The invention discloses a bridge hollow-
pier cantilever formwork and a construction method thereof and belongs to the technical field of
road construction. The problems of long construction period,
poor quality effect and high
safety risk existing when an existing bridge high-
pier column is in the form of a hollow
pier and a shaped steel mold is adopted are solved. The bridge hollow-pier
cantilever formwork is short in construction period, good in overall appearance quality, free of layered
casting marks and does not need subsequent large-area modification, a construction process is simple, the technology is easy to master, the bridge hollow-pier
cantilever formwork is convenient to operate and reliable in quality, is suitable for construction on a narrow site, is beneficial to clean and safe civilized construction on the site, creeping formwork equipment, a hanging operation platform and safety protectors are connected into a whole, aerial work is relatively safe, construction heightis not limited, a creeping formwork and the operation platform rise layer by layer, and compared with conventional formwork turnover construction, construction safety risks are greatly reduced.