Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

57results about How to "Avoid judgment errors" patented technology

Automatic searching and shimming method based uneven magnetic field fitting linearity

The invention discloses an automatic searching and shimming method based uneven magnetic field fitting linearity. The method includes: using a gradient echo pulse sequence to measure the uneven image of a spatial magnetic field, using the same to fit and represent the virtual spectrogram line and related performance indexes of the current magnetic field evenness; using the related performance indexes of the virtual spectrogram line as the evaluation standard for obtaining good or bad magnetic field evenness according to the multidimensional spatial vectors built by a shimming coil, performing multidimensional descending simplex method iteration search according to the evaluation standard, and returning the optimal shimming current. The method has the advantages hat during shimming, the performance indexes such as half-width and symmetry of spectrum can be fully considered; compared with the gradient shimming using gradient echo imaging, the shimming method does not need to consider measurement and fitting the shimming coil field graphs, and the shimming difficulty and limit requirements by the aid of gradient imaging are lowered; automatic fitting and searching and convergence conditions allows the method to get rid of complex manual configuration, and shimming speed and efficiency are increased.
Owner:武汉中科云楚科技有限公司

Refrigerant filling component for air conditioner and refrigerant filling method

The invention provides a refrigerant filling component for an air conditioner and a refrigerant filling method. The refrigerant filling component for the air conditioner comprises a refrigerant supply pipeline, a refrigerant storage pipeline, a controller, a pressure sensor, a liquid pipe temperature sensor and an environmental temperature sensor, a first valve is arranged on the refrigerant supply pipeline, a first end of the refrigerant supply pipeline is connected with a first storage part for supplying refrigerants, a second end of the refrigerant supply pipeline is communicated with a filling port of the air conditioner, a second valve is arranged on the refrigerant storage pipeline, a first end of the refrigerant storage pipeline is connected with a second storage part for receiving the refrigerants, a second end of the refrigerant storage pipeline is communicated with the filling port of the air conditioner, the controller is respectively electrically connected with the first valve and the second valve, the pressure sensor is connected with a liquid pipe of the air conditioner and electrically connected with the controller, the liquid pipe temperature sensor is arranged on the liquid pipe of the air conditioner and electrically connected with the controller, and the environmental temperature sensor is electrically connected with the controller. The refrigerant filling component solves the problem that the system performance of the air conditioner is reduced due to errors of manual refrigerant filling in the prior art.
Owner:珠海格力机电工程有限公司

Detecting method and device for blocked hole of dust collector and dust collector

The invention discloses a detecting method and device for a blocked hole of a dust collector and the dust collector. The detecting method comprises the following steps that current, revolving speed and control quantity of a motor are acquired, wherein the control quantity is used for adjusting the revolving speed of the motor; according to the current, the revolving speed and the control quantity,a blocked hole detecting value is calculated; according to the blocked hole detecting value, it is judged whether or not an air inlet of the dust collector is the blocked hole. According to the detecting method, dynamic parameters (the current, the revolving speed and the control quantity) during the operating process of the motor are acquired, and according to the dynamic parameters, it is judged whether or not the air inlet of the dust collector is the blocked hole. Based on the actual operating state of the dust collector, the method carries out judgement of the blocked hole, it can be avoided that errors of blocked hole judgement are caused due to human factors and fluctuation of motor parameters and controller hardware parameters during batch production, thereby improving reliabilityof blocked hole judgement, the motor can be accurately protected, and the service life of the dust collector is prolonged.
Owner:安庆桐方聚能变频电机有限公司

On-sea construction ship worker positioning management system and method

The invention relates to an on-sea construction ship worker positioning management system comprising a ship monitoring system, a worker monitoring system and a ground command system, wherein the worker monitoring system comprises a card reader and an industrial control computer that are installed on a ship, the card reader is used for reading information of labels worn by workers and sending the information read by the card reader to the industrial control computer, the industrial control computer is used for sending information read by the card reader to the ground command system, and the ship monitoring system is used for sending ship positioning data and basic ship information to the ground command system; the ground command system is used for receiving the information read by the card reader, the ship positioning data and the basic ship information so as to form on-sea construction ship worker positioning information. Via the on-sea construction ship worker positioning management system and method, convenience of management can be realized, positions and conditions of construction ships and workers can be grasped in real time, construction safety can be ensured, ship machine and worker safety can be ensured via capability of mobilizing resources at any time, and efficiency can be raised.
Owner:HUADIAN HEAVY IND CO LTD

Stainless steel corrosive agent and stainless steel grain size display method

The invention discloses a martensitic stainless steel corrosive agent used for display of the grain size of metal. The martensitic stainless steel corrosive agent is used for detecting the grain size of martensitic stainless steel. The corrosive agent comprises the specific reagents of 20ml of hydrochloric acid HCl (36%-38%), 500ml of ethyl alcohol (analytically pure), 7g of picric acid C6H2(NO2)3OH (analytically pure) and 2g of sodium dodecyl benzene sulfonate C12 H25 C6 H4 SO3Na4 (analytically pure). The invention further provides a stainless steel grain size display method in which the martensitic stainless steel corrosive agent is adopted. By the adoption of the martensitic stainless steel corrosive agent and the stainless steel grain size display method, the contrast between a grain boundary and the matrix structure of a material is increased, and the judgment errors caused by multiple martensite groups in the same grain of an austenite in the traditional detection methods can be avoided. The martensitic stainless steel corrosive agent and the stainless steel grain size display method can be widely applied to grain size detection of stainless steel forged pieces and raw materials of various machines, the accuracy of experiment results is improved, and experiment errors are lowered.
Owner:JIANGXI CHANGHE AVIATION IND

Feasibility determination method for upward mining of pillar residual mining area by loading and unloading of dynamic disturbance

The present invention discloses a feasibility determination method for upward mining of a pillar residual mining area by loading and unloading of a dynamic disturbance, and belongs to the technical field of coal mining. The feasibility determination method comprises the following steps of: firstly ascertaining a distribution location of the pillar residual mining area and the residual coal seam, obtaining a composition, a structure, physical and mechanical parameters of the interlayer rock stratum, and uniformly dividing and numbering the interlayer rock stratum from bottom to top; then determining the location of a control rock stratum, respectively calculating the magnitude of the disturbance load acting on the residual coal pillars and the control rock layers in the pillar residual mining area by a bearing pressure after propagation attenuation; finally analyzing the stability of the residual coal pillars and the control rock layers in the pillar residual mining area in consider ofthe effects of loading and unloading of the dynamic disturbance, figuring out the result of the feasibility determination for upward mining of pillar residual mining area. According to the feasibilitydetermination method for upward mining of the pillar residual mining area by loading and unloading of the dynamic disturbance, the situation that errors of empirical method are large is avoided, a theoretical basis for safety upward mining of the residual coal in the pillar residual mining area is provided, the recovery rate of the upper coal resource in the pillar residual mining area is improved, and the service life of a mine is effectively increased.
Owner:TAIYUAN UNIV OF TECH

Online monitoring method for grounding resistance of transmission line tower

ActiveCN109100572AEffectively judge the operation of grounding resistanceEffectively judge the operation statusEarth resistance measurementsTransmission towerElectrical resistance and conductance
The invention provides an online monitoring method for a grounding resistance of a transmission line tower, which is realized by a transmission line monitoring device, a lightning positioning system and a grounding resistance online monitoring system, and specifically comprises the following steps: S1, determining whether a lightning strike failure occurs; S2, calculating a total amount of chargeof the lightning strike current when the lightning strike failure occurs; S3, separately calculating the amount of leakage current charge in four directions; S4, calculating the amount of leakage current charge entering the ground in the direction of the tower; and S5, calculating a proportional coefficient between the amount of charge transmitted by the lightning strike current in the direction of the tower and the total amount of charge of the lightning current, and determining whether the grounding resistance meets the grid standard. According to the online monitoring method for the grounding resistance of the transmission line tower, the grounding resistance of the transmission tower hit by each lightning current can be monitored in real time, the judgment error caused by the change ofthe historical grounding resistance of the tower due to factors such as insulation degradation can be avoided, and a real time comprehensive monitoring of the grounding resistance of the transmissionline can be realized.
Owner:HAINAN POWER GRID CO LTD ELECTRIC POWER RES INST

Method for establishing simulation error evaluation index based on trajectory characteristics

The invention belongs to the technical field of power system numerical simulation model parameter correction, and particularly relates to a method for establishing a simulation error evaluation indexbased on trajectory characteristics, in particular to a method for establishing a simulation credibility index system based on trajectory characteristics. The method comprises the following steps: injecting measured data into a simulation system by adopting a hybrid dynamic simulation method of impact load injection; calculating the track sensitivity of the simulation track to each parameter, andselecting a to-be-corrected parameter set with relatively high track sensitivity; performing hybrid dynamic simulation by using the corrected parameter group, and calculating simulation error indexesbefore and after correction, the simulation error indexes including a voltage error index and a power error index; comparing the error indexes before and after correction, and if the error value aftercorrection is smaller than the error value before correction, adopting the corrected parameters for simulation. According to the method, judgment errors caused by qualitative analysis are effectivelyavoided, the difference degree between simulation and actual measurement is reduced, and the simulation credibility is improved.
Owner:STATE GRID LIAONING ELECTRIC POWER RES INST +2

Feasibility determination method for upward mining of pillar residual mining area in static disturbance loading

The present invention discloses a feasibility determination method for upward mining of a pillar residual mining area in a static disturbance loading, and belongs to the technical field of coal mining. The feasibility determination method comprises the following steps of: firstly ascertaining the distribution locations of the pillar residual mining area and the residual coal seam, obtaining the composition, the structure, and physical and mechanical parameters of an interlayer rock stratum, and uniformly dividing and numbering the interlayer rock stratum from bottom to top; then determining the location of a control rock stratum, respectively calculating the magnitude of the disturbance load acting on the residual coal pillars and the control rock layer in the pillar residual mining area of a bearing pressure after propagation attenuation; and finally analyzing the stability of the residual coal pillars and the control rock layer in the pillar residual mining area in consideration of the effects of the static disturbance loading, figuring out the result of the feasibility determination for upward mining of pillar residual mining area. According to the feasibility determination method for upward mining of the pillar residual mining area in the static disturbance loading, the situation that errors of an empirical method are large is avoided, a theoretical basis for safety upwardmining of the residual coal in the pillar residual mining area is provided, the recovery rate of the upper coal resource in the pillar residual mining area is improved, and the service life of a mineis effectively increased.
Owner:TAIYUAN UNIV OF TECH

Tower column inclination judgment method based on intelligent robot

ActiveCN110986860AAvoid judgment errorsThe judgment method is accurate and reliableIncline measurementRemote controlSkew angle
The invention provides a tower column inclination judgment method based on an intelligent robot. The method comprises: using an intelligent robot and a remote control platform, establishing a Cartesian coordinate system, setting pier column measuring point layout parameters by equally dividing the pier height and the section perimeter; when the intelligent robot sequentially moves upwards along the pier to the height of the inclination measuring section, the remote control platform obtaining coordinates of interpolation points of the cross section through a Cartesian space method to control the horizontal movement of the cross section of the intelligent robot; calculating the coordinates of each section center point according to the three-dimensional coordinates of the section measuring points, fitting each section center point by taking the theoretical center line of the pier stud as an optimal fitting target to obtain the most probable value of the pier center point, further calculating to obtain the inclination angle and inclination of the pier, and judging whether the inclination of the pier stud exceeds the limit or not by combining an inclination threshold value. The method has the advantages that compared with a traditional method, the provided inclination judgment method reflects the inclination of the tower column more accurately, and a more reliable judgment basis isprovided for judgment of the construction quality and the operation health condition of the tower column.
Owner:WUHAN UNIV

A monitoring method and system for a person consciousness loss monitoring recognizer

The invention discloses a monitoring method for a person consciousness loss monitoring recognizer. The method includes the following steps: receiving acceleration data information detected by an acceleration sensor; determining whether the acceleration data information exceeds the preset threshold, and if the acceleration data information exceeds the preset threshold, determining that the state isabnormal; if the acceleration data information does not exceed the preset threshold, determining that the state is normal, wherein the preset threshold is more than or equal to 9.8 m/s; receiving vibration data information detected by a vibration sensor; determining whether there is output of vibration data information; if there is there is output of vibration data information, determining that aperson does not lose consciousness; if there is not output of vibration data information, determining that a person loses consciousness. The invention also discloses a monitoring system for a personconsciousness loss monitoring recognizer. The system includes an acceleration data determination module and a vibration data determination module. The gravitational acceleration and vibration are utilized to collect real-time data, whether a person falls down or loses consciousness is determined by a device embedded algorithm module, the monitoring mode is simple and direct, the determination canbe performed rapidly and accurately, the wrong judgment is avoided, and the monitoring efficiency is improved.
Owner:四川明上科技有限公司

Intelligent visual green brick marshalling arrangement device

The invention relates to an intelligent visual green brick marshalling arrangement device which comprises a workbench. A conveying belt is arranged on the upper surface of the workbench in the lengthdirection of the workbench. A green brick storage workbench which is flush with the upper surface of the workbench is fixedly arranged at the front side of the feeding end of the workbench. A green brick grabbing movement device used for grabbing green bricks put onto the workbench and the green brick storage workbench is movably arranged over the workbench and the green brick storage workbench. The workbench and the green brick storage workbench are provided with a plurality of cameras used for shooting the green bricks conveyed on the workbench. The cameras and the green brick grabbing movement device are connected with a controller. The structural design is reasonable and novel, automatic equipment takes the place of manual work to replace unqualified green bricks in production of an assembly line, the working efficiency of replacing the unqualified green bricks is effectively improved, green brick replacement is made more qualified and accurate, and judgment errors caused by judging whether the green bricks are qualified or not depending on the subjective judgment and proficiency of workers are avoided.
Owner:JINAN JINNIU BRICKMAKING MACHINERY

Refrigerant filling assembly and refrigerant filling method for air conditioner

The present invention provides a refrigerant filling assembly for an air conditioner and a refrigerant filling method, wherein the refrigerant filling assembly for an air conditioner includes: a refrigerant supply pipeline, a first valve is arranged on the refrigerant supply pipeline, and the refrigerant supply pipeline The first end is connected with a first storage component for supplying refrigerant, and the second end communicates with the filling port of the air conditioner; the refrigerant storage pipeline is provided with a second valve, and the first end of the refrigerant storage pipeline is connected to There is a second storage part for receiving refrigerant, the second end communicates with the filling port of the air conditioner; the controller is electrically connected with the first valve and the second valve respectively; the pressure sensor is connected with the liquid pipe of the air conditioner and It is electrically connected with the controller; the liquid pipe temperature sensor is arranged on the liquid pipe of the air conditioner and electrically connected with the controller; the ambient temperature sensor is electrically connected with the controller. The invention solves the problem in the prior art that the performance of the air conditioner system is degraded due to errors caused by artificially pouring refrigerant.
Owner:珠海格力机电工程有限公司

Stand mixer capable of detecting bread dough kneading state

The invention discloses a stand mixer capable of detecting a bread dough kneading state. The stand mixer capable of detecting the bread dough kneading state comprises a frame, a stirring device and a dough kneading basin; the stirring device comprises a fixed flat plate for a rotating mechanism; a stirring part, a pressing part and a core part, which are respectively controlled by cylinders, are coaxially arranged on the fixed flat plate from outside to inside; the dough kneading basin is divided into a working layer and a bottom layer by a partition plate arranged in the dough kneading basin; a circular hole is formed in the middle of the partition plate; an ejecting mechanism is arranged in the bottom layer; one end of the ejecting mechanism is connected with the cylinder fixedly arranged at the bottom of the dough kneading basin; the circular arc end surface of the other end of the ejecting mechanism is embedded in the circular hole; the arc end surface is aligned with the cylinder at the bottom of the dough kneading basin. The stand mixer disclosed by the invention has the advantages that the automatic detection can be realized; the efficiency is enhanced; dough with a certain hardness is obtained within a short time; judging error caused by the technical level of an inspector is effectively avoided, so as to avoid product making failure caused by excessive stirring; the success rate is increased; the making cost is effectively reduced.
Owner:食安天下(广东)食品检测技术有限公司

An automatic search shimming method based on line shape fitting of inhomogeneous magnetic field

The invention discloses an automatic searching and shimming method based uneven magnetic field fitting linearity. The method includes: using a gradient echo pulse sequence to measure the uneven image of a spatial magnetic field, using the same to fit and represent the virtual spectrogram line and related performance indexes of the current magnetic field evenness; using the related performance indexes of the virtual spectrogram line as the evaluation standard for obtaining good or bad magnetic field evenness according to the multidimensional spatial vectors built by a shimming coil, performing multidimensional descending simplex method iteration search according to the evaluation standard, and returning the optimal shimming current. The method has the advantages hat during shimming, the performance indexes such as half-width and symmetry of spectrum can be fully considered; compared with the gradient shimming using gradient echo imaging, the shimming method does not need to consider measurement and fitting the shimming coil field graphs, and the shimming difficulty and limit requirements by the aid of gradient imaging are lowered; automatic fitting and searching and convergence conditions allows the method to get rid of complex manual configuration, and shimming speed and efficiency are increased.
Owner:武汉中科云楚科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products