Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

16results about How to "Unreasonable solution" patented technology

LED display screen field correction method and related device

ActiveCN119400100ASolve the shortened service lifeachieve efficient reuseStatic indicating devicesTesting optical propertiesLED displayReliability engineering
The invention discloses an LED display screen field correction method and a related device, and relates to the technical field of display, and the method comprises the steps: carrying out the preliminary detection of a plurality of LED units, and recording the initial display parameters of the plurality of LED units; determining a target display parameter of the whole screen; adjusting and calculating the plurality of LED units to obtain a parameter adjusting scheme of the plurality of LED units; collecting life cycle data of the plurality of LED units and analyzing the life cycle data, and respectively determining predicted residual life of the plurality of LED units under the parameter adjustment scheme; screening out a plurality of target LED units of which the predicted residual life is within a preset durability range; and performing point-by-point correction on the target LED unit based on the parameter adjustment scheme. By implementing the method, residual life prediction and accurate correction are performed on different batches of LED units, so that reasonable utilization of the tail LEDs is realized, a display screen shows better performance uniformity and longer service life, and user experience is improved.
Owner:SHENZHEN RUILING OPTOELECTRONICS CO LTD

A method and system for reducing the PUE value of an intelligent computing center

The present invention discloses a method and system for reducing the PUE value of an intelligent computing center, which is used to reduce the PUE value of an intelligent computing center. The intelligent computing center includes multiple computer rooms for arranging servers, and multiple server arrangement areas arranged side by side are arranged in the computer rooms. The servers are distributed in the server arrangement areas. The method includes: obtaining a target server in a low-load operation state from the server, and determining the server arrangement area to which the target server belongs; sorting the computing task migration priority of the server arrangement area according to the number of target servers in the server arrangement area to determine the computing task migration priority of the server arrangement area; obtaining several computing tasks outside the intelligent computing center, and migrating the computing tasks to the target servers in the current server arrangement area according to the computing task migration priority, until all the target servers in the current server arrangement area are in a full-load operation state. The present invention solves the problem of unreasonable computing task allocation in the prior art when reducing the PUE value.
Owner:SHANGRAO GAOTOU ZHICHENG TECH CO LTD

Servo motor control method and system, electronic device and storage medium

The invention relates to a servo motor control method and system, an electronic device and a storage medium. The current running speed of a servo motor is obtained; determining a speed error between the current running speed and the target speed; judging whether the speed error is in a motion precision interval or not and whether the duration of the speed error in the motion precision interval is not less than the window time or not; generating a motion signal when the speed error is in the motion precision interval and the duration time is not less than the window time; the problem that a servo motor control method is unreasonable in the prior art is solved.
Owner:SHANGHAI UNITED IMAGING HEALTHCARE

A Method for Calculating Short-Circuit Current in Wind-Solar-Storage Power Stations Based on Pseudo-Current Source Method and Equivalent Approximation

This invention discloses a method for calculating short-circuit current in wind-solar-storage power stations based on the pseudo-current source method and equivalent approximation, comprising the following steps: Step S1, selecting a reference value; Step S2, inputting electrical parameters; Step S3, calculating network parameters; Step S4, calculating the short-circuit current provided by wind, solar, and energy storage power sources and the system based on the pseudo-current source method and equivalent approximation; Step S5, calculating the short-circuit current at each short-circuit point using the infinity calculation method. The short-circuit current calculation method for wind-solar-storage power stations proposed in this invention is suitable for equivalent calculation models under the special output conditions of wind power, photovoltaic, and energy storage power sources. It enables rapid and effective calculation of short-circuit currents at various voltage levels of busbars in wind farms, photovoltaic, energy storage, or combined wind-solar-storage power stations, demonstrating fast and efficient calculation and high application value.
Owner:POWERCHINA HEBEI ELECTRIC POWER SURVEY & DESIGN INST CO LTD

Method and device for adjusting building structure chart based on evacuation line

The invention relates to the technical field of buildings, and provides a method and device for adjusting a building structure chart based on an evacuation line. The method comprises the following steps: determining all emergency exits of a target building on a structure chart; dividing the target building into a plurality of areas on the structure chart according to the emergency exits; according to the emergency exits corresponding to all the areas, the farthest evacuation points in all the areas are determined on the structure chart according to evacuation channel design rules; based on the emergency exit corresponding to each area and the farthest evacuation point in the area, generating an evacuation line of each area on the structure chart, and calculating the length of the evacuation line of each area; determining a preset length corresponding to an evacuation channel in the target building according to the building category of the target building; and adjusting the structure chart based on the length of the evacuation line of each region and a preset length. By means of the technical means, the problem that in the prior art, the design of the evacuation line and the design of the building structure chart are not closely connected together, and consequently the designed building structure chart is unreasonable is solved.
Owner:CHENGDU XUMI YUNTU ARCHITECTURAL DESIGN CO LTD

A game scene management method, system, device and medium

ActiveCN119015704Bunreasonable solutionavoid embarrassing situationsProgram controlVideo games
The present application relates to a game scene management method, system, device and medium, wherein the method includes: creating a game scene of a preset game for a logged-in player character to enter; in the case where the preset game has at least two game scenes, detecting the number of player characters in each game scene to obtain a game scene to be merged in which the number of player characters is less than a scene merging number threshold; merging the game scenes based on the game scenes to be merged, if the number of player characters in the merged game scene is less than a scene splitting number threshold, directly obtaining the merged game scene, if it is greater than the scene splitting number threshold, then splitting and merging the game scenes based on the game scenes to be merged. Through the present application, the merging of game scenes is realized, effectively avoiding the embarrassing situation of having few people in each game scene after the merger, and the splitting and merging can also effectively reduce the pressure of a single scene, solving the unreasonable problems existing in the existing game scene management strategy.
Owner:HANGZHOU ELECTRONICS SOUL NETWORK TECH

Unmanned aerial vehicle lifting holder

PendingCN121990199AOptimize delivery pathunreasonable solutionNon-rotating vibration suppressionGearingUncrewed vehicleStructural engineering
The invention belongs to the technical field of unmanned aerial vehicles, and particularly relates to an unmanned aerial vehicle lifting holder which is characterized in that when the height of a photoelectric pod needs to be adjusted, a driving assembly drives a plurality of lead screws to rotate synchronously, a nut moves linearly along with the lead screws, and a whole damping mechanism and the photoelectric pod are driven to lift stably through a damper fixing plate; a plurality of damping elements arranged between the damper fixing plate and the pod base can effectively buffer vibration from all directions; through cooperative work of the star-shaped connecting plate and the lifting assembly, a transmission and supporting structure is optimized, the stability of the lifting process is ensured, and the problem that a transmission structure of a traditional device is unreasonable is solved; the damping element is arranged below the bearing platform, the transmission path of vibration energy is optimized, and the damping effect is improved; the hollow structure on the outer frame of the cradle head reduces the overall weight on the premise of ensuring the structural strength, and overcomes the problem that the traditional cradle head is heavy, so that the unification of light weight, high stability and excellent damping performance is realized.
Owner:JILIN TEACHERS INST OF ENG & TECH

Automatic production equipment for transportation container

The utility model discloses automatic production equipment for a transportation container, which comprises a lead smoke purification system, a lead melting system, a lead filling system and a control assembly, the lead melting system is arranged between the lead smoke purification system and the lead filling system, one end of the lead melting system is connected with the lead smoke purification system, and the other end of the lead melting system is connected with the transportation container. The lead filling system is arranged at the top of the transportation container, and the lead smoke purification system, the lead melting system and the lead filling system are electrically connected with the control assembly.
Owner:XIAN NUCLEAR EQUIP CO LTD +1

Game scene management method, system and device and medium

ActiveCN119015704Aunreasonable solutionavoid embarrassing situationsProgram controlVideo gamesComputer graphics (images)Engineering
The invention relates to a game scene management method, system and device and a medium, and the method comprises the steps: creating a game scene of a preset game for a logged player character to enter; under the condition that at least two game scenes exist in the preset game, the number of player roles in each game scene is detected, and a to-be-merged game scene with the player role number smaller than a scene merging number threshold value is obtained; and merging the game scenes based on the to-be-merged game scenes, if the number of player roles in the merged game scenes is smaller than a scene splitting number threshold value, directly obtaining the merged game scenes, and if the number of player roles in the merged game scenes is larger than the scene splitting number threshold value, splitting and merging the game scenes based on the to-be-merged game scenes. Through the method and the device, the game scenes are merged, the embarrassing situation that few people appear in each merged game scene is effectively avoided, the pressure of a single scene can be effectively reduced through splitting and merging, and the unreasonable problem existing in an existing game scene management strategy is solved.
Owner:HANGZHOU ELECTRONICS SOUL NETWORK TECH

Point cloud clustering method, apparatus, device, and medium

ActiveCN116664896Bunreasonable solutionSolve the problem of unreasonable clusteringWave based measurement systemsHigh level techniquesPoint cloudHigh density
Embodiments of the present application disclose a point cloud clustering method, device, equipment and medium. The method comprises: determining a target point cloud cluster according to point cloud quantity information and cluster minimum enclosing circle information in a candidate point cloud cluster; the candidate point cloud cluster is obtained by preliminary clustering of to-be-clustered point cloud data; determining a candidate single-target minimum enclosing circle in the target point cloud cluster according to a single-target minimum enclosing circle radius of a detection target; determining a candidate single-target minimum enclosing circle matching position from a traversal process of the candidate single-target minimum enclosing circle in a cluster minimum enclosing circle of the target point cloud cluster according to a single-target point cloud quantity threshold of the detection target; determining a final single-target minimum enclosing circle matching position according to point cloud density in the candidate single-target minimum enclosing circle matching position, and determining a final clustering result of the target point cloud cluster according to the final single-target minimum enclosing circle matching position. The technical solution can effectively solve the problem of unreasonable high-density point cloud clustering.
Owner:ZHEJIANG UNIVIEW TECH CO LTD

Spike detection method based on 3D residual network and spatial clustering prior

The present invention discloses a spike wave detection method based on 3D residual network and spatial clustering prior, which relates to the field of artificial intelligence technology and comprises the following steps: preprocessing magnetoencephalogram data of epileptic patients during the interictal period collected by multiple sensors, rearranging and temporally dividing the preprocessed magnetoencephalogram data according to the physical position relationship of sensors of magnetoencephalogram collection equipment, and obtaining reorganized magnetoencephalogram data; inputting the reorganized magnetoencephalogram data into a trained 3D residual network model to output a predicted label of whether there is a spike wave in each data slice in the reorganized magnetoencephalogram data; for the fragments whose predicted labels show the existence of spike waves, filtering the spike wave position time points according to the signal amplitude, and finally obtaining a predicted spike wave time point sequence corresponding to the magnetoencephalogram data; the spike wave detection method improves the accuracy, precision and recall of spike wave detection.
Owner:ARTIFICIAL INTELLIGENCE RES INST OF HEFEI COMPREHENSIVE NAT SCI CENT (ANHUI ARTIFICIAL INTELLIGENCE LAB)

Curved surface processing method and device of material, electronic equipment and storage medium

The embodiment of the invention discloses a material curved surface processing method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining the plane contour information of a to-be-processed material; wherein the plane contour information of the to-be-processed material comprises a bending starting position curvature radius value, a bending ending position curvature radius value and a ripple height value of the to-be-processed material; determining a target bending corrugation curve according to the curvature radius value of the bending starting position, the curvature radius value of the bending ending position and the corrugation height value; and generating a target corrugated curved surface of the to-be-processed material according to the target bending corrugated curve. According to the technical scheme, the reasonability of the corrugated curved surface design can be improved, and the material with the corrugated curved surface characteristic can be completely and tightly attached to the mold.
Owner:SHANGHAI AIRCRAFT MFG

Hand exoskeleton and robotic teleoperation system

ActiveCN121649963BFlexible adjustment of postureavoid wearing discomfortProgramme-controlled manipulatorHand partsControl engineering
The application discloses a hand exoskeleton and a robot teleoperation system, and the finger mechanism of the hand exoskeleton is arranged on a palm fixing base; the thumb mechanism comprises a knuckle assembly and a connecting rod assembly, the knuckle assembly is rotationally connected with the palm fixing base, the connecting rod assembly comprises a first connecting rod and a second connecting rod, one end of the first connecting rod is rotationally connected with the palm fixing base, the other end of the first connecting rod is connected with one end of the second connecting rod, and the other end of the second connecting rod is rotationally connected with the knuckle assembly. The knuckle assembly of the application is rotationally connected with the palm fixing base, and the connecting rod assembly formed by matching the first connecting rod and the second connecting rod effectively solves the problem that the connection mode of the existing thumb mechanism is unreasonable, so that the posture of the thumb can be flexibly adjusted according to the natural physiological structure of the hand during the movement process, the wearing is comfortable, the movement track is highly matched with the physiological track of the human hand through the cooperation of the multiple connecting rods, the additional burden of the joint is reduced, and secondary injury is prevented.
Owner:ZHEJIANG BRAIN ENHANCE TECH CO LTD

Parameter design method and device for double-core symmetrical controllable phase shifter

PendingCN121864053Aunreasonable solutionConsistent design goalsPhase shifting networksAc network circuit arrangementsSystems designElectric power system
The invention provides a parameter design method and device for a double-core symmetrical controllable phase shifter, and relates to the technical field of power grids. According to the method, firstly, key performance indexes such as a phase shifting angle, rated capacity, rated voltage, rated current and a short-circuit impedance range of the controllable phase shifter are determined based on system design requirements and constraint conditions, then accurate calculation is carried out according to the key performance indexes, the rated transformation ratio of a series transformer and a parallel transformer of the controllable phase shifter is determined, and the controllable phase shifter is obtained. The core component parameters such as the rated voltage, the rated current and the rated capacity of each winding are obtained, and the layered parameter design thought of first integration and then component is achieved; the overall performance index of the phase shifter is determined from the global demand of the power system, it is ensured that the design target is highly consistent with the system demand, the problem of disjunction with the overall operation condition possibly caused by direct component design is avoided, the overall performance optimization can be achieved, and the problem that a traditional parameter design method of the controllable phase shifter is unreasonable is solved.
Owner:STATE GRID HEBEI ELECTRIC POWER RES INST +1