11results about How to "Reliable operating environment" patented technology

Distributed electricity-hydrogen coupling system coordination control method and device based on edge calculation and upper computer

The invention discloses a distributed electricity-hydrogen coupling system coordination control method and device based on edge calculation and an upper computer. The method comprises the following steps: firstly, acquiring electric quantity information and hydrogen energy data of each energy device in the distributed electricity-hydrogen coupling system; predicting the generating capacity of various distributed power generation devices and the power consumption of various loads; then selecting a target operation mode of the distributed electricity-hydrogen coupling system; and according to the optimization objective function and the constraint condition of the target operation mode, obtaining an optimal operation strategy of the target operation mode, and finally, the optimal operation strategy is sent to each energy device in the distributed electricity-hydrogen coupling system, so that the energy devices operate according to the optimal operation strategy, and distributed electricity-hydrogen coupling system coordination control based on edge calculation is completed. According to the method, the control speed of the distributed electricity-hydrogen coupling system can be remarkably improved, so that the overall operation efficiency is improved, and meanwhile, the reliability and the expandability of the system are enhanced.
Owner:特变电工(天津)智慧能源管理有限公司 +2

Power equipment protocol vulnerability detection method based on fuzzy test

ActiveCN118972136Aimprove understandingEnhance security detection capabilitiesSecuring communicationElectric power equipmentPower equipment
The invention relates to the technical field of power equipment protocol vulnerability detection methods, in particular to a power equipment protocol vulnerability detection method based on fuzzy testing. The method comprises the following steps of: extracting data from a power equipment transmission log, establishing a simulation model, analyzing a historical abnormal state, correcting transmission abnormity, generating a fuzzy test case, generating a transmission fuzzy test case and monitoring an abnormal response through simulation power equipment transmission model construction and historical abnormity analysis, and generating a fuzzy test result. And detecting and analyzing protocol vulnerabilities according to the protocol abnormal response of the monitoring fuzz test and analyzing stack data. According to the method, a simulation technology and historical data analysis are combined, so that the assessment capability of the protocol security of the power equipment is effectively improved; through power equipment protocol vulnerability detection optimization, the difficult recognition rate of new vulnerabilities in vulnerability detection is improved.
Owner:SHANGHAI RUIKAI ELECTRIC EQUIP CO LTD

Server prefabricated cabin

The invention provides a server prefabricated cabin which comprises a control part, an air inlet part and a storage part, a plurality of sets of servers and ventilation ducts are arranged in the storage part in the first direction, and a plurality of air draft devices arranged side by side in the first direction are installed on the first side of the storage part; an air inducing channel extending in the first direction is arranged in the air inlet part, the top end of the air inlet part is detachably installed at the bottom end of the storage part, air is introduced into the air inlet part from the air inlet end of the air inlet part and then flows through the storage part, and the air draft device extracts air of the ventilation air channels on the first sides of the multiple sets of servers so that the air can flow through the multiple sets of servers in the second direction. And finally, the server is discharged from the storage part so as to cool the server in the storage part. And the control part is used for accommodating a control system for controlling the operation of the server prefabricated cabin. Through cooperation of the control part, the air inlet part and the storage part as independent modules, rapid assembly is achieved, time is saved, heat dissipation can be conducted on the server through natural ventilation, and energy expenditure is saved.
Owner:WUXI HONGFAN INTELLIGENT TECH CO LTD

A server deployment method, apparatus, electronic device, storage medium, and program product.

This invention discloses a server deployment method, apparatus, electronic device, storage medium, and program product. Specific implementation includes: determining a deployment task and a server to be deployed as indicated by the deployment task; determining a startup mode corresponding to the server to be deployed based on the deployment task; determining a basic configuration file corresponding to the server to be deployed based on the startup mode; determining a file to be deployed based on the startup mode and the basic configuration file; and downloading the file to be deployed to the server to be deployed. By determining the deployment task through a device evaluation platform, automatic deployment of the server to be deployed is achieved. Determining the basic configuration file ensures consistency during deployment by the device evaluation platform. Downloading the file to be deployed to the server simplifies the deployment process, reduces manual operations, and provides a stable and reliable operating environment for upper-layer services.
Owner:CHINA UNICOM (SHANGHAI) IND INTERNET CO LTD

Efficient plate labeling machine with automatic decontamination mechanism

The utility model discloses an efficient plate labeling machine with an automatic decontamination mechanism, which relates to the technical field of plate processing equipment and comprises a labeling machine body and a transmission belt arranged on the labeling machine body. A protection shell is arranged on the right side of the upper end of the transmission belt, a plate body is arranged in the protection shell, a reciprocating sweeping mechanism is arranged on the protection shell, and a driving gear is fixedly installed at the output end of the motor. The utility model discloses an efficient plate labeling machine with an automatic decontamination mechanism. The driving gear and the driven gear are meshed with each other so as to drive the driven gear to rotate, the driven gear further drives the rotating shaft to rotate, the rotating shaft drives the sweeping rod to rotate along with the rotating shaft, the driving gear further drives the straight tooth rack to rotate, the straight tooth rack moves in the guide groove, and the straight tooth rack and the driven gear are meshed with each other. And the driven gear can move in a reciprocating mode, so that the plate body is repeatedly cleaned, and it can be ensured that dust on the surface of the plate is thoroughly cleaned.
Owner:东莞市荣增机械设备有限公司

Floating wind turbine and seabed data center fusion device

ActiveCN117212057Breduce construction costscooling effect
The application discloses a kind of floating wind turbine and seabed data center fusion device, including wind turbine, tower drum, float, mooring cable, seabed data center, the wind turbine is arranged on the tower drum, the tower drum is arranged on the float, the float is connected with the mooring cable, the seabed data center and the mooring cable are connected, the seabed data center is as the anchoring base of the float, the seabed data center is below waterline, the wind turbine and the seabed data center are electrically connected.The application can effectively reduce the construction cost of floating wind turbine and seabed data center, reduce the power cost of seabed data center, effectively improve the cooling capacity of seabed data center.
Owner:GUANGDONG HAIZHUANG OFFSHORE WIND POWER RES CENT CO LTD

Pulsar Fourier domain accelerated search assembly line parallel method and device

The invention discloses a pulsar Fourier domain accelerated search pipeline parallel method and device. The method comprises the following steps: distributing received astronomical data to a plurality of parallel processes; each process comprises three serial sub-threads, the first CPU sub-thread is used for preprocessing the distributed astronomical data, the GPU sub-thread is used for reading the preprocessed data and executing acceleration calculation on the GPU to obtain candidate signal data, the second CPU sub-thread is used for reading the candidate signal data and carrying out post-processing and result summarization, and the CPU sub-thread and the GPU sub-thread are used for executing acceleration calculation on the GPU to obtain the astronomical data. Synchronizing task states among the sub-threads by utilizing queues and queue blocking locks of a plurality of parallel process architectures; dynamically adjusting the number of processes in the processing flow through monitoring feedback; and recording a task state and a calculation result of each process in real time and processing an abnormal condition. According to the method, the pulse double-satellite search process can be effectively improved, parallel acceleration by using multiple GPUs is supported, and the speed of searching the type of celestial body from FAST astronomical data is greatly improved.
Owner:ZHEJIANG LAB

Method for starting computer system

The invention discloses a method for starting a computer system, which comprises the following steps of: a, automatically executing a pre-starting program when a power supply of the computer system is switched on; b, the pre-starting program executes operation so as to load and initialize key components of the computer in advance; c, after the pre-starting program is executed, automatically executing a main starting program for further initializing and configuring a computer system; compared with the prior art, the quick starting method has the advantages that the quick starting method is provided in the starting process of the computer system, and through the steps of optimized and automatic configuration, parallel loading and initialization, the starting efficiency of the computer system is improved, and the starting efficiency of the computer system is improved. According to the method, the starting time of the system is greatly shortened, the performance of the system and the user experience are improved, the technology can be widely applied to various computer systems and devices, and more efficient, convenient and comfortable use experience is provided for users.
Owner:GUANGZHOU RONGJIU INFORMATION TECH CO LTD

Bearing structure and pump device

The utility model provides a bearing structure and pump equipment and relates to the technical field of bearings, the bearing structure comprises a bearing and an oil inlet structure, the bearing comprises a first bearing bush and a second bearing bush which can be buckled with each other, and a shaft hole is formed after the first bearing bush and the second bearing bush are buckled with each other; the oil inlet structure comprises a wear-resisting layer arranged on the inner wall of the shaft hole and a first oil inlet groove formed in the wear-resisting layer, and the depth of the first oil inlet groove is gradually increased from the two ends to the middle in the axial direction of the shaft hole. And the depth of the first oil inlet groove is gradually reduced from top to bottom in the circumferential direction of the shaft hole. The wear-resistant layer on the inner surface of the bearing bush is scraped in a specific shape and depth, so that an optimized oil inlet structure is formed, the supply efficiency of lubricating oil is remarkably improved, the lubricating effect and stability of an oil film are enhanced, the temperature rise of the bearing during working is effectively reduced, and the service life of the bearing is prolonged. And the supporting stability of the rotor and the safety and reliability of equipment operation are ensured.
Owner:SUZHOU SULZOW PUMP IND CO LTD

A lifting installation for autoclaved aerated concrete panels

The utility model relates to the technical field of building construction, concretely is a kind of hoisting installation device for autoclaved aerated concrete slab, it includes: two support base plate, its lower end is equipped with support leg, middle part is equipped with liftable universal wheel, and top is controlled lifting by adjusting assembly;Support base plate one end connects climbing frame, the other end connects support column, and the top of both is welded with support plate and is fixed;Climbing frame one side is equipped with winch, and support plate is equipped with fixed pulley;Support base plate one side is equipped with mounting plate, and it is equipped with movable clamp plate and drive assembly thereon, and it is connected with lifting ring through nylon belt around.The device realizes flexible movement and stable positioning by liftable universal wheel, combines support leg diagonal bracing structure and clamp-nylon band clamping design, double protection anti-overturning stability and hoisting safety, effectively solve autoclaved aerated concrete slab efficient installation and high-altitude operation risk problem.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD

Power clock synchronization signal link planning method

An electric power clock synchronization signal link planning method comprises the steps that a core layer is found out in an electric power SDH transmission system topology needing to be planned, an extremely long chain is found out in the core layer, only one layer of link exists, and a first-level main clock and a first-level standby clock are arranged at the two ends of the first-level link respectively; the primary main clock and the primary standby clock inject clock signals for the first-layer link L1, and main and standby clock links are planned for each SDH node according to the direction of the first-layer link L1. According to the invention, the probability of forming a timing loop is greatly reduced, and clock link organization is carried out after the planar mesh network structure is split into link structures, so that the network complexity is reduced, and link organization is easier to carry out. And meanwhile, the core layer of the power transmission network generally has a reliable optical cable operation environment, and the clock is transmitted to the branches by preferentially depending on the core layer link in the power transmission network, so that the transmission reliability of the clock signal can be improved.
Owner:HENNAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD