Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

43results about How to "Increase electricity sales" patented technology

Universal spiral compaction type grounding wire operating rod

PendingCN107275906ASolve the problem of difficult installation of ground wires at different anglesSolve installation difficultiesClip conductor connectionWire wrapping connectorsUniversal jointEngineering
The invention discloses a universal screw compression type grounding wire operating rod. The technical solution of the present invention is: including the wire clip assembly, the adjustment assembly, the operating rod assembly and the transmission handle assembly connected in sequence, the wire clip is provided with a screw connected with the universal joint and a screw compression bolt connected with the steel wire transmission flexible shaft The chuck, the adjustment assembly includes a support tube, which is used to fix the universal joint and the steel wire transmission flexible shaft, and is also provided with a plug-in joint and a limit stop nail for connecting the insulating operating rod. The operating rod assembly includes an insulating operating rod and an insulating operating rod. An insulated transmission rod inside the operation rod is connected with the steel wire transmission flexible shaft and the chuck of the transmission handle, and the transmission handle assembly is provided with a threaded connector for connecting the operation rod. The solution provided by the invention allows the wire clip to be adjusted at any angle at 360 degrees in the horizontal direction and about 120 degrees in the vertical direction, and the number of operating rods is reduced by the way of component connection, which facilitates the exchange of different types of wire clips and reduces the cost.
Owner:谭加新

Lifting type rail insulation operation platform

The invention discloses a lifting type rail insulation operation platform which comprises a mobile device and an insulation platform body that is provided with a rail, wherein the mobile device comprises an up-down lifting device, a left-right moving device and an insulation platform bracket; the up-down lifting device comprises a guide rail, a worm and gear device, a pulley block, a lifting rope and a lifting limiter; the worm and gear device is arranged at the bottom end of the guide rail; the pulley block comprises guide rail pulleys fixed on the insulation platform bracket and used for clamping the guide rail and a lifting pulley penetrating and guiding the lifting rope; one end of the lifting limiter is fixed on the insulation platform bracket, the other end of the lifting limiter is matched and fixed with the guide rail; the insulation platform bracket is arranged in front of the guide rail and is fixed with the insulation platform body, the insulation platform bracket moves up and down along the guide rail through the guide rail pulleys arranged at the upper end and the lower end of the bracket; and the left-right moving device comprises a support pulley, two pulley chains and a metal fixing chain. According to the invention, up-down and left-right regulations of an operation position can be carried out, thus the safety of a hot line work is improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +2

Insulator sweeping device

InactiveCN110314870ALabor savingImprove cleaning and decontamination work efficiencyCleaning using toolsApparatus for overhead lines/cablesEngineeringMagnet
The invention discloses an insulator sweeping device. The insulator sweeping device comprises a first sweeping and dirt removing mechanism and a second sweeping and dirt removing mechanism which are symmetrically arranged, the first sweeping and dirt removing mechanism and the second sweeping and dirt removing mechanism comprise approximate arc-shaped sweeping and dirt removing machine frames, atleast one pair of arc-shaped connecting arms are arranged on each of the two sides of each sweeping and dirt removing machine frame in an extending mode, a permanent magnet attracting disc is arrangedat a free end of each arc-shaped connecting arm of the first sweeping and dirt removing mechanism, a plurality of travelling devices are arranged on the inner walls of the sweeping and dirt removingmachine frames, the inner walls of the sweeping and dirt removing machine frames are also provided with arc-shaped gear rings and gear ring driving mechanisms for driving the arc-shaped gear rings torotate in a reciprocating mode, and sweeping devices are arranged on the inner walls of the arc-shaped gear rings. According to the insulator sweeping device, sweeping and dirt removing procedures such as up-down travelling and sweeping can be safely and efficiently and automatically completed, high-altitude manual sweeping is replaced, the working safety is improved, the travelling devices and the sweeping devices can be adapted to insulator pieces with different diameters, and the adjusting mode is simple and convenient.
Owner:郑杰

Protective device defect eliminating coordination instrument without circuit power outage

The invention discloses a protective device defect eliminating coordination instrument without circuit power outage, and belongs to the technical field of circuit protective devices. The protective device defect eliminating coordination instrument without the circuit power outage at least comprises a protective device replacing unit, a detection unit, a control unit and a state indicating unit, wherein the protective device replacing unit is used for replacing an abnormal protective device appears in a circuit, the detection unit is used for detecting the replacement protective device unit or the repaired abnormal protection device to ensure normal working, reliable action and correct indicating, and transmitting the current checking states to the state indicating unit, the control unit is used for sending out detection control instructions, and controlling the working state of the detection unit, and the state indicating unit is used for displaying current working operation states. The protective device defect eliminating coordination instrument without circuit power outage solves the problems that previously, an operation switch and the circuit have to be powered off so that the failure of the protective device can be handled, power supply reliability is influenced, and potential hazards of accidents are laid for the safety operation of equipment. The protective device defect eliminating coordination instrument without circuit power outage has the advantages of being simple in structure, convenient to use, high in efficiency and capable of improving power sale quantity and circuit reliability.
Owner:STATE GRID CORP OF CHINA +2

Quick-repairing method for urban power distribution room

The invention provides a quick-repairing method for an urban power distribution room. The quick repairing method can solve the problems that during power distribution room repairing, the blackout time is long, cost is high and efficiency is low, and can guarantee normal power supply for residents. The quick-repairing method comprises the following steps that firstly, a set of high-voltage reserved interfaces are additionally arranged at the second 10kV wire inlet end of the power distribution room, and a first low-voltage reserved interface and a second low-voltage reserved interface are additionally arranged on a 0.4kVI section bus and a 0.4kVII section bus of the power distribution room respectively; secondly, a box transformer substation vehicle arrives at the site, a bypass circuit cable of the box transformer substation vehicle is unfolded; thirdly, a superior switch at the second10kV wire inlet end is turned off, a wire inlet cable of a second high-voltage switch and a ring main unit are disconnected, and protection is carried out; fourthly, working is carried out according to the sudden failures of the ring main unit or the routine repairing of the ring main unit or failures of any transformer. The quick-repairing method is suitable for the power distribution room, and also suitable for fast repairing of network distribution box type transformers, column transformers, switching stations and other network distribution devices.
Owner:JIANGSU ELECTRIC POWER COMPANY YANGZHOU POWER +3

Lightning arrester device capable of being dismounted and installed in charged state

The invention provides a lightning arrester device capable of being dismounted and installed in a charged state. The lightning arrester device capable of being dismounted and installed in a charged state is composed of an insulation support body, a charged part assembly, a detachable assembly, a grounding assembly, a grounding support body, a base and a support strap iron body. The charged part assembly is composed of a fixed contact movable cover and a power source binding post, and the charged part assembly is fixedly connected with the insulation support body as a whole through a bolt. The detachable assembly is composed of a charged end moving contact, an operating ring, a lightning arrester, a grounding end moving contact and a rotating shaft. The grounding assembly is composed of a grounding end fixed contact, a support groove and a bolt hole formed in the support groove, and the grounding support body and a grounding end assembly are fixedly connected as a whole through bolts. The insulation support body and the grounding support body are respectively fixed at two ends of the base through bolts to form the whole lightning arrester device capable of being dismounted and installed in a charged state. The base is fixed on a pole cross arm through the support strap iron body. According to the lightning arrester device capable of being charged in dismounting, workers can securely dismount and install the lightning arrester on the ground under the premise that power (a power grid) is not cut. Therefore, reliability of power supply is improved, and practicability is strong.
Owner:冯长富

Lightning arrester discharge counter live replacement device and using method for the same

The invention discloses a lightning arrester discharge counter live replacement device and a using method for the same. The lightning arrester discharge counter live replacement device comprises insulation operation rods, insulation rotation screws, copper line clamp lower surfaces, copper line clamp adjustment surfaces, copper line clamp upper surfaces, copper line clamp adjustment surface upgoing guide grooves, a short circuit line, copper connection noses, short circuit line fixing bolts, insulation top caps, insulation inner threads and screw thread fixing pins. The lightning arrester discharge counter live replacement device and the using method for the same eliminate long time waiting for an approval process for cutting (recovering) power and safety hazards in processes of cutting (recovering) power and arranging safety measures by personnel. The lightning arrester discharge counter live replacement device is small in size, easy in operation and easy to carry, and greatly shortens effective time of working, greatly reduces number of personnel participating in work, timely eliminates flaws in the discharge counter, recovers effective monitoring on the lightening arrester, and creates a condition for safety operation of a power grid. The replacement without power cutting improves reliability of supplying power and the power sale quantity, and creates economic benefits.
Owner:KUNMING UNIV OF SCI & TECH

Electric heating current-limiting intelligent control system and valley-shifting and peak-filling heat supply method thereof

PendingCN113324279ASpeed ​​upSolve the problem of not being able to develop rapidlyLighting and heating apparatusElectric heating systemElectric power equipmentPower equipment
The invention discloses an electric heating current-limiting intelligent control system and a valley-shifting and peak-filling heat supply method thereof, and belongs to the technical field of electric heating. The electric heating current-limiting intelligent control system comprises a data base station, an Internet of Things cloud platform, a power line carrier repeater, a transformer area current acquisition protection device, a user current limiter and an electric heating temperature control terminal. According to the electric heating current-limiting intelligent control system and the valley-shifting and peak-filling heat supply method thereof, the problem that clean electric heating cannot be rapidly developed due to the limitation of the capacity of power equipment is effectively solved, current-limiting control intelligent management is carried out by using the electric heating current-limiting intelligent control system, after 50% of electricity consumption power of an electric heating building is reduced, a user can be connected into a power distribution network in a capacity-increasing-free or small-capacity-increasing mode, large-scale popularization of electric heating is facilitated, and the progress of the project of replacing scattered coal with clean electric energy in China is accelerated; and the problem that a user cannot access due to the capacity restriction of power equipment is effectively solved.
Owner:CHANGCHUN POWER SUPPLY COMPANY OF STATE GRID JILINSHENG ELECTRIC POWER SUPPLY +1

Transformer substation secondary circuit drawing storage and quick consulting method and system

The invention discloses a transformer substation secondary circuit drawing storage and quick lookup method and system, relates to the technical field of drawing management, and solves the problems of abrasion, aging and fading after long-time use of paper drawings by electronically storing the drawings into a server. A label is arranged at the position, corresponding to the drawing, of the transformer substation, position information or loop description of the transformer substation is marked on the label, a drawing file is stored in the server side, and the drawing file further comprises geographic position information and loop description of a transformer substation loop corresponding to the drawing besides the electronic drawing. The geographic position information and the loop description in the drawing file are consistent with the position information or the loop description content of the transformer substation actually provided with the label, so that the purpose of quickly positioning the drawing file can be achieved. The consulting operation can be carried out only when the authorization of consulting the drawing is obtained, so that the safety of the drawing file is ensured, and the drawing file is prevented from being accessed, read and modified by irrelevant personnel.
Owner:MAINTENANCE BRANCH OF STATE GRID HEBEI ELECTRIC POWER +1

Remote-control rotary lifting insulation platform

The invention relates to a remote-control rotary lifting insulation platform, and the platform comprises a rotating mechanism, a double balance mechanism for connecting a machine with the rotating mechanism, and a lifting crawling ladder mechanism for connecting the machine with the double balance mechanism, the rotation of the double balance mechanism and lifting crawling ladder mechanism rotate is driven by the rotating mechanism controlled by remote control signals, and maintainers can finish the hot-line work on the lifting crawling ladder mechanism. According to the invention, the platform can significantly improve the controllability and security in aerial hot-line work operation of maintainers, the hot-line work times can be greatly improved, the hot-line work efficiency can be improved, the hot-line work technological level can be improved, the adaptability of the hot-line work in daily work can be further improved, the safe operation level of distribution network lines can be improved, the power supply reliability can be improved, the strength and technological level a power supply enterprise is shown for clients through no power-off operation, so that the good image the power supply enterprise is established, the investment confidence of the clients is improved, the power sale quantity is increased, and the economic benefit of the power supply enterprise is improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Distributed user energy storage electric quantity and electric charge settlement system and settlement method

PendingCN113033964AThe cost of electricity consumption in the whole society is reducedImprove electricity efficiencyFinancePayment circuitsAgricultural engineeringPower grid
The invention discloses a distributed user energy storage electric quantity and electric charge settlement system and settlement method, and the method comprises the steps: S1, settling electric quantity and electric charge according to constitution of distributed user energy storage equipment, an electric meter, an electric quantity and electric charge settlement unit and a settlement object in the settlement system; selecting any one of a subsequent traditional settlement reform method (S2), a virtual electricity meter settlement method (S3), a first platformization settlement method (S4) and a second platformization settlement method (S5); S2, using a traditional settlement reform method; S3, using a virtual electricity meter settlement method; S4, using a first platform settlement method; S5, a second platform settlement method; and S6, according to the electric quantity and electric charge settlement method, completing electric quantity metering and electric charge settlement among a power grid company, a power distribution enterprise, a distributed user, an integrated energy service company (platform company) and an electricity selling company.
Owner:HEPU ENERGY ENVIRONMENTAL TECHNOLOGY CO LTD

Auxiliary troubleshooting system for master control room

The invention discloses an auxiliary troubleshooting system for a master control room, and relates to the field of power industry substation robots. The auxiliary troubleshooting system comprises an AI robot trolley. The AI robot trolley comprises a carrying platform and two pairs of wheels installed at the bottom of the carrying platform side by side. A power module is arranged on the carrying platform. The power module adopts a 12V wireless charging module, and the wireless charging module carries out charging continuously in the running state of the trolley. The troubleshooting system is realized through four layers including a sensing layer, a network layer, a platform layer and an application layer. The sensing layer collects corresponding data collected by various sensing modules andtransmits the data to the platform layer for analysis through the network layer, a solution instruction is sent to a WIFI wireless relay of the application layer according to a solution obtained through visual identification and big data analysis, and the solution instruction is processed through the WIFI wireless relay. If the abnormal condition is not handled, operation and maintenance personnel are remotely notified to carry out manual handling. The system has the beneficial effects that power grid accidents are prevented, the cost is saved, and benefits are created.
Owner:国网山西省电力公司阳泉供电公司

Low-voltage bypass hot-line work control box

The invention belongs to the technical field of power systems, and particularly relates to a low-voltage bypass hot-line work control box. The low-voltage bypass work control box comprises a box body, a disconnecting link and a low-voltage circuit breaker, and is characterized in that the low-voltage bypass work control box further comprises an alarm and three relays. Two coil terminals of the first relay are correspondingly connected with an A1-phase line on the wire inlet side of the disconnecting link and an A2-phase line on the wire outlet side of the disconnecting link respectively, and two coil terminals of the second relay are correspondingly connected with a B1-phase line on the wire inlet side of the disconnecting link and a B2-phase line on the wire outlet side of the disconnecting link respectively. Two coil terminals of the third relay are respectively and correspondingly connected with a C1-phase line at the wire inlet side of the disconnecting link and a C2-phase line at the wire outlet side of the disconnecting link; the auxiliary contacts of the three relays are connected in parallel and then are connected in series with the battery and the alarm. The control box can automatically give an alarm when wiring is wrong, short circuit can be prevented, electric arc injury caused by on-load on-off and connection and override tripping caused by a fault in a bypass power supply area can be prevented.
Owner:YICHANG POWER SUPPLY CO OF STATE GRID HUBEI ELECTRIC POWER CO LTD

Multi-functional electrical equipment lifting hold lever tool

The invention discloses a multi-functional electrical equipment lifting hold lever tool which relates to a special tool for lifting and hanging, so as to solve the problems that an existing lifting hold lever occupies a large area and cannot be fixedly arranged on an electrical equipment support uprightly, the load bearing capability cannot be adjusted, the overhaul of transformation equipment is not adapted to, and the electrical equipment cannot be lifted when part of a transformation substation powers off. The lower end of a main support is connected with a base, and the top end of the main support is fixedly connected with the low position end of an oblique beam; one end of a traction oil wire rope is wound on a grinder, and the other end of the traction oil wire rope is wound on a fifth pulley through a first pulley, a second pulley, a third pulley and a fourth pulley; the first pulley is fixedly arranged on a first pulley frame; the second pulley is fixedly arranged on the base; the third pulley is fixedly arranged below the oblique beam; the fourth pulley is fixedly arranged below the high position end of the oblique beam; a lifting hook is arranged on the fifth pulley; a plurality of shackles are staggered up and down along the inner side surface and the outer side surface of the main support; and one end of a reinforced oil wire rope is wound on the grinder, and the other end of the reinforced oil wire rope is wound on a sixth pulley. The multi-functional electrical equipment lifting hold lever tool is used for the overhaul of the transformation equipment.
Owner:JIXI ELECTRIC POWER BUREAU +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products