This invention relates to a construction method for a
tidal power station structure, comprising the following steps: S1, installing and positioning the jacket structure using a floating crane; S2, floating the steel casing into the positioning hoist, drilling holes through the steel casing to the design elevation, and pouring
pile foundations to form a steel-concrete composite
pile structure; S3, prefabricating the foundation on land, pre-installing steel sleeves at the bottom of the foundation, and setting up a double-arm steel
cofferdam around the upper perimeter of the foundation; S4, floating the prefabricated components to the design position, and connecting the steel sleeves with the top of the steel casing; S5, inflating airbags to form a sealed water-blocking
system, and pumping out water from the double-arm steel
cofferdam to create a dry working area; S6,
cutting the portion of the top of the steel casing exceeding the
pile foundation within the dry working area, and pouring the hollow structure of the foundation; S7, dismantling the double-arm steel
cofferdam and jacket structure, and constructing the work platform; S8, hoisting the
turbine assembly platform and the work platform as a whole. This invention optimizes the construction process of a
tidal power station and improves the stability and durability of the structure.