support plate, a storage lifting basket is arranged at the upper side of the bottom plate, a sliding chute is formed on a first fixed plate, a second support plate is fixed at a hydraulic cylinder through an upper side piston rod, and a driving motor output end is rotationally connected with a clamping mechanism. The building curtain wall installation device is provided with the clampingmechanism and a sucking disk, with the sucking disk, a building curtain wall can be fixed through suction, and with the clamping mechanism, auxiliary fixing is executed after fixing through suction.
Owner:高飞

Electric shock prevention on-site intelligent supervision complete equipment for electric power operators

The invention discloses electric shock prevention on-site intelligent supervision complete equipment for electric power operators, and belongs to the technical field of electric power informatization.The equipment comprises portable electronic supervision equipment and a system automatic identification device. According to the portable electronic supervision equipment, a polygon which is definedwith a safety facility identified by the intelligent supervision complete equipment adopted as a vertex is used as an operation site electronic fence. According to the system automatic identificationdevice, behavior judgment is performed by utilizing a linkage tracking technology and a moving object detection technology, a sound-light alarm device is used for timely warning and prompting on-sitesupervisors in real time, and the on-site supervisors persuade people who want to enter a construction site to leave. According to the electric shock prevention on-site intelligent supervision complete equipment for electric power operators of the invention, identity recognition and moving direction tracking prediction of the people in a monitoring area are realized by utilizing the electronic fence technology, the moving object detection technology and the target tracking technology, non-operating personnel are warned in time through a built-in multi-section audible and visual alarm, and meanwhile, the on-site supervisors are prompted in real time.
Owner:YUNNAN POWER GRID

Remote control based pipeline dredging equipment for water conservancy project

The invention discloses remote control based pipeline dredging equipment for a water conservancy project, and relates to the field of water conservancy projects. By aiming at the problems that an existing pipeline dredging device for a water conservancy project is low in dredging efficiency, generally, dredging is achieved manually, and construction risks exist, the following scheme is provided, wherein the equipment comprises a mounting box, a storage battery and a driving motor are fixedly mounted at the top end of the mounting box, a main gear disc is fixedly connected to the side, away from the storage battery, of an output shaft of the driving motor, a mounting plate is fixedly connected to one side of the mounting box, a mounting groove is formed in the mounting plate, an air cylinder is fixedly mounted in the mounting groove, the end of a piston rod of the air cylinder is fixedly connected with a push rod, and the end of the push rod extends into the mounting box and is fixedly connected with a push plate. According to the equipment, the dredging efficiency of a water conservancy project pipeline can be effectively improved, meanwhile, manpower can be replaced to conduct pipeline dredging operation, the risk of pipeline dredging is reduced, and the equipment is suitable for application and popularization.
Owner:YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION +1

Braking performance early-warning system for hydraulic crane hoisting mechanism

The invention discloses a braking performance early-warning system for a hydraulic crane hoisting mechanism. The early-warning system comprises a signal detection device and a warning circuit, and the signal detection device is electrically connected with the warning circuit; the signal detection device comprises multiple detection columns which are installed on one outer end face of a first hoisting machine winding drum, and a proximity switch matched with the corresponding detection column is installed on a winding drum bracket at the outer side of the detection column; and the warning circuit comprises a warning buzzer which is connected with the proximity switches in series, a lifting pressure relay and a falling pressure relay are connected between the proximity switches and a power supply in series, the lifting pressure relay is connected with a lifting control oil circuit of a hoisting machine control oil circuit, and the falling pressure relay is connected with a falling control oil circuit of the hoisting machine control oil circuit. When a braking system is subjected to abnormities, the winding drum rotates, after the detection columns reach the sensing distance to the proximity switches, the proximity switches enable the warning buzzer to be connected with the power supply, and warning is conducted; and an operator can perform maintenance on a crane in time according to warning information, and construction accidents are avoided.
Owner:SHANDONG ELECTRIC POWER CONSTR NO 2

Hoisting equipment used for steel box girder in complex environment

The invention discloses hoisting equipment used for a steel box girder in a complex environment. The hoisting equipment comprises a lower girder body, an upper girder body, a rotating shaft and threetelescopic rods, wherein the lower girder body is provided with four hoisting points; the upper girder body is located above the lower girder body and provided with four connecting columns, the lowerend of any connecting column penetrates through the lower girder body and is provided with a distributive girder mechanism, and the bottom of each distributive girder mechanism is connected with the steel box girder to be hoisted; the rotating shaft is located between the upper girder body and the lower girder body and rotatably connects the middle of the upper girder body and the middle of the lower girder body together; and the three telescopic rods are located between the upper girder body and the lower girder body, and the two ends of any telescopic rod are connected with the upper girderbody and the lower girder body respectively. Transition parts of the upper girder body and the lower girder body are arranged between a steel wire rope connected with a crane and the steel box girderto be hoisted, the shaking amplitude of the steel box girder caused by other external forces (such as wind force) in the complex environment is greatly reduced, the probability of construction accidents caused by shaking of the steel box girder in the hoisting process is greatly reduced, and the safety of construction is improved.
Owner:CCCC THIRD HIGHWAY ENG

Bridge-dismounting construction method for prestressed concrete continuous beam

The invention relates to the technical field of bridge construction, in particular to a bridge-dismounting construction method for a prestressed concrete continuous beam which is used for dismountinga flange plate of a prestressed concrete continuous beam. The method comprises the following steps of erecting a temporary supporting system used for temporarily supporting a No. 0 block and a side span cast-in-place section of a prestressed concrete continuous beam and temporarily consolidating a pier beam; cutting and removing a closure section; erecting a hanging basket on rest beam body of theprestressed concrete continuous beam, cutting and dismounting the rest beam bodyof the prestressed concrete continuous beam block by block in the reverse construction sequence direction of the hanging basket and hositing cut beam body sections to a barge below through the hanging basket and transporting the sections through a barge; removing the hanging basket after the operation is finished, andcutting and removing the No. 0 block; cutting and removing a side hole cast-in-place section; and cutting and dismantling the lower structure of the prestressed concrete continuous beam. The method has the advantages that the influence on navigation channel navigation is relatively small, the pollution to water is small, and demolition project construction progress is greatly improved.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Building board surface flatness detection device

The invention discloses a building board surface flatness detection device, which comprises a detection machine body, wherein a turn-over cavity is formed in the detection machine body, a feeding cavity with a leftward opening is formed in the left side of the turn-over cavity in a communicating mode, the feeding cavity is inclined from the upper left portion to the lower right portion, a discharging cavity with a rightward opening is formed in the right side of the turn-over cavity in a communicating mode, turn-over rotating shafts which are symmetrical left and right are rotatably connectedbetween the front wall and the rear wall of the turn-over cavity, the outer circular surface of the turn-over rotating shaft on the left side is fixedly sleeved with a first bearing plate, and the turn-over rotating shaft on the left side is located on the right side in the first bearing plate. The building board surface flatness detection device adopts a mode of turning over the building board and detecting the same simultaneously, the building board is placed on the upper end face of the first bearing plate firstly, then the building board is turned over to the upper end face of the second bearing plate through using a connecting rod, the lower end face of the second bearing plate faces upwards, flatness of the upper end face and the lower end face of the second bearing plate is detectedconveniently, and meanwhile the building board surface flatness detection device can assist the building board when the building board is turned over to prevent construction accidents.
Owner:武汉康圣金水晶工艺品有限公司

Monitoring device and method for construction beforehand quality control in engineering supervision

The invention discloses a supervision device and method for construction beforehand quality control in engineering supervision, relates to the technical field of engineering supervision, and solves the problems that in the prior art, only a monitoring effect can be achieved, the construction quality cannot be controlled before construction, the monitoring range is limited, and field monitoring with multiple functions cannot be achieved. The device comprises a movable base, a mounting fixing plate and a working box. According to the supervision device and method for construction beforehand quality control in engineering supervision, the driving motor is used for driving the rotating tripod to rotate, so that the movable pull rod pushes the limiting sliding block to move on the limiting sliding rail, the position change of the material camera is controlled, meanwhile, the steering motor is used for achieving the shooting angle change of the material camera, and the construction beforehand quality control is achieved. Materials used for construction are shot at multiple angles from different angles, unqualified materials are found in time during unloading, and unqualified products are removed before construction.
Owner:李海涛

Construction method for overlength jet grouting stiffness core combined pile

ActiveCN104895066AOvercome the shortcomings of weak connection strengthImprove connection strengthBulkheads/pilesHorizontal distributionEngineering
The invention discloses a construction method for an overlength jet grouting stiffness core combined pile. The construction method includes following steps: (1) determining the vertical and horizontal distribution conditions of high-pressure-bearing water sections and non-high-pressure-bearing water sections according to the geological condition, and determining the quantity and the diameter of jet grouting pile expansion sections in pile bodies of overlength jet grouting piles; (2) performing construction of a plurality of groups of overlength jet grouting piles by employing high-pressure jet grouting drills, and setting the spacing between the plurality of overlength jet grouting piles according to the diameter of the jet grouting pile expansion sections; (3) manufacturing components of pile connectors, assembling and connecting wing plates of I-steels of various unit lengths by employing wing plate connection bolts and wing plate connection boards in the transverse direction, and forming section steel piles in unit lengths; (4) inserting the section steel piles, assembling the section steel piles of various unit lengths via web connection bolts and web connection boards according to the design length of the section steel piles, and accomplishing the construction work of the overlength jet grouting stiffness core combined pile via assembling and inserting; and (5) accomplishing the construction of the jet grouting pile expansion sections and the overlength jet grouting piles.
Owner:JIANGSU HUAJIANG CONSTR GROUP

Building body structure for realizing composite signal sensing layout and construction method thereof

The invention discloses a building body structure for realizing composite signal sensing layout and a construction method thereof, and belongs to the technical field of building body structures. The building body structure for realizing composite signal sensing layout comprises a building body; a base layer is arranged at the lower end of the building body; and an observation assembly is pre-buried below the base layer. According to the building body structure for realizing composite signal sensing layout and the construction method thereof, the settlement degrees in different directions can be observed conveniently, the observation convenience is improved, the signal integrity and accuracy are guaranteed, the stability during construction is guaranteed, the construction safety is also improved, the construction quality is guaranteed, the integration of signal sensing and transmission is achieved, and sensing of various types of composite signals can be supported; and the installation is carried out during construction, so that the tedious construction is avoided, the problems caused by temporary punching installation are avoided, the installation convenience is improved, the construction accidents are avoided, and the construction safety is improved.
Owner:王延芬

Protection device for construction at construction site

The invention provides a protection device for construction at a construction site. The protection device includes two vertical columns. The inner sides of the two vertical columns are respectively provided with a chute in the longitudinal direction, a plurality of sliders are arranged in the chutes, the sides of the sliders on one side are connected to sleeves, sleeve rods are arranged in the sleeves, the ends of the sleeve rods are connected to the sliders on the other side, a plurality of pin holes are formed in the positions, corresponding to the sleeve rods, of the sleeves, positioning pins are arranged in the pin holes, and the bottom of the vertical column on one side is fixed to a base. The protection device also comprises a rotation wheel, a shaft rod is arranged on the rotation wheel, brackets are arranged at the two ends of the shaft rod, and the bottom of the vertical column on the other side is fixed to the brackets. A plurality of slide stop bars are arranged in the chutes. The protection device has the advantages that the structure is simple, the production cost is low, and by adopting a telescopic structure of the sleeve rods and the sleeves, the range of application is wider, the isolation and protection effects are better, construction accidents can be prevented, and the construction safety is improved.
Owner:ZIBO KUAKE MEDICINE TECH

Steel box girder hoisting equipment in complex environment

The invention discloses hoisting equipment for a steel box girder in a complicated environment, which comprises: a lower beam body, on which four hoisting points are arranged; an upper beam body, which is located above the lower beam body; The connecting column, the lower end of any connecting column passes through the lower beam body and the bottom of the distribution beam mechanism is connected to the steel box girder to be hoisted; the rotating shaft is located between the upper beam body and the lower beam body, and connects the upper beam body and the lower beam body The middle part of the beam body is rotationally connected; three telescopic rods are located between the upper beam body and the lower beam body, and the two ends of any telescopic rod are respectively connected with the upper beam body and the lower beam body. In the present invention, a transition piece between the upper beam body and the lower beam body is set between the steel wire rope connected with the hoist and the steel box girder to be hoisted, which greatly reduces the shaking range of the steel box girder caused by other external forces (such as wind force) in complex environments , greatly reducing the probability of construction accidents caused by the shaking of the steel box girder during the hoisting process, and improving the completeness of the construction.
Owner:CCCC THIRD HIGHWAY ENG

Urban rail protection MJS construction method pile intelligent back analysis rapid inversion method and system

The invention provides an urban rail protection MJS construction method pile intelligent back analysis rapid inversion method and system. The method comprises the steps: firstly, establishing back analysis system software with a swarm intelligence optimization algorithm alpha-PSO as the core through finite difference analysis software; then giving a basic parameter value range of back analysis system software according to geological exploration initial parameters; continuously optimizing and updating the monitoring data through a back analysis system, continuously calculating to obtain rock-soil body parameters according to the optimized and updated monitoring data, and continuously iterating the rock-soil body parameters to obtain rock-soil body back analysis parameters; and finally, calculating the deformation displacement of the foundation pit and the urban rail according to the rock-soil body back analysis parameters. The inverse analysis parameters obtained through swarm intelligence optimization algorithm alpha-PSO optimization can reflect complex geological conditions in the rock-soil body better, can participate in finite difference calculation to simulate next excavation of the foundation pit, obtain rock-soil body parameters, predict possible risks and avoid construction accidents.
Owner:CENT & SOUTHERN CHINA MUNICIPAL ENG DESIGN & RES INST

Automatic unhooking and hooking device for hoisting of soil collecting carriage in subway shield tunnel construction

The invention provides an automatic unhooking and hooking device for hoisting of a soil collecting carriage in subway shield tunnel construction. According to the automatic unhooking and hooking device for hoisting of the soil collecting carriage in subway shield tunnel construction, a first lock body is fixed to the lower portion of a hoisting rod, a second lock body is rotationally connected to the first lock body, a bearing space is formed between a driving part and a driven part of the second lock body, and a lock lug enters the bearing space to push the driving part, and the second lock body rotates; and when a second locking hole rotates to the position of a locking rod, the driving part drives a locking device, and the locking device drives the locking rod to enter the second locking hole. According to the automatic unhooking and hooking device for hoisting of the soil collecting carriage in subway shield tunnel construction, the second lock body makes natural contact with the lock lug in the descending process, connection between the lock bodies and the lock lug is completed, manual operation is not needed, connection is firm and reliable, the construction time is saved, procedure connection is smooth and efficient, construction accidents caused by misoperation are avoided, manpower is saved, and the construction cost is reduced.
Owner:DALIAN MARITIME UNIVERSITY +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products