A
system and method is provided for utilizing output-
timing data to control at least one output timing parameter of a point-of-load (“POL”)
regulator. Specifically, a power supply controller (“controller”) is adapted to transmit output-
timing data to at least one POL
regulator. In one embodiment of the present invention, each POL
regulator includes an output builder, a
control unit and a storage device. The
control unit is adapted to store the output-
timing data in the storage device. The
control unit and the output builder are then adapted to produce an output having at least one output timing parameter in accordance with the output-timing data. Examples of output-timing data include
sequencing data, turn-on data, turn-off data, termination data, slew-rate data, etc. For example, a POL regulator may be adapted to utilize output-timing data, or a portion thereof (e.g., slew-rate data), to generate an output having a particular
slew rate. Similarly, a POL regulator may be adapted to utilize output-timing data, or a portion thereof (e.g.,
sequencing data, turn-on data, etc.), to determine (or calculate) a period of time to wait (e.g.,
delay period) before the output is generated. In other words, output-timing data can be used to produce a series of outputs in a particular order, or sequence.