Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

43results about How to "Simple application" patented technology

Mercaptan-alkene light-cured resin for 3D printing and preparation method of mercaptan-alkene light-cured resin for 3D printing

The invention relates to the technical field of 3D printing, in particular to mercaptan-alkene light-cured resin for 3D printing and a preparation method of the mercaptan-alkene light-cured resin for3D printing. The mercaptan-alkene light-cured resin for 3D printing is prepared from multi-mercaptan, an acrylic resin prepolymer, a reactive diluent, an initiator, an ultraviolet absorbent, a fillerand an auxiliary raw material. According to the 3D printing light-cured resin, under the existence of a photoinitiator, during printing polymerization forming, a chain transfer reaction between doublebonds and sulfydryl occurs to reduce the volume of a polymer, so that the mercaptan-alkene light-cured resin has the advantages that oxygen-free polymerization inhibition is realized, the crosslinking degree and the reaction speed can be controlled according to different vinyl monomers, and a small number of the photoinitiators are used. By introduction of mercaptan-alkene click reaction into the3D printing resin, the curing time can be shortened, the toughness and the hardness of a 3D printing material can be improved, the production efficiency is improved, and the energy utilization rate is greatly increased.
Owner:HANGZHOU LEYI NEW MATERIAL TECH CO LTD

Quantitative evaluation method of heavy oil steam stimulation water flooded layer

The invention provides a quantitative evaluation method of a heavy oil steam stimulation water flooded layer. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer comprises the following steps: step 1, determining resistivity of mixed formation water of the heavy soil stimulation water flooded layer according to analysis assay data or logging curve data of the formation water of the water flooded layer; step 2, calculating oil reservoir water saturation Sw according to rock resistivity of a coring well by using an archies formula on the basis of determining the resistivity of the mixed formation water of the heavy oil stimulation water flooded layer; step 3, calculating oil displacement efficiency eta of the water flooded layer according to the calculated oil reservoir water saturation Sw and oil-water relative permeability test data of the coring well; step 4, establishing a heavy oil stimulation water flooding degree judgment standard to realize quantitative judgment and recognition of the water flooding degree of the heavy oil stimulation. The quantitative evaluation method of the heavy oil steam stimulation water flooded layer has better operability, contributes to generalization, and provides a practical and feasible method for fine description of the heavy oil reservoir stimulation water flooded layer.
Owner:CHINA PETROLEUM & CHEM CORP +1

Round tube positioning mechanism and method

The invention relates to a round tube positioning mechanism. The lower part of a sliding supporting rod is positioned in the axis of a connection base through a cylindrical pin; fine threads are arranged in the middle of the sliding supporting rod and are in threaded connection with an adjustment nut; the adjustment nut supports a guide sleeve; symmetrically arranged vertical long-strip stepped holes are formed in the guide sleeve; a through hole is formed in the upper part of the sliding supporting rod; a finished bolt sequentially penetrates through one long-strip stepped hole and the through hole of the sliding supporting rod and then is movably connected with a butterfly nut in the other long-strip stepped hole; the bottom surface of a bolt head of the finished bolt and the bottom surface of the butterfly nut are clamped and connected onto the long-strip stepped holes respectively; a stepped pin is arranged in the axis of the upper end of the guide sleeve; a V-shaped supporting base is arranged on the stepped pin; symmetrical ball bearings are arranged on the V-shaped supporting base. The round tube positioning mechanism is simple to machine, the height can be adjusted, meanwhile, the positioning precision is high, and with the adoption of a positioning method, various specifications of pipe fittings can be positioned and supported.
Owner:SHENYANG AIRCRAFT CORP

Switch power supply control chip and switch power supply control system

The invention relates to a switch power supply control chip which comprises a power supply voltage supply module, a power factor correction module, a logic control module and a sampling signal module, wherein the power supply voltage supply module is used for receiving a direct current (DC) pulse signal of a main stage winding and supplying power for all the modules of the switch power supply control chip; the power factor correction module is respectively and electrically connected with the sampling signal module and the logic control module; the logic control module is respectively and electrically connected with the power factor correction module, the power supply voltage supply module and the sampling signal module; the sampling signal module is used for receiving the DC pulse signal and is respectively and electrically connected with the power factor correction module and the logic control module. The switch power supply control chip can directly sample an internal high-voltage power metal oxide semiconductor (MOS) field-effect tube, and can control the current-limiting point phase position and the amplitude of the chip by the voltage information of an auxiliary winding, thus realizing active high power factor control and high-accuracy constant current output.
Owner:普缘芯半导体科技(上海)有限公司

New method for dividing water injection layer sections of offshore water injection well

The invention provides a new method for dividing water injection layer sections of an offshore water injection well. The new method for dividing the water injection layer sections of the offshore water injection well includes the following steps: a step 1, comprehensively considering the permeability gradational difference, the thickness gradational difference, the number of small layers in each layer, the water logging degree of each layer and the pressure difference so as to determine a water injection well layered injection boundary standard through a numerical simulation method; a step 2, counting the number of layers, the sand thickness, the permeability, the water logging degree and pressure distribution of an injection opened layer position of an existing layer section of the water injection well, and calculating the thickness gradational difference and the permeability gradational difference of each water injection layer section; a step 3, performing layer section primary division on the water injection well according to the layered injection boundary standard; and a step 4, considering the water injection process, performing suitable adjustment, and acquiring a final division result. The new method for dividing the water injection layer sections of the offshore water injection well is clear in thinking , is simple to apply, is feasible in offshore and similar oil reservoir water injection well layer section division.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for creating common maize inbred-line by introducing teosintes in maize cultivated specie

InactiveCN102484981ASimple applicationEasy to grasp and implementPlant genotype modificationAgricultural scienceCrop
The invention discloses a method for creating a common maize inbred-line by introducing teosintes in a maize cultivated specie, belonging to a method for creating maize breeding materials in crop breeding. The method integrates multiple technologies of creating the common maize inbred line, comprising the following steps: step 1, environment variation: giving only 12 hours of illumination everyday in an artificial darkroom to let teosintes and the maize cultivated specie flower in the same period; step 2, introduction of hybridization: according to a routine hybridization bagging method, using the cultivated specie as the female parent and the teosintes as the male parent to hybridize; step 3, backcrossing improvement: using the female parent cultivated specie corresponding to F1 as the female parent, taking F1 mixed pollen to backcross with the female parent to obtain BC1 seeds, sowing the BC1 seeds, taking BC1 mixed pollen to carry out secondary backcross with the female parent to obtain backcrossing second generation (BC2) seeds; step 4, pedigree breeding: sowing the BC2 seeds, preferably individual plants, carrying out continuous inbreeding of more generations to obtain a stable inbred-line; and step 5, using the stable inbred-line as the female parent, taking test line pollen to hybridize, planting and identifying the hybridized combinations, and comparing and screening excellent combinations.
Owner:重庆三峡农业科学院

Rock burst prediction method introducing gradient stress

The invention discloses a rock burst prediction method introducing gradient stress. The method comprises the following steps that the step 1, a surrounding rock tangential stress distribution curve ismeasured, and the stress intensity value is calculated according to the surrounding rock tangential stress distribution curve; the step 2, when the rock burst intensity judgment is conducted throughthe stress intensity ratio, the surrounding rock gradient stress distribution is combined, and the stress intensity value is divided by the stress intensity ratio, so that the gradient stress intensity ratio is obtained; the step 3, the statistics of engineering examples with the occurrence of the rock burst is conducted, rock burst example data are put into a calculation formula of the gradient stress intensity ratio, the rock burst grade is judged and predicted through the gradient stress intensity ratio, and the regional division is conducted on the result; and the step 4, the calculation result is analyzed and summarized, and a criterion of predicting the rock burst grade through the stress intensity ratio and the gradient stress intensity ratio is obtained. Compared with the prediction accuracy of an existing criterion, the prediction accuracy of the rock burst criterion established by the rock burst prediction method is substantially improved, utilization is easy and convenient,and the criterion can guide the design and construction of deep-buried tunnel engineering.
Owner:WUHAN INSTITUTE OF TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products