The invention discloses a construction method for milling a
cement soil stirring wall waterproof curtain through double wheels. The construction method is characterized by comprising the following steps that firstly, surveying and setting out are conducted for positioning; secondly, a trench is excavated; thirdly, a double-wheel
pile milling
machine is arranged in place, a positioning red line is pulled to the construction side of the excavated trench, a framing point is set according to a surveying and setting-out result and marked, and the double-wheel
pile milling
machine is arranged in place; fourthly, at each frame of
station, the double-wheel
pile milling
machine is used, a cutter head conducts
cutting and digging and sinks to the target depth, meanwhile,
cement grout is injected in a jetting manner, and the
cement grout is injected in the jetting manner and stirred while the cutter head is elevated; and fifthly, after one frame of wall is constructed, the double-wheel pile milling machine is moved to the next position, the fourth step is repeated, and the next frame of wall is constructed till construction of the waterproof curtain is finished. According to the construction method, connectors are few, the
water leakage risk caused by construction of cold joints can be completely avoided, and the construction efficiency is high. In the construction process, vibration is avoided, and safety performance is good. Replacement soil is little, environment friendliness is achieved, and outward transporting of
slurry is reduced.