The application discloses a long-distance
cascade gate pump
water transfer project layered optimization scheduling method, according to the large
system decomposition coordination principle, the large-scale
cascade gate pump group is spatially layered, the
global optimization of the
cascade pump
station and the local optimization of the partition series gate
station are carried out, and the layered optimization scheduling model is constructed according to the time and space scales of each level, the
water supply safety of the whole line and the local is ensured, the
water supply demand response efficiency is improved, the difficulty of optimization calculation and the requirement for computing power are reduced, the scheduling working condition requirements such as the water filling stage, the
water source adjustment, the water distribution change, the
water stop stage and
emergency response in the actual operation of the long-distance cascade gate pump
water transfer project are met, the
optimal scheduling scheme of the whole line is generated, and the rolling scheduling decision support according to the real-time
monitoring data is realized. The application has the advantages of general structure, strong universality, easy customization, effectively solves the shortage that the traditional scheduling method cannot quickly respond to various
water supply working condition requirements.