43results about How to "Not easy to age and deform" patented technology

High-strength antibacterial aluminum alloy for aluminum alloy ladder and preparation method thereof

The invention relates to the technical field of aluminum alloy ladder preparation, and particularly relates to high-strength antibacterial aluminum alloy for an aluminum alloy ladder and a preparation method thereof. The aluminum alloy comprises a high-strength aluminum alloy matrix and a micro-arc oxidation film, wherein the micro-arc oxidation film is arranged on the surface of the aluminum alloy matrix, the weight of a hole sealing agent on the micro-arc oxidation film is 0.15 g / cm<2> to 0.90 g / cm<2>, and the hole sealing agent covers at least 92% of micropores in the micro-arc oxidation film. The preparation method comprises the steps of smelting metal, modifying, refining and degassing, pouring and forming and performing quenching treatment, aging treatment, micro-arc oxidation and hole sealing treatment, wherein in the step of modifying, nanometer modificators are uniformly dispersed into liquid alloy obtained by smelting; in the step of refining and degassing, 0.23% to 0.38% of hexachloroethane is added to the modified liquid alloy so as to refine and degas; and the aging treatment is divided into four-stage aging treatment. The aluminum alloy prepared by adopting the preparation method has the characteristics of high hardness, high strength, wear resistance, corrosion resistance, good anti-cracking performance, good antibacterial effect, difficulty in aging and deformation and long service life.
Owner:浙江洋铭实业有限公司

Repair method of vehicle bump pavement of bridgehead

The invention relates to a repair method of the vehicle bump pavement of a bridgehead. The repair method comprises the following steps: detecting a disengaging position in an approach slab of a damaged bridge by a detection radar, marking the positions of grouting holes I on the surface of the approach slab and drilling, wherein the grouting holes I reach the hard layer and are distributed in an array manner, the center distance between the adjacent grouting holes I is 10-20 cm, and the disengaging position is enabled to fall into the array range; enabling grouting holes II to penetrate the soft layer and to be crossed with the grouting holes I, and arranging one-way valves for exhausting at two ends of the grouting holes II; grouting the grouting holes I and detecting the slurry filling conditions of the disengaging position, the grouting holes I and the grouting holes II in time by a three-dimensional detection radar, and stopping the grouting when the disengaging position, the grouting holes I and the grouting holes II are filled with slurry; detecting and rechecking the filled part by the detection radar after grouting stopping, and drilling and grouting parts which are not filled with slurry again. The method solves the problem of the difference between settling velocities of the hard layer and the soft layer.
Owner:JIANGSU DINGTAI ENG MATERIAL

Liquid crystal polyester molding composition and application thereof

ActiveCN106380790AImprove self-fibril abilityExcellent high rigidityLiquid crystal compositionsPolyesterFiber
The invention discloses a liquid crystal polyester molding composition and application thereof. The liquid crystal polyester molding composition is prepared from the following components: 30 to 100 parts of liquid crystal polyester, 0 to 30 parts of other thermoplastic polymers and 0 to 70 parts of enhanced packing; based on the total weight of the liquid crystal polyester molding composition, the weight content of a fluorine element is 50ppm to 2000ppm and the weight content of a magnesium element is 0.1ppm to 500ppm. According to the liquid crystal polyester molding composition, the content of the fluorine element in the liquid crystal polyester molding composition is controlled within a range of 50ppm to 2000ppm and the weight content of the magnesium element is controlled within a range of 0.1ppm to 500ppm, so that a fiber self-formation capability of the liquid crystal polyester can be effectively improved; self-formed fibers are induced by the fluorine element to be arrayed and have a direction disordered property; the two elements are synergistically combined so that the liquid crystal polyester molding composition has good high-rigidity performance and the difference of thermal expansibility in vertical and horizontal directions can be remarkably reduced; the liquid crystal polyester molding composition is used as an exhausting blade device material and a prepared product has the advantages of thin walls and light weight; the utilization stability of an exhausting blade device can be remarkably improved; the service life is prolonged in a severe environment; the exhausting blade device has the characteristics of uneasiness of being abraded, aged and deformed, small noises and the like.
Owner:KINGFA SCI & TECH CO LTD +1

Pavement restoration method

The invention relates to a pavement restoration method. The pavement restoration method comprises the steps that a detection radar is utilized for detecting the void positions in a butting plate of a damaged bridge, the positions of grouting holes I are marked on the surface of the butting plate and are drilled, and the grouting holes I are deep to a hard soil layer, and are distributed in an array mode; the distance between the centers of the adjacent grouting holes is 10-20cm and the void positions fall in the array range; all grouting holes II penetrate through a soft soil layer and are intersected with the grouting holes I; the two ends of all the grouting holes are provided with exhausting one-way valves; grouting is carried out on the grouting holes I, and the three-dimensional detection radar is utilized for detecting the filling conditions of slurry in the void positions, all the grouting holes I and all the grouting holes II, and the grouting is stopped when the void positions, all the grouting holes I and all the grouting holes II are filled with slurry; after the grouting is stopped, the detecting radar is utilized for detecting and rechecking the filled parts, and drilling and grouting are carried out again on the parts without being filled with the slurry. The pavement restoration method has the advantage that the problem of the settling velocity difference between the hard soil layer and the soft soil layer is solved.
Owner:JIANGSU DINGTAI ENG MATERIAL

Power switch with waterproof and dustproof functions and installation method thereof

The invention belongs to the technical field of power switchesh, in particular to a power switch with waterproof and dustproof functions and an installation method thereof. The power switch comprisesa power switch body, one side of the power switch body is provided with a panel. An inner shell and an outer shell are arranged on the outer side of the power switch body; the openings of the inner shell and the outer shell are movably connected with a mask; one side of the mask is rotationally connected with a knob; one side, close to the mask, of the knob is fixedly connected with one end of a rotating shaft, the other end of the rotating shaft extends to the inner side of the inner shell and is fixedly connected with one side of a turntable, a pushing shaft is fixedly connected to the top of the other side of the turntable, a frame slidably sleeves the outer side of the pushing shaft, and the top end of a pressing rod is fixedly connected on the bottom side of the frame. The power switch is reasonable in design, the opening and the opening area of the mask are effectively reduced, the sealing part is conveniently arranged, the sealing part is not prone to aging and deformation, reliability is high, the service life of the power switch is prolonged, on-off action of the power switch is conveniently achieved, and the power switch is suitable for application and popularization.
Owner:九江职院产教融合发展有限公司

Dam reinforcement method

ActiveCN104047268AAvoid destructionConsistent fluidityBarrages/weirsEngineeringSizing
The invention relates to a dam reinforcement method and a reinforcing sizing agent. The dam reinforcement method comprises the following steps: selecting a section of dam needing to be reinforced, and manufacturing an enclosing cover adapting to a dam body according to the shape of the dam body; placing the enclosing cover on the outer side of the dam body, wherein the lower end of the enclosing cover is inserted in underwater silts and the upper end of the enclosing cover emerges from water, and side panels of the enclosing panel are arranged close to the outside surface of the dam body and cling to the outside surface of the dam body through sealing strips; placing a plurality of grouting lines in the enclosing cover in sequence, wherein the lower ends of the grouting lines extend into the bottom of the enclosing cover; grouting grouting holes and detecting the sizing agent filling condition immediately by an underwater camera, filling the inner space of the enclosing cover with the sizing agent from the bottom of the enclosing cover gradually, and draining water accumulated in the inner space from the top of the enclosing cover, and when the sizing agent overflows from the top of the enclosing cover, stopping grouting; after the sizing agent is fully solidified, taking down the enclosing cover and carrying out hole sealing on the grouting lines; forming a waterproof reinforcing structure layer on the outer side of the dam after the sizing agent is solidified to prevent water from seeping into the dam body or damaging the dam body due to erosion of water to the surface of the dam body.
Owner:JIANGSU DINGTAI ENG MATERIAL

Method for repairing bridgehead abutment position of road surface

The invention relates to a method for repairing a bridgehead abutment position of a road surface. The method comprises the steps that a detecting radar is used for detecting the void position in a damaged bridge approach slab, the positions of first injected holes are marked in the surface of the approach slab and are drilled, the first injected holes reach a hard soil layer, the first injected holes are arranged in an array way, the central distance of the adjacent first injected holes is 10-20cm, the void position drops in the array range, second injected holes communicate a soft soil layer and are intersected with the first injected holes, the two ends of each second injected hole are provided with an exhaust single-way valve respectively, the first injected holes are grouted, a three-dimensional detecting radar is used for detecting the void position and the slurry filling condition inside the first injected holes and the second injected holes in time, and when the void position, the first injected holes and the second injected holes are filled with the slurry, the grouting is stopped; the detecting radar is used again for detecting and re-checking the filling position after the grouting is finished, and the positions which are not filled with the slurry are drilled and grouted again. The method solves the problem that the hard soil layer and the soft soil layer are different in sinking speed.
Owner:JIANGSU DINGTAI ENG MATERIAL

A high-strength antibacterial aluminum alloy for aluminum alloy ladders and its preparation method

The invention relates to the technical field of aluminum alloy ladder preparation, and particularly relates to high-strength antibacterial aluminum alloy for an aluminum alloy ladder and a preparation method thereof. The aluminum alloy comprises a high-strength aluminum alloy matrix and a micro-arc oxidation film, wherein the micro-arc oxidation film is arranged on the surface of the aluminum alloy matrix, the weight of a hole sealing agent on the micro-arc oxidation film is 0.15 g / cm<2> to 0.90 g / cm<2>, and the hole sealing agent covers at least 92% of micropores in the micro-arc oxidation film. The preparation method comprises the steps of smelting metal, modifying, refining and degassing, pouring and forming and performing quenching treatment, aging treatment, micro-arc oxidation and hole sealing treatment, wherein in the step of modifying, nanometer modificators are uniformly dispersed into liquid alloy obtained by smelting; in the step of refining and degassing, 0.23% to 0.38% of hexachloroethane is added to the modified liquid alloy so as to refine and degas; and the aging treatment is divided into four-stage aging treatment. The aluminum alloy prepared by adopting the preparation method has the characteristics of high hardness, high strength, wear resistance, corrosion resistance, good anti-cracking performance, good antibacterial effect, difficulty in aging and deformation and long service life.
Owner:浙江洋铭实业有限公司

A kind of liquid crystal polyester molding composition and its application

ActiveCN106380790BImprove self-fibril abilityExcellent high rigidityLiquid crystal compositionsFiberPolyester
Disclosed are a liquid crystal polyester molded composition and application thereof. The composition comprises the following components: 30-100 parts of liquid crystal polyester, 0-30 parts of other thermoplastic polymers, and 0-70 parts of reinforcing filler. On the basis of the total weight of the liquid crystal polyester molded composition, the weight content of fluorine is 50-2,000 ppm, and the weight content of magnesium is 0.1-500 ppm. According to the present invention, the content of fluorine in the liquid crystal polyester molded composition is controlled within the range of 50-2,000 ppm, and the content of magnesium is controlled within the range of 0.1-500 ppm, thereby effectively improving the autologous fiber ability of the liquid crystal polyester. Moreover, induced autologous fiber arrangement of fluorine has the directional disorder characteristic. Synergistic combination of the two elements can significantly reduce the difference of thermal expansion in vertical and horizontal directions while enabling the liquid crystal polyester molded composition to have excellent rigidity. Therefore, workpieces prepared from the liquid crystal polyester molded composition as the material of an exhaust blade are thin in wall, light in weight and low in noise, can significantly improve usage stability of the exhaust blade, prolong the service life in severe environment, and are not liable to wear, age or deform.
Owner:KINGFA SCI & TECH CO LTD +1

Hydraulic cylinder and control rod hydraulic drive system

ActiveCN111997957BLong-term supportRealize suspension supportPiston ringsNuclear energy generationHydraulic cylinderThermodynamics
The invention relates to the field of nuclear reactors, and provides a hydraulic cylinder and a control rod hydraulic drive system. The hydraulic cylinder includes an outer casing and an inner casing. The inner chamber of the outer casing includes an upper chamber and a lower chamber communicating with the upper chamber. A stepped surface is formed between the upper chamber and the lower chamber, and a hydraulic ring groove is opened on the stepped surface. , the side wall of the outer casing is provided with a water inlet channel communicating with the hydraulic ring groove; the inner casing includes an upper casing located in the upper cavity and a lower casing located in the lower cavity, and the outer walls of the upper casing and the lower casing are provided with The first ring groove, the first ring groove is provided with an elastic support ring and a piston ring assembly sequentially along its radial direction from inside to outside, and the elastic support ring is used to drive the piston ring assembly part out of the first ring groove, so that the piston ring The assembly is in sliding and sealing engagement with the inner wall of the outer casing. The control rod hydraulic drive system includes a hydraulic cylinder. The invention utilizes the elastic support ring to realize the suspension support for the inner sleeve cylinder, avoids direct contact and friction between the inner sleeve cylinder and the outer sleeve cylinder, and prolongs the service life of the hydraulic cylinder.
Owner:TSINGHUA UNIV

A road repair method

The invention relates to a pavement restoration method. The pavement restoration method comprises the steps that a detection radar is utilized for detecting the void positions in a butting plate of a damaged bridge, the positions of grouting holes I are marked on the surface of the butting plate and are drilled, and the grouting holes I are deep to a hard soil layer, and are distributed in an array mode; the distance between the centers of the adjacent grouting holes is 10-20cm and the void positions fall in the array range; all grouting holes II penetrate through a soft soil layer and are intersected with the grouting holes I; the two ends of all the grouting holes are provided with exhausting one-way valves; grouting is carried out on the grouting holes I, and the three-dimensional detection radar is utilized for detecting the filling conditions of slurry in the void positions, all the grouting holes I and all the grouting holes II, and the grouting is stopped when the void positions, all the grouting holes I and all the grouting holes II are filled with slurry; after the grouting is stopped, the detecting radar is utilized for detecting and rechecking the filled parts, and drilling and grouting are carried out again on the parts without being filled with the slurry. The pavement restoration method has the advantage that the problem of the settling velocity difference between the hard soil layer and the soft soil layer is solved.
Owner:JIANGSU DINGTAI ENG MATERIAL

Repair method of bridge head jumping road surface to solve the difference in settlement speed between hard and soft soil layers

The invention relates to a bridge-head vehicle bump road surface repairing method for solving the problem of the settling velocity difference between a hard soil layer and a soft soil layer. The bridge-head vehicle bump road surface repairing method comprises the steps that a void position in an access board of a damaged bridge is detected through detection radar, the positions of first grouting holes are marked on the surface of the access board, drilling is conducted on the positions of the first grouting holes, the first grouting holes are deep enough to reach the hard soil layer, the first grouting holes are arranged in an array mode, the center-to-center distance between every two adjacent first grouting holes is 10-20 cm, and the void position is made to be located within the array range; all second grouting holes penetrate through the soft soil layer and intersect with the first grouting holes, and exhaust one-way valves are arranged at the two ends of each second grouting hole; grouting is conducted on the first grouting holes, the void position and the internal grout filling conditions of all the first grouting holes and all the second grouting holes are detected immediately through three-dimensional detection radar, and grouting is stopped when the void position, all the first grouting holes and all the second grouting holes are filled with grout; and the filling positions are detected and re-checked again through the detection radar after grouting is stopped, and the positions which are not filled with grout are drilled and grouted again. By the adoption of the bridge-head vehicle bump road surface repairing method, the problem of the settling velocity difference between the hard soil layer and the soft soil layer is solved.
Owner:JIANGSU DINGTAI ENG MATERIAL

An air conditioner outer wind deflector, its preparation method, and an air conditioner including the same

The invention discloses an air conditioner outer air deflector, a manufacture method thereof and an air conditioner comprising the same. The air conditioner outer air deflector comprises a base plate, a glue layer and a packing film, wherein the base plate is an alloy plate which is formed through an extrusion technique; the glue layer is glued on the surface of the base plate; and the packing film is adhered on the surface of the side, which is far away from the base plate, of the glue layer. According to the air conditioner outer air deflector, the extrusion-moulded base plate is adopted, so that the base plate has higher strength compared with an injection-moulded base plate, and thus the base plate cannot easily age and deform; meanwhile, a mode of the packing film is adopted instead of a mode of forming a paint film through spray coating, so that the color of the air conditioner outer air deflector is easy to control, and the phenomenon of unattractiveness caused by large color difference between the air conditioner outer air deflector and other components of the air conditioner is avoided; furthermore, the packing film is adhered to the surface of the base plate in a mode of forming the glue layer, so that the packing film can be adhered to the base plate more firmly; and the adhesion force is large, so that problems of bubbling, stripping and falling off of a spray coating component are avoided.
Owner:GREE ELECTRIC APPLIANCES INC +1

Repair method of bridge head jumping road surface

The invention relates to a repair method of the vehicle bump pavement of a bridgehead. The repair method comprises the following steps: detecting a disengaging position in an approach slab of a damaged bridge by a detection radar, marking the positions of grouting holes I on the surface of the approach slab and drilling, wherein the grouting holes I reach the hard layer and are distributed in an array manner, the center distance between the adjacent grouting holes I is 10-20 cm, and the disengaging position is enabled to fall into the array range; enabling grouting holes II to penetrate the soft layer and to be crossed with the grouting holes I, and arranging one-way valves for exhausting at two ends of the grouting holes II; grouting the grouting holes I and detecting the slurry filling conditions of the disengaging position, the grouting holes I and the grouting holes II in time by a three-dimensional detection radar, and stopping the grouting when the disengaging position, the grouting holes I and the grouting holes II are filled with slurry; detecting and rechecking the filled part by the detection radar after grouting stopping, and drilling and grouting parts which are not filled with slurry again. The method solves the problem of the difference between settling velocities of the hard layer and the soft layer.
Owner:JIANGSU DINGTAI ENG MATERIAL

A road repair method

The invention relates to a pavement rehabilitation method. The pavement rehabilitation method comprises the following steps that detection radar is used for detecting the disengagement position of a butt strap of a damaged bridge, the positions of first grouting holes are marked on the surface of the butt strap and are drilled, the first grouting holes reach a hard stratum and are arranged in an array mode, the center-to-center spacing of the adjacent first grouting holes is 10-20 cm, and the disengagement position falls into the array range; second grouting holes penetrate through the hard stratum and intersect with the first grouting holes, and the two ends of each second grouting hole are provided with one-way valves for exhausting air; the first grouting holes are grouted, the three-dimensional detection radar is used for detecting grout filling conditions in the disengagement position, the first grouting holes and the second grouting holes, and grouting is stopped when the disengagement position, the first grouting holes and the second grouting holes are full of the grout; and after grouting is stopped, the detection radar is used for detecting and examining the filling portions again, and the portions which are not filled with grout are drilled and grouted again. The problem that the sedimentation rates of the hard stratum and a soft soil layer are different is solved through the method.
Owner:JIANGSU DINGTAI ENG MATERIAL

The method of repairing the back of the bridgehead on the road surface

The invention relates to a method for repairing a bridgehead abutment position of a road surface. The method comprises the steps that a detecting radar is used for detecting the void position in a damaged bridge approach slab, the positions of first injected holes are marked in the surface of the approach slab and are drilled, the first injected holes reach a hard soil layer, the first injected holes are arranged in an array way, the central distance of the adjacent first injected holes is 10-20cm, the void position drops in the array range, second injected holes communicate a soft soil layer and are intersected with the first injected holes, the two ends of each second injected hole are provided with an exhaust single-way valve respectively, the first injected holes are grouted, a three-dimensional detecting radar is used for detecting the void position and the slurry filling condition inside the first injected holes and the second injected holes in time, and when the void position, the first injected holes and the second injected holes are filled with the slurry, the grouting is stopped; the detecting radar is used again for detecting and re-checking the filling position after the grouting is finished, and the positions which are not filled with the slurry are drilled and grouted again. The method solves the problem that the hard soil layer and the soft soil layer are different in sinking speed.
Owner:JIANGSU DINGTAI ENG MATERIAL

A kind of preparation method of shock-resistant and shock-absorbing rubber material

The invention discloses a preparation method of an anti-impact damping rubber material and belongs to the technical field of preparation of rubber materials. The method includes the steps of: 1) stirring magnesium chloride, a surfactant OP-10, white carbon black, carbon black and the like and performing ultrasonic vibration, adding ammonia water and allowing the mixture to stand, and filtering the mixture and washing a filter residue to obtain a core-shell structure composite material; 2) drying and calcining the composite material to obtain a reinforcing filler, and mixing natural rubber, eucommia ulmoides gum and butadiene rubber, and heat-mixing the components with stearic acid, an anti-aging agent, an accelerant and the like, and adding the reinforcing filler and a silane coupling agent to mix the components to obtain a mixed rubber compound; and 3) finally shaping the mixed rubber compound into strips and vulcanizing the rubber strips to produce the anti-impact damping rubber material. The preparation method is simple. The anti-impact damping rubber material has high anti-impact strength, has damping function and excellent anti-wear property, is not liable to age and deform, is greatly improved in practicability and prolonged in service life, and has wide market application prospect.
Owner:软谷材料实验室技术(广东)有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products