Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41results about How to "Clear technical thinking" patented technology

Zone-dividing saturation simulation method

The invention provides a zone-dividing saturation simulation method. The zone-dividing saturation simulation method comprises the following steps: 1, extracting an oil reservoir segment saturation value according to a single well-logging secondary interpretation result, and only simulating the saturation of an oil reservoir by applying cutoff control; 2, on the basis of oil-water interface analysis, determining the range of an outer oil-water interface sand body, and setting water saturation to be 100 percent; 3, on the basis of determining a transition zone sand body, simulating transition zone saturation by using a J function as an assisting constraint condition; 4, calculating and integrating three simulation results to obtain a zone-dividing fine simulation saturation model. By adopting the zone-dividing saturation simulation method, fine simulation of the saturation is realized, and more accurate parameters are provided for reserve calculation. The zone-dividing saturation simulation method is clear in thought and is easy to apply, the conventional oil-water hybrid simulation method of a saturation model is broken through, and reliable parameters are provided for reserve calculation and numerical reservoir simulation.
Owner:CHINA PETROLEUM & CHEM CORP +1

Quantitative evaluation method of heavy oil steam stimulation water flooded layer

The invention provides a quantitative evaluation method of a heavy oil steam stimulation water flooded layer. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer comprises the following steps: step 1, determining resistivity of mixed formation water of the heavy soil stimulation water flooded layer according to analysis assay data or logging curve data of the formation water of the water flooded layer; step 2, calculating oil reservoir water saturation Sw according to rock resistivity of a coring well by using an archies formula on the basis of determining the resistivity of the mixed formation water of the heavy oil stimulation water flooded layer; step 3, calculating oil displacement efficiency eta of the water flooded layer according to the calculated oil reservoir water saturation Sw and oil-water relative permeability test data of the coring well; step 4, establishing a heavy oil stimulation water flooding degree judgment standard to realize quantitative judgment and recognition of the water flooding degree of the heavy oil stimulation. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer has better operability, contributes to generalization, and provides a practical and feasible method for fine description of the heavy oil reservoir stimulation water flooded layer.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control

The invention provides a method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control. The method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control includes the steps that 1, zone structural geology features and well pattern evolution features are analyzed and researched; 2, reasonable zoning research is carried out through complex remaining oil features and influence factors, typical fault block oil reservoir plane water flooding effect difference and influence factors are analyzed, and an ultra-high water cut stage fault block oil reservoir zoning scheme is formulated comprehensively; 3, a numerical simulation means or oil reservoir engineering method is adopted, development contradictions of all zones are determined, zoning regulation and control technological policy optimization is carried out, and zoning injection and production regulation and control scheme is executed to optimize the design. The method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control is clear in technical idea and simple in application, and a feasible method is provided for effective potential digging of ultra-high water cut stage complex fault block remaining oil in the later stage of production.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for determining productivity of new wells in old area of offshore oilfield based on multiple factors

The invention provides a method for determining the productivity of new wells in an old area of an offshore oilfield based on multiple factors. The method includes the steps that the new well production effective thickness is designed; according to the residual oil saturation and the water content in production of corresponding layers of adjacent old wells in combination with the relation between the water content in the initial stage of production of new wells of an adjusted block and the water content of the surrounding old wells with similar oil reservoir conditions, the water content in the initial stage of production of the new wells of the block is determined; according to oil reservoir oil-water phase permeability data, the changing curve of the non-dimensional oil production index along with the water content is calculated, and the oil production index under the water content is calculated; the initial-stage production pressure difference of the new wells is determined; the theoretical daily oil productivity of the new wells is calculated; the relation between the actual yield and the theoretical calculated yield is summarized to determine the actual daily oil productivity in production of the new wells of the block. By means of the method for determining the productivity of the new wells in the old area of the offshore oilfield based on multiple factors, the purpose of improving the accuracy of prediction of the productivity of the new wells in the old area of the offshore oilfield is achieved, and meanwhile a basis is provided for offshore productivity planning and smooth new well drilling.
Owner:CHINA PETROLEUM & CHEM CORP +1

Complex fault block oil reservoir vertical well deviated space homing prediction method

ActiveCN105608500ASmall scientific research produces research impactGood effectForecastingFine structureGeomorphology
The invention provides a complex fault block oil reservoir vertical well deviated space homing prediction method comprising the following steps: S1, through fine stratigraphic correlation, reasonably dividing and comparing oil-containing small layers, and reasonably judging the oil-water relationship; S2, performing fine structure interpretation, compiling a top structure map and a fracture system development map, and judging whether there is well deviation in a place with abnormal fault form and structure trend; S3, compiling geological research maps based on the stratigraphic correlation result data and the seismic interpretation result; and S4, putting forward a reasonable vertical well deviated space homing prediction method according to a found drilled vertical well deviation problem. The complex fault block oil reservoir vertical well deviated space homing prediction method is clear in technical idea and simple in application, provides more detailed drilling data for 3D geological modeling, and lays a solid geological foundation for the development of later residual oil distribution research.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for conducting reservoir property simulation through multi-direction variation function analysis

The invention provides a method for conducting reservoir property simulation through multi-direction variation function analysis. The method includes the steps that (1), sedimentary microfacies division is conducted according to the regional sedimentary feature; (2), partition is conducted in combination with the reservoir development direction on the basis of the sedimentary microfacies division; (3), variation functions with different phase bands are analyzed respectively for each partition; (4), simulation is conducted on property parameters, such as reservoir porosity and permeability on the basis of the accurate variation function adopting the mode of area dividing and phase belt dividing, and a property parameter model of a reservoir is obtained. By means of the method for conducting reservoir property simulation through multi-direction variation function analysis, the problems that in the process of reservoir property simulation, the meandering river sedimentary sand body is varied and the variation functions are simplex are solved, and a feasible method is provided for fluvial facies reservoir modeling.
Owner:CHINA PETROLEUM & CHEM CORP +1

Full-scale optical fiber monitoring technology for multilayer medium of road structure

The invention provides a full-scale optical fiber monitoring technology for a multilayer medium of a road structure and belongs to the technical field of intelligent structure health monitoring. The full-scale optical fiber monitoring technology is characterized in that a distributed optical fiber etched with fiber grating locally is arranged along the multilayer medium of a road structure in a full scale way at a radian with a bent radius not less than 2cm and is used as a sensing element for monitoring the multilayer medium of the road structure with local high precision and full-scale higher precision. The full-scale optical fiber monitoring technology has the advantages that the effects of local high-precision test and full-scale higher precision test can be achieved and the real-time monitoring and long-term health monitoring for the road structure can be realized. Besides, the monitoring technology has distinct thought, the method is feasible, and an integrated system is low in cost; and the monitoring technology is easily applied to the field of health monitoring for the road structure so that the road structure can be used more reasonably and efficiently.
Owner:DALIAN UNIV OF TECH

Irregular oil-water interface modeling implementation method

The invention provides an irregular oil-water interface modeling implementation method. The method comprises the following steps: preliminarily simulating the space distribution of an oil-water interface of an oil-containing area; determining the fluctuation range of the oil-water interface according to the deepest and shallowest oil-water interface depths meeting during single-well drilling, and constraining the result of the last step by taking the oil-water interface fluctuation range as constrained control; determining a water-top interface of a pure water area according to the top surface structure of water sand; merging the oil-water interface of the oil-containing area and the interface of the pure water area to finally obtain an irregular oil-water interface of the whole area. According to the irregular oil-water interface modeling implementation method, the maximum coincidence between the oil-water interface of a well point and actual drilling is realized, the phenomenon that water exists in oil and oil exists in water appears on a single well when a unified oil-water interface is adopted is avoided; in addition, the irregular oil-water interface modeling implementation method is clear in technical concept and simple to operate, breaks through a method of a previous single oil-water interface and solves the problem that the irregular oil-water interface is not easily realized in a model.
Owner:CHINA PETROLEUM & CHEM CORP +1

New method for dividing water injection layer sections of offshore water injection well

The invention provides a new method for dividing water injection layer sections of an offshore water injection well. The new method for dividing the water injection layer sections of the offshore water injection well includes the following steps: a step 1, comprehensively considering the permeability gradational difference, the thickness gradational difference, the number of small layers in each layer, the water logging degree of each layer and the pressure difference so as to determine a water injection well layered injection boundary standard through a numerical simulation method; a step 2, counting the number of layers, the sand thickness, the permeability, the water logging degree and pressure distribution of an injection opened layer position of an existing layer section of the water injection well, and calculating the thickness gradational difference and the permeability gradational difference of each water injection layer section; a step 3, performing layer section primary division on the water injection well according to the layered injection boundary standard; and a step 4, considering the water injection process, performing suitable adjustment, and acquiring a final division result. The new method for dividing the water injection layer sections of the offshore water injection well is clear in thinking , is simple to apply, is feasible in offshore and similar oil reservoir water injection well layer section division.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for correcting oil saturation based on liquid drainage phenomenon through oil-liquid ratio of rock core sidewall

The invention provides a method for correcting the oil saturation based on a liquid drainage phenomenon through the oil-liquid ratio of a rock core sidewall, and the method comprises the steps: 1, determining a coring well, the data of which needs to be processed according to the production data of an oil field, or confirming that an adjacent well is put into production, wherein there is oil production and liquid production data; 2, carrying out the porosity compression correction of the rock core saturation, and obtaining the rock core oil saturation and water saturation after initial correction; 3, obtaining the proportion of initial discharged liquid crude oil through the solving of the original oil-liquid ratio; 4, obtaining the corrected oil saturation through the rock core oil saturation and water saturation after initial correction at step 2 and the original oil-liquid ratio obtained at a coring moment at step 3. The method provided by the invention is better in operability, isinnovative and practical, is easy for popularization, and provides a new feasible method for the correction of the oil saturation of the rock core.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for quantitatively evaluating offshore oil pool water injection development effect through tracer agent technology

The invention provides a method for quantitatively evaluating an offshore oil pool water injection development effect through the tracer agent technology. The method comprises the steps that different tracer agents are added into different water wells in corresponding research well sets or corresponding research units in an oil pool numerical simulation model; the types of tracer agents produced by adjacent oil wells on the peripheries of all the water wells and the magnitude of the output quantity of the tracer agents are counted; the sources of the oil well tracer agents are determined according to the water injection wells; the communication effect situation of planes among oil-water wells is judged according to the magnitude of the output quantity of the tracer agents of all the oil wells and the types of the tracer agents, and whether equilibrium displacement of the planes is achieved or not is judged; the output types of tracer agents among oil well layers and the magnitude of the output quantity of the tracer agents are counted so that the corresponding displacement situations among longitudinal layers of the oil-water wells can be reflected; and whether equilibrium displacement of oil pool water injection development is achieved or not is evaluated. According to the method for quantitatively evaluating the offshore oil pool water injection development effect through the tracer agent technology, the problems that offshore oil pools are large in investment, difficult to operate and the like are achieved; the spot actual application cost of the tracer agents is greatly reduced; the offshore oil pool water injection development effect is rapidly evaluated; and the purpose of providing a dynamic allocation basis for a mine is achieved.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for correcting core oil saturation by using well logging resultant curve

The invention provides a method for correcting core oil saturation by using a well logging resultant curve. The method comprises the following steps that a So-depth diagram is drawn according to firstmodified core oil saturation data So; according to a fitting formula of the oil saturation of a work area, a well logging resultant curve Sy is obtained, and a new well logging curve Sy' is obtainedthrough equal scaling and translation of the well logging resultant curve Sy; the core oil saturation data So is horizontally projected to the new well logging curve Sy' to obtain new oil saturation data So'; and an average value So'' of the data point So before projection and the data point So' after projection is taken as the final core oil saturation of which the relative size is corrected. According to the method for correcting the core oil saturation by using the well logging resultant curve, underground undisturbed stratum data is adopted to correct core experimental data which is takento the earth surface, so that real situations of an underground undisturbed core and a stratum are realized as faithful as possible, understanding is easy, the method is simple and convenient, and thefeasible method for correcting and improving the relative size of the core oil saturation is provided.
Owner:CHINA PETROLEUM & CHEM CORP +1

Numerical simulation method considering nitrogen injection

The invention provides a numerical simulation method considering nitrogen injection. The numerical simulation method considering nitrogen injection comprises the steps that 1, a three-phase three-component model is established; 2, an underground viscosity-temperature relation and an out-phase equilibrium constant are determined; 3, the relation between heat conductivity coefficients and nitrogen concentrations is determined, and a numerical reservoir simulation model is established; 4, a production history and a calculation result of the numerical simulation model are utilized for fitting; and5, different nitrogen injection volumes are defined, the calculation result is optimized, and a reasonable nitrogen injection volume is determined. The numerical simulation method considering nitrogen injection is clear in technical thinking and easy to apply, has creativity and practicability, is beneficial for popularization and has important guidance significance for guiding field implementation and realizing economical and effective development of a shallow and thin layer.
Owner:CHINA PETROLEUM & CHEM CORP +1

Quantitative evaluation method for heavy oil steam huff and puff in water-flooded formation

The invention provides a quantitative evaluation method of a heavy oil steam stimulation water flooded layer. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer comprises the following steps: step 1, determining resistivity of mixed formation water of the heavy soil stimulation water flooded layer according to analysis assay data or logging curve data of the formation water of the water flooded layer; step 2, calculating oil reservoir water saturation Sw according to rock resistivity of a coring well by using an archies formula on the basis of determining the resistivity of the mixed formation water of the heavy oil stimulation water flooded layer; step 3, calculating oil displacement efficiency eta of the water flooded layer according to the calculated oil reservoir water saturation Sw and oil-water relative permeability test data of the coring well; step 4, establishing a heavy oil stimulation water flooding degree judgment standard to realize quantitative judgment and recognition of the water flooding degree of the heavy oil stimulation. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer has better operability, contributes to generalization, and provides a practical and feasible method for fine description of the heavy oil reservoir stimulation water flooded layer.
Owner:CHINA PETROLEUM & CHEM CORP +1

Passive electric shock bird repellent device

The present invention provides a passive electric shock bird repellent device, and relates to the field of bird and pest control devices. Power is taken from floating potential, when two feet of a bird land on a tower cross arm, the power is discharged to toes of the bird, and the bird gets scared and flies away. According to the technical scheme, the passive electric shock bird repellent device comprises a floating power taking ring, an insulating support, an insulating conductor, a high potential electrode, an insulating interlayer, a cross arm and an insulator string; the insulator string is disposed below the cross arm; the floating power taking ring is fixed at the periphery of the insulator string below the cross arm through the insulating support; the high potential electrode and the insulating interlayer are disposed on an upper surface of the cross arm; the high potential electrode is insulated and isolated from the cross arm by the insulating interlayer; and the floating power taking ring is connected with the high potential electrode through the insulating conductor.
Owner:WUHAN HONGMEN ELECTRICAL TECH CO LTD

Culture medium additive for inducing taxus chinensis cells to produce docetaxel semisynthesis precursor

The invention provides a culture medium additive for inducing taxus chinensis cells to produce a docetaxel semisynthesis precursor. The additive is prepared from thia-diazonium phenylurea, gibberellin, povidone, quercetin, peptone, yeast powder, scutellaria baicalensis, azedarach, hyoscyamus niger, psammosilene tunicoides and the like. In the mode that an elicitor is added into the culture medium, the autophage mode of the taxus chinensis cells is interfered, and therefore the taxus chinensis cells are induced to produce the docetaxel semisynthesis precursor namely 10-deacetylated baccatin III. It is found through experiments that after the additive is added in to cell culture liquid, the secretion amount of 10-deacetylated baccatin III by the taxus chinensis cells is substantially increased, and cell culture density can be increased to a certain degree. The technical thought is clear, the technical scheme is reasonable, and the culture medium additive has good large-scale application prospects.
Owner:天津市博爱生物药业有限公司

Annual load change process analysis method for waterproof curtain wall

The invention discloses an annual load change process analysis method for a waterproof curtain wall. The method comprises the following steps: S1, acquiring the following data by utilizing a two-dimensional full-reservoir water temperature model containing the width average vertical surface of the waterproof curtain wall: the grid area Aj of the jth grid; on the ith day, the pressure difference dpij of the jth grid, wherein i = 1, 2, 3...; j = 1, 2, 3...; s2, calculating the load of each grid every day according to the following formula: fij = Aj * dpij, wherein fij is a load corresponding tothe ith grid and the jth grid; and S3, calculating the day-by-day change process Fi of the total load according to the following formula: Fi:Fi = sigma jfij. Due to the adoption of the technical scheme, compared with the prior art, the influence of a water temperature structure on the load of the waterproof curtain wall is considered, the annual load change process of the waterproof curtain wall can be accurately analyzed, and the difficulty in analyzing the annual load change process of the waterproof curtain wall is solved; therefore, a designer can determine the worst working condition of the load of the waterproof curtain wall, and technical support and data support are provided for structural design of the waterproof curtain wall.
Owner:POWERCHINA ZHONGNAN ENG

Rapid self-operated mixing device and mixing method

The invention discloses a rapid self-operated mixing device and a rapid self-operated mixing method. The rapid self-operated mixing device comprises a first barrel, a second barrel, a third barrel, apartition board, a power transmission mechanism, a power device, a water pressure difference acquisition unit and a controller, wherein the third barrel is coaxially mounted inside the first barrel; the second barrel runs through the first barrel and is connected with the inner cavity of the third barrel; small holes are distributed in the surface of the third barrel; the partition board is connected into the third barrel in a sliding manner; the power transmission mechanism is arranged inside the first barrel and the third barrel; one end of the power transmission mechanism is connected to the partition board, and the other end of the power transmission mechanism runs out of the first barrel and is connected to the power device arranged outside the first barrel; the water pressure difference acquisition unit is used for acquiring a water pressure difference deltaP value between the interiors of the first barrel and the third barrel; a deltaP value signal is transmitted to the controller. Rapid self-operated mixing of a fluid in a water mixing device in a low-flow and low-flow rate state, especially in a laminar flow state is achieved, parameters after mixing can be guaranteed to be quickly detected and fed back, and precise and timely adjustment of a mixing system is facilitated.
Owner:WUHAN TENGYUNSHULENG SCI & TECH LTD

Realization Method of Irregular Oil-Water Interface Modeling

ActiveCN104252551BSolve the problem that the irregular oil-water interface cannot be realizedClear technical thinkingSpecial data processing applications3D modellingWell drillingOil water
The invention provides an irregular oil-water interface modeling implementation method. The method comprises the following steps: preliminarily simulating the space distribution of an oil-water interface of an oil-containing area; determining the fluctuation range of the oil-water interface according to the deepest and shallowest oil-water interface depths meeting during single-well drilling, and constraining the result of the last step by taking the oil-water interface fluctuation range as constrained control; determining a water-top interface of a pure water area according to the top surface structure of water sand; merging the oil-water interface of the oil-containing area and the interface of the pure water area to finally obtain an irregular oil-water interface of the whole area. According to the irregular oil-water interface modeling implementation method, the maximum coincidence between the oil-water interface of a well point and actual drilling is realized, the phenomenon that water exists in oil and oil exists in water appears on a single well when a unified oil-water interface is adopted is avoided; in addition, the irregular oil-water interface modeling implementation method is clear in technical concept and simple to operate, breaks through a method of a previous single oil-water interface and solves the problem that the irregular oil-water interface is not easily realized in a model.
Owner:CHINA PETROLEUM & CHEM CORP +1

A low-cost method for increasing production by reducing crude oil biodegradation and thickening

The invention provides a low-cost production increasing method for weakening biodegradation and thickening of crude oil. The low-cost production increasing method for weakening biodegradation and thickening of the crude oil comprises the steps that 1, for a high temperature oil reservoir which is difficult to produce due to excessive thick oil, water flooding cold production development is suspended; 2, steam is injected into the ground, and steam huff and puff development is tried; 3, if the output is increased after steam huff and puff, steam injection development is continued, and if the output is decreased, cheap sewage flooding development is used; 4, sewage is subjected to still standing to reduce the content of oxygen and particulate matter naturally, and after still standing, ultraviolet lamp irradiation is conducted for the first time, so that degradation of the crude oil through water microorganisms is weakened; and 5, the sewage injection rate is controlled, so that water isheated by the oil reservoir, and natural heat sewage flooding development is realized. The low-cost production increasing method for weakening biodegradation and thickening of the crude oil has goodoperability, innovation and practicability and is beneficial to popularization, and a practicable method for preventing thickening of the crude oil due to strongly water washing in the low cost is provided.
Owner:CHINA PETROLEUM & CHEM CORP +1

Enhanced oil recovery method for fault-block reservoirs in ultra-high water-cut period

The invention provides a method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control. The method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control includes the steps that 1, zone structural geology features and well pattern evolution features are analyzed and researched; 2, reasonable zoning research is carried out through complex remaining oil features and influence factors, typical fault block oil reservoir plane water flooding effect difference and influence factors are analyzed, and an ultra-high water cut stage fault block oil reservoir zoning scheme is formulated comprehensively; 3, a numerical simulation means or oil reservoir engineering method is adopted, development contradictions of all zones are determined, zoning regulation and control technological policy optimization is carried out, and zoning injection and production regulation and control scheme is executed to optimize the design. The method of increasing recovery through ultra-high water cut stage fault block oil reservoir zoning regulation and control is clear in technical idea and simple in application, and a feasible method is provided for effective potential digging of ultra-high water cut stage complex fault block remaining oil in the later stage of production.
Owner:CHINA PETROLEUM & CHEM CORP +1

A Method for Analyzing Reservoir Water Temperature Structure

A method for analyzing the water temperature structure of a reservoir, comprising the following steps: S1. Acquiring the annual daily change data of the top elevation of the water-repellent curtain wall, and converting the annual daily change data of the top elevation of the water-proof curtain wall into the full grid number in the water temperature model Year-by-day change data; S2. Input the year-by-year change data of the grid number into the water temperature model, and conduct daily water temperature structure analysis; S3. The top elevation of the water-proof curtain wall on the current day is inconsistent with the current day-to-day top elevation of the water-proof curtain wall , the analysis is interrupted, and the downstream side grid boundary of the blocking range grid of the water-repelling curtain wall on the next day is changed to the non-water boundary, and the remaining grids are set as the water-passing boundary, and then the analysis is continued. Due to the adoption of the above technical solution, compared with the prior art, the present invention can automatically adjust the top elevation of the water-proof curtain wall when using the water temperature model to analyze the water temperature structure of the reservoir, so that it can rise and fall with the change of the water level, thereby reducing calculation errors .
Owner:POWERCHINA ZHONGNAN ENG

Quantitative evaluation method for inter-well plane connectivity of fluvial facies sand body

The invention provides a fluvial facies sand body inter-well plane connectivity quantitative evaluation method, which comprises the following steps of: 1, identifying and dividing a single river channel sand body, and establishing a well pair sample detailed data table; 2, five key parameters closely related to the connectivity are set, and five key parameters of the well pair are calculated; 3, carrying out data processing and weight calculation on the five key parameters of the well pair; and 4, calculating an inter-well connectivity quantitative evaluation parameter M, and carrying out fluvial facies sand body inter-well plane connectivity quantitative evaluation. Compared with the prior art, the fluvial facies sand body inter-well plane connectivity quantitative evaluation method has better operability, has innovativeness and practicability, is beneficial to popularization, and provides a simple, rapid and feasible method for inter-well plane connectivity quantitative evaluation.
Owner:CHINA PETROLEUM & CHEM CORP +1

Culture medium additive for inducing taxol cells to produce 10-deacetylation baccatin III

The invention provides a culture medium additive for inducing taxol cells to produce 10-deacetylation baccatin III. The additive is prepared from sodium molybdate, colchicine, histidine, apigenin, peptone, yeast powder, fructus forsythiae, abrus cantoniensis hance, hyacinth bean coats, aizoon stonecrop herb and the like. The autophage mode of taxol cells is interfered with through the mode of adding inductors to a culture medium, and therefore taxol cells can be induced to secrete the docetaxel semisynthesis precursor 10-deacetylation baccatin III in a directed mode. It is found through experiments that after the additive is added to cell culture fluid, the 10-deacetylation baccatin III secretion amount of taxol cells is remarkably increased; meanwhile, the cell culture density can be increased to a certain degree. The culture medium additive is clear in thought, the technical scheme is reasonable, and good large-scale application prospects are achieved.
Owner:天津市博爱生物药业有限公司

Viscous damper based on piezoelectric variable friction

PendingCN113431413AAdjust the deformationPlay the role of adjusting frictionProtective buildings/sheltersShock proofingPiezoelectric actuatorsEngineering
The invention provides a viscous damper based on piezoelectric variable friction. The viscous damper comprises a cylinder barrel, a piston is arranged in the cylinder barrel, the piston is connected with a piston rod, a laminated piezoelectric actuator is arranged in the piston, and the laminated piezoelectric actuator is perpendicular to the piston rod but not intersected with the piston rod. According to the viscous damper, the laminated piezoelectric actuator is arranged in the viscous damper, electric energy can be converted into mechanical energy under a direct piezoelectric effect, in other words, electric current is conducted on laminated piezoelectric ceramics, the deformation quantity of the piezoelectric ceramics is changed, stress acting on friction plates is changed, and therefore the force for pushing the piston rod is changed, the energy consumption of the viscous damper is increased, and meanwhile, additional rigidity can be given to a structure, and the structure is assisted in resisting external loads. The technology has the advantages of high flexibility, high stability, high precision, long service cycle and the like, and can be used for solving the problems that the viscous damper at low frequency is low in energy dissipation capacity and cannot provide extra rigidity for the structure.
Owner:WUHAN UNIV OF TECH

Spatial homing method for highly deviated wells

ActiveCN104251135BBreak through the problem of incorrect space homingClear technical thinkingSurveyWell drillingWell logging
The invention provides a highly-deviated well space in-place method. The highly-deviated well space in-place method comprises the steps that whether contradiction exists in an oil, gas and water relation or not is judged; according to a stratigraphic correlation relation, a small-layer top face structural map is made, and whether a structural tendency is reasonable or not is judged; well drilling and well logging hole-deviation correction sand body bushing altitude depths are compared, and whether a difference exists or not is judged; a well required to perform space in-place operation is comprehensively determined, and the depth correction value is determined; the corrected depth is applied to making the small-layer top face structural map, and if the structural tendency is reasonable and no contradiction exists in an oil, gas and water interface, correction is completed. According to the highly-deviated well space in-place method, an effective method which can determine the reasonable space position is provided for a highly-deviated well which affects the development effect and is caused by the position space error caused by well deviation error in the well drilling process. The method has the good operation, creativeness and practicability and facilitates popularization.
Owner:CHINA PETROLEUM & CHEM CORP +1

Spatial Homing Prediction Method of Vertical Well Deviation in Complex Fault Block Reservoir

ActiveCN105608500BSmall scientific research produces research impactGood effectInformaticsInstrumentsGeomorphologyOil water
The invention provides a complex fault block oil reservoir vertical well deviated space homing prediction method comprising the following steps: S1, through fine stratigraphic correlation, reasonably dividing and comparing oil-containing small layers, and reasonably judging the oil-water relationship; S2, performing fine structure interpretation, compiling a top structure map and a fracture system development map, and judging whether there is well deviation in a place with abnormal fault form and structure trend; S3, compiling geological research maps based on the stratigraphic correlation result data and the seismic interpretation result; and S4, putting forward a reasonable vertical well deviated space homing prediction method according to a found drilled vertical well deviation problem. The complex fault block oil reservoir vertical well deviated space homing prediction method is clear in technical idea and simple in application, provides more detailed drilling data for 3D geological modeling, and lays a solid geological foundation for the development of later residual oil distribution research.
Owner:CHINA PETROLEUM & CHEM CORP +1

Shale reservoir horizontal well multi-section fracturing effective fracture half-length calculation method

The invention belongs to the technical field of oil reservoir development, and relates to a shale reservoir horizontal well multi-section fracturing effective fracture half-length calculation method. The method comprises the following steps: step 1, collecting mine field day degree data; 2, the flowing bottomhole pressure of the horizontal well is calculated; step 3, calculating material balance time; 4, drawing a relation curve of the regularized pressure and the material balance time; 5, the comprehensive fracture half length of the horizontal well multi-section fracturing fractures is calculated; step 6, monitoring and calculating productivity contribution rates of different fracturing sections by using a tracer agent; and 7, calculating the effective fracture half length of the horizontal well multi-section fracturing. According to the method, the technical thought is clear, production practice is closely combined, the operation steps are clear and reasonable, the accuracy and precision of the obtained fracture half length of the horizontal well multi-section fracturing are high, quantitative evaluation of the fracture half length of the horizontal well multi-section fracturing is achieved, and the defects in the prior art are overcome.
Owner:CHINA PETROLEUM & CHEM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products