The invention discloses a replacing process of a wind tower foundation ring upper flange. The process comprises the following steps that an original flange is cut; a temperature-resistance material isused for protection, after a mark line is made, a cutting trolley pre-walks by one circle, height consistency is kept, cutting is carried out, and after cutting, the diameter of a ring is measured; an original foundation ring is grooved; a modified magnetic cutting trolley pre-walks by one circle, height consistency is kept, a cylinder wall center line is drawn, a groove angle is checked, and theupper surface levelness is checked; a new flange is assembled; and the diameter of the new flange is measured, the new flange diameter obtained through measuring is compared with and matched with thering diameter obtained through measuring, new flange lifting and assembly are carried out, and the levelness of the new flange is checked. Renovation of a whole foundation ring base can be achieved,the service deadline of the foundation ring base can be prolonged, the whole service period cost of a wind generating set can be reduced, incomes are improved, and the influence on the safety and theenvironment can be reduced.