Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

17results about How to "Improve management quality" patented technology

A cross-border logistics information visualization management system and method based on big data

ActiveCN118569759BImprove management qualitySolve the problem of low management qualityDatabase management systemsVisual data miningLogistics managementInformation visualization
The present invention discloses a cross-border logistics information visualization management system and method based on big data, which belongs to the field of cross-border logistics information management. The cross-border logistics information visualization management system based on big data includes: a logistics information collection module, a visualization design module, a visualization effect analysis module and a management quality optimization module. The present invention analyzes the logistics information management quality index, thereby optimizing the visualization management quality of the visualization design module through the logistics information management quality index, notifying the management personnel to regularly maintain the visualization design module of the cross-border logistics information visualization management, thereby improving the quality of the cross-border logistics information visualization management, and solving the problem of low quality of cross-border logistics information management in the prior art.
Owner:GUANGZHOU TUOWEI TIANHAI INT LOGISTICS CO LTD

Cold and hot data storage method and system oriented to cross-domain heterogeneous storage system

The invention belongs to the technical field of cold and hot data identification management, and provides a cold and hot data storage method and system oriented to a cross-domain heterogeneous storage system. Cold and hot data portraying is carried out by comprehensively considering multiple dimensions of data access frequency, data updating frequency, business importance, file correlation and data freshness; the cold and hot attributes of the data are comprehensively judged, the actual value and the use requirement of the data are reflected, the data are accurately classified into hot data, temperature data and cold data, the importance and the access requirement of the data can be dynamically evaluated, the hot data, the temperature data and the cold data are stored in different storage spaces in a layered mode, and the data storage efficiency is improved. Therefore, data storage management is more effectively carried out, the experience feeling of the cross-domain heterogeneous storage system is improved, and popularization and application are facilitated.
Owner:SHANDONG COMP SCI CENTNAT SUPERCOMP CENT IN JINAN +1

Road state early warning method, system and device and storage medium

The invention relates to the technical field of data processing, and particularly provides a road state early warning method, system and device and a storage medium, and the method comprises the steps: collecting road state information which comprises environment information, flow information, accident information and congestion information; generating an abnormal event and an abnormal event position based on the state information, and generating a road section limiting speed and early warning prompt information for the abnormal event; and calling a target road display screen based on the position of the abnormal event, and outputting the road section limiting speed and early warning prompt information of the abnormal event to the target road display screen. According to the invention, the road state is collected through the sensor, abnormity screening is carried out on the road state, the abnormal events are generated based on the screening result, after the abnormal events are integrated, the display screen is controlled to carry out display early warning, and the road management quality is improved.
Owner:浪潮智慧科技有限公司 +1

Archive management system and method thereof

The invention discloses an archive management system and method, and relates to the technical field of intelligent archive management.The archive management method comprises the steps that paper archives are scanned into an electronic database, a number and a classification label are distributed to each paper archive, and a paper document text abstract is generated for each paper archive; searching the required paper archive according to the query condition, and displaying the detailed information of the required paper archive; modifying or deleting the paper archives needing to be modified, and recording the modifying or deleting time and operators at the same time; regularly copying the paper archives in the electronic database to an external storage device; and carrying out statistical analysis on the paper archives in the electronic database to generate a chart or a report. Therefore, the working efficiency and the archive management quality can be improved, the requirements of hospitals can be better met, and the archive management level is improved.
Owner:JILIN UNIVERSITY

Visual management method and system for roadbed compaction condition and roadbed compaction equipment

The invention provides a roadbed compaction condition visual management method and system and roadbed compaction equipment, and belongs to the technical field of pavement construction management.The method comprises the steps that S1, a compaction path is obtained and divided into different compaction areas; s2, in the roadbed compaction process, compaction position information of a compaction area is obtained in real time, and a hash code corresponding to the compaction area is generated according to the compaction position information; s3, comparing the Hash code generated in the nth compaction process with all Hash codes generated before the nth compaction process, and determining compaction times based on a comparison result; and S4, establishing a roadbed compaction model, and uploading the compaction position information and the compaction times to the roadbed compaction model in real time for visual display. According to the method, the compaction times and the compaction positions are associated by using the Hash codes, and the compaction times of the compaction area are visually displayed through the compaction model, so that the roadbed compaction condition is visually managed.
Owner:XIAN LABEIDE INFORMATION TECH CO LTD

Intelligent construction project management system based on BIM

The invention relates to the technical field of project management, in particular to an intelligent construction project management system based on BIM. The project management system comprises a project management digital platform, a project talent resource database, a project equipment management module, a project process management module, a monitoring acquisition module, a project natural environment management module, a project user management module, a third-party supervision module and a server. The project management digital platform is used for providing platform support for the project management system; the project talent resource database is used for storing and managing project talent resources and establishing a project talent file; according to the invention, multidirectional integrated comprehensive management of project persons, equipment, processes, environments and supervision is realized, project management quality is improved, project resource configuration is optimized, risks are reduced, communication between departments is enhanced, project organization efficiency is improved, real-time data support is provided for project management, and project management efficiency is improved. The platform enhances communication cooperation and information sharing in aspects of project teams, supervision and the like.
Owner:HUNAN SANY IND VOCATIONAL & TECH COLLEGE

Cellar sealing treatment method for wine cellar

The invention provides a cellar sealing treatment method for a wine cellar, and relates to the technical field of wine cellar maintenance. The cellar sealing treatment method comprises the following steps: cleaning original cellar skin mud of a wine cellar, and respectively preparing cellar sealing mud and a concentrated yellow mud aqueous solution; sealing the wine cellar by using cellar sealing mud, and dragging the cellar on the surface of the cellar sealing mud subjected to cellar sealing treatment by using a concentrated yellow mud aqueous solution to form a cellar sealing skin layer coated on the surface of the cellar sealing mud; the concentrated yellow mud aqueous solution contains a microbial inhibition component; and / or a microorganism inhibition solution containing a microorganism inhibition component is independently sprayed in the pit dragging treatment; and carrying out coating treatment by using a covering layer. According to the cellar sealing treatment method provided by the invention, by innovatively combining cleaning, bacteriostasis, cellar dragging and coating layer treatment, an efficient and stable solution capable of improving the management quality of the wine cellar is provided, the problem of bacterial plaque is effectively avoided, and the sealing performance of cellar sealing mud and the quality of a wine body are improved.
Owner:SICHUAN MIANYANG FORGOOD DISTILLERY

Substrate management system for aquaculture pond

The utility model relates to the technical field of aquaculture, in particular to a substrate management system for an aquaculture pond, which comprises the aquaculture pond, an operation module, a traction module, fixing modules and a furling module, traction points are arranged on the peripheral side of the aquaculture pond, the operation module, the traction module and the furling module are sequentially connected, and a plurality of fixing modules are arranged around the aquaculture pond; the operation module enters the aquaculture pond and drives one end of the traction module to wind all the fixing modules from the traction point until one end of the traction module moves and is connected to the furling module; after the fixing module is detached, the winding module winds the traction module, so that the traction module is in contact with the bottom of the aquaculture pond, and the bottom turning effect of the aquaculture pond is achieved. The traction module is pulled through the operation module to avoid water equipment and sundries, cables are laid underwater in the aquaculture pond, then the traction module is wound through the winding module, the bottom of the pond is scraped and turned over through the traction module, and mechanical operation of substrate management is achieved.
Owner:ZHUHAI LIYANG SEEDLING BREEDING CO LTD

Three-stage storehouse measuring instrument storage system

ActiveCN222361463UImprove access efficiencySave the step of scanning codeStorage devicesComputer hardwareEngineering
The utility model relates to a three-level storehouse measuring instrument storage system, which belongs to the technical field of electric energy meter storage management and comprises a storehouse body, an upper computer and a goods shelf storage module arranged in the storehouse body, the goods shelf storage module comprises at least three first storage goods shelves, and each first storage goods shelf comprises a base, a pair of side frames, a top frame and a storage space mechanism. The bin position mechanism comprises a plurality of mounting plates, a plurality of blocking strips are fixed on each mounting plate, a storage frame position is formed between any two adjacent blocking strips, and a corresponding electric meter is placed in each storage frame position; a mounting strip is fixed to the front end of the mounting plate, guide lamps are arranged at the positions, corresponding to the middles of the storage frame positions, of the front end of the mounting strip, detection cameras are arranged at the upper ends of the storage frame positions, the guide lamps and the detection cameras are electrically connected with an upper computer, and the upper computer is used for controlling the guide lamps to be turned on. According to the utility model, the electricity meters are convenient and fast to take, and the taking efficiency of the electricity meters in the three-level storeroom is effectively improved.
Owner:国网福建省电力有限公司营销服务中心

Vascular access outpatient service intelligent management system based on artificial intelligence

The invention relates to the technical field of medical management, in particular to a vascular access outpatient service intelligent management system based on artificial intelligence. The system comprises a patient outpatient service information file integration module, a patient vascular access use risk optimization selection module, a patient vascular access quality abnormity early warning module and a vascular access abnormity feedback management module. The method comprises the following steps: acquiring basic information data of a patient and previous vascular access use record data, performing information file integration processing, performing vascular access suggestion design and access use risk optimization selection, and generating a patient outpatient service optimal selection to establish a vascular access; and monitoring the physiological data of the patient and the use condition data of the vascular access of the patient in real time by using intelligent equipment, performing intelligent abnormal early warning of the vascular access and abnormal feedback management of the vascular access, and generating an abnormal feedback management scheme of the vascular access of the patient so as to execute corresponding abnormal feedback management work of the vascular access of the patient. The efficiency and accuracy of vascular access management can be improved.
Owner:SHANDONG FIRST MEDICAL UNIVERSITY FIRST AFFILIATED HOSPITAL (QIANFO MOUNTAIN HOSPITAL OF SHANDONG PROVINCE)

Pipeline network analysis method, system, terminal and storage medium based on depth priority

The present invention relates to the field of intelligent management technology, and specifically provides a pipeline network analysis method, system, terminal and storage medium based on depth priority, including: collecting basic information of the pipeline network, the basic information including the rated flow of the pipeline and the rated flow of the processing equipment; collecting multiple flow values ​​by flow meters arranged at multiple monitoring nodes, and screening out abnormal flow values ​​from the multiple flow values, and locating the fault section based on the abnormal flow values; using the depth-first algorithm to screen out the first pipeline group having a common starting point and end point with the fault section and the second pipeline group having a common end point with the fault section from the pipeline network topology; calculating the remaining flow of the first pipeline group according to the rated flow and actual flow of the first pipeline group, allocating the flow carrying task to the first pipeline group according to the pre-fault flow of the fault section, and allocating the flow carrying task to the second pipeline group when the remaining flow of the first pipeline group is lower than the pre-fault flow. It can realize the fault location and fault handling of the port pipeline network.
Owner:烟台海港信息通信有限公司 +1

Intelligent building condition monitoring management system based on cloud computing and multi-dimensional data

The present invention discloses an intelligent building status monitoring and management system based on cloud computing and multi-dimensional data, which belongs to the technical field of intelligent building status monitoring and management, and comprises a monitoring module, a supporting evaluation module, an opinion feedback module and a personalized management module; the monitoring module is used for real-time monitoring of intelligent buildings, obtaining monitoring data corresponding to each monitoring item, and displaying the monitoring data in real time in a preset building monitoring model; the opinion feedback module receives feedback data uploaded by residents, and stores the feedback data in a corresponding storage node; and based on the feedback data stored in the storage node, generates a resident opinion portrait corresponding to the resident according to a preset portrait template; the supporting evaluation module evaluates each supporting equipment, divides the building monitoring model into regions, and forms a plurality of unit management regions; sets a target management standard corresponding to each unit management region; and the personalized management module is used for personalized management of each unit management region.
Owner:CARBON CLOUD DIGITAL ENERGY TECHNOLOGY (BEIJING) CO LTD

A Multi-Agent-Based Collaborative Management Method and System for Agricultural Production Processes

PendingCN122674988Aimprove accuracyImplement scientific assessment
This invention relates to the technical field of agricultural production management and discloses a collaborative management method and system for agricultural production processes based on multiple intelligent agents. The method intelligently and accurately selects the agricultural production guidance agents needed for user-side agricultural production based on user-side agricultural production stage location data, user-side agricultural production process analysis data, artificial intelligence algorithms, and standard agricultural production stage information for different agricultural production guidance agents. Furthermore, it intelligently formulates guidance suggestions for user-side agricultural production problems based on agricultural production problem characteristic data, user-side agricultural production stage location data, user-side agricultural production process analysis data, user-side agricultural production guidance agent characteristic data, and in conjunction with agricultural management platforms and internet platforms. This enables the comprehensive and reliable formulation of highly scenario-based and operable agricultural production guidance suggestion data based on multiple agricultural production guidance agents, achieving intelligent and convenient agricultural production management for users.
Owner:INTELLIGENT IND INTERNET (BEIJING) TECHNOLOGY CO LTD

Modular management method, device and equipment for cab parts and medium

The invention provides a modularized management method and device for cab parts, equipment and a medium, and relates to the technical field of automobile design. The method comprises the following steps: determining two large classes of cab parts and a plurality of part modules in each large class of cab parts; obtaining cab parts of each part module from a product data management system; according to the types of the cab parts, the cab parts of the part module are divided into a plurality of part subclasses, and the inherent characteristics of each part subclass are identified; according to the inherent characteristics of all the part subclasses, all the cab parts in the same part subclass are optimized, and optimized parts of the part subclasses are obtained; and performing cab part management based on the optimized parts of the part large classes, the part modules and the part subclasses. According to the method, the design number of the cab parts can be reduced, and therefore the management cost of the cab parts is reduced.
Owner:SINO TRUK JINAN POWER CO LTD

Digital twin system and method for tire production

PendingCN122243346AImprove management qualityMeet individual needsDesign optimisation/simulationCommerce
This invention relates to the field of tire manufacturing technology, and in particular to a digital twin system and method for tire production, comprising: a multimodal data acquisition layer, a holographic quality archive construction layer, an intelligent matching and decision optimization layer, a flexible sorting execution layer, and a data service and interaction platform. It completely breaks down data silos, establishing a complete and structured digital twin archive for each tire, improving management quality. Furthermore, the system no longer performs simple binary judgments, but instead seeks the optimal match between tires and orders, maximizing the satisfaction of personalized customer needs and significantly enhancing product added value and customer satisfaction. Secondly, through a multi-objective optimization algorithm, it can comprehensively consider multiple factors such as inventory, order priority, and sorting efficiency to achieve intelligent scheduling and optimal allocation of tire inventory, reducing the waste of high-quality tires and the ineffective inventory of substandard tires, thereby improving overall operational efficiency.
Owner:SHANDONG XINTU TIRE CO LTD

File binding plate

ActiveCN222372561Uimprove aestheticsImprove management qualitySheet bindingTesting MethodsData binding
The utility model provides a data binding plate, which relates to the technical field of binding tools and comprises a binding plate body. A placing groove is formed in the center position of the binding plate main body; the storing and taking groove is formed in the bookbinding plate body and located on the first side of the containing groove; the electric binding device is fixed on the binding plate main body and is positioned on the second side of the placing groove; the auxiliary positioning structures are fixed on the binding plate main body and are positioned on the third side and the fourth side of the placing groove; and the electric switch button is arranged on the binding plate main body and is electrically connected with the electric binding device. According to the scheme, materials can be arranged and bound quickly in a standardized mode, and the working efficiency and the attractiveness of the materials are improved.
Owner:SHANDONG DEZHOU TOBACCO

Nuclear power station scaffold information management system and management method

The invention provides a nuclear power station scaffold information management system and management method. The nuclear power station scaffold information management system comprises a background client, a plurality of mobile terminals and a project management system which are in communication connection. And the plurality of mobile terminals are used for receiving the scaffold related information uploaded by the different role personnel, transmitting the scaffold related information to the background client and displaying the information within the permission range of the different role personnel. And the project management system is used for executing the work ticket state by different role personnel and sending related information of the work ticket state to the background client and the plurality of mobile terminals. And the background client is used for transmitting the scaffold related information and the work ticket state related information within the permission range to the scaffold information management software logged in by the different role personnel according to the permissions of the different role personnel. According to the invention, the scaffold information is electronically managed by establishing the scaffold information management system of the nuclear power station, so that the problem that the scaffold information transmission of the nuclear power station is not timely and incomplete is effectively solved.
Owner:SANMEN NUCLEAR POWER CO LTD