Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

362results about How to "No soldering required" patented technology

Ceiling system applicable to large-span space steel structure and construction method thereof

The invention discloses a ceiling system applicable to a large-span space steel structure and a construction method thereof. The ceiling system comprises a ceiling mounting plate, an adjustable mounting base, a three-dimensional adjustable hoisting tray, a ceiling joist and a panel, wherein the adjustable mounting base is connected with the ceiling mounting plate through a fastener and a fixing part rather than welding, therefore, the traditional grid lower chord ball welding ceiling method is changed, potential safety hazards caused by overhead welding can be avoided, green construction is realized, the construction error effect of a three-dimensional adjustable digestive grid lower chord ball can be achieved; meanwhile, the three-dimensional adjustable hoisting tray can rotate in all directions, the structure of a main joist is adjustable horizontally, can be adapted to the curve change of a space steel structure roof, can absorb deformation and structure mounting errors of a grid structure generated under the action of static and dynamic loads. The ceiling system disclosed by the invention has the advantages of reliable structure, simpleness in mounting, light weight, no need of wielding, good durability, high economical efficiency and the like and also has great innovation, a high promotion value and strong market competitiveness.
Owner:广东省建筑装饰工程有限公司

Steel structure beam column assembly type rigid joint

InactiveCN103290928APromote the standardization processReasonable structureBuilding constructionsCantilevered beamField conditions
The invention relates to a building steel structure beam column assembly type rigid joint which is characterized in that splicing plates are interactively arranged on upper flanges and lower flanges of a cantilever beam and a frame beam, and the splicing plates on the two sides are connected with the beams by welding seams in a steel structure processing factory previously. During field mounting of the joint, the splicing plates firmly welded on the two sides serve as ear plates to allow a mounting beam section to be in place quickly; after being in place, the splicing plates are connected with the upper flange and the lower flange of the beam on the other side and spliced with a web plate by bolts; and the mounting of the beam column rigid joint is accomplished. The beam column joint is wholly spliced by the bolts in a mounting field, and is reasonable in structure, definite in force transmission, high in construction efficiency and good in safety; the field mounting is in place quickly; no welding is adopted; the mounting efficiency can be improved; the risk of a fire caused by the welding is avoided; and the joint is wholly assembled by the bolts in a construction field, so that a great convenience is brought to a construction site where the construction field condition is poor and the welding cannot be carried out conveniently.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY +1

`Method for integrally manufacturing hanging ring and infusion bag and bottle blank injection mold used in method

The invention aims to provide a method for integrally manufacturing a hanging ring and an infusion bag and a bottle blank injection mold used in the method. The manufacturing method comprises the following steps of (a) injection-molding of a bottle blank, namely performing injection-molding on an infusion bottle (bag) blank with a hanging ring by one step by using a hanging ring integral-injection mold; (b) pre-blowing molding, namely performing temperature regulation shaping and primary blow-molding on a bottle body of the injection-molded bottle blank, and bending the hanging ring at a certain angle; (c) blow-molding, performing secondary blow-molding on the bottle blank, and simultaneously bending the hanging ring into a formed sunken groove; (d) de-molding. According to the method and the injection mold, the hanging ring is directly injection-molded on the bottle blank, and the hanging ring and the bottle blank are integrally injection-stretching-blow molded, so that the hanging ring and the infusion bag are integrally molded, a production process is simple, and comprises few procedures, the production pollution is effectively avoided, and the production efficiency is improved; a hanging ring mold is eliminated, so that the mold input is low, the welding is not required, production sites are reduced, and the labor intensity and the manufacturing cost are reduced.
Owner:ANHUI DOUBLE CRANE PHARMA

Assembly method for LED lamp

The invention relates to the technical field of LEDs and particularly discloses an efficient assembly method for an LED lamp. The method includes the first step of connecting a P pole piece and an N pole piece to a power driving board respectively, the second step of forming an insertion hole in the middle of an LED lamp panel, the third step of forming two opposite sliding grooves in a lamp shell of the LED lamp, the fourth step of forming a clamping hole in the top end of a lamp holder of the LED lamp, the fifth step of enabling the power driving board to be inserted into the lamp shell along the sliding grooves, wherein when the N pole piece moves out of the lamp shell, a bending portion is bounced off through self elastic force, at the moment, the power driving board is pulled downwards in the opposite direction, the bending portion of the N pole piece is buckled to the end of the lamp shell, the lamp holder is fixed to the lamp shell to press the N pole piece, the P pole piece extends into the clamping hole in the lamp holder, and a conductive connecting piece is inserted into the clamping hole and is electrically connected with the P pole piece, and the sixth step of allowing the LED lamp panel to be electrically connected with the power driving board through a plug connector, so that a circuit is switched on. The assembly method for the LED lamp has the advantages of being high in installation efficiency, free of welding and low in cost.
Owner:DONGGUAN ARTS ELECTRONICS +1

Broadband double circularly polarized end-fire array antenna based on gap waveguide

A broadband double circularly polarized end-fire array antenna based on a gap waveguide comprises an upper metal cover plate layer, a gap waveguide layer and a lower metal cover plate layer which aresuccessively stacked from top to bottom, wherein the gap waveguide layer is combined with the upper metal cover plate layer to form a upper gap waveguide structure, and is combined with the lower metal cover plate layer to form a lower gap waveguide structure; the upper and lower gap waveguide structure are fed through a first input port and a second input port respectively; the gap waveguide layer includes a metal separating plate, and metal ridges and a plurality of metal pins which are arranged on the front and back sides of the separating plate; each metal ridge includes a ridge gap waveguide T-type power divider and a three-stage stepped transition section transitioning from the ridge gap waveguide to a slot gap waveguide; the terminal of the metal separating plate is set as a separating plate circular polarizer; an antenna radiation structure is composed of a plurality of separating plate circular polarizers arranged in a matrix. The broadband double circularly polarized end-on-fire array antenna satisfies the characteristics of a wide frequency band, easy integration, and different circular polarization directions.
Owner:XIDIAN UNIV +1

Bicycle frame and manufacturing process thereof

InactiveCN104029776AGuaranteed quality strengthReduce manufacturing costCycle framesVehicle frameSizing
The invention provides a bicycle frame. The bicycle frame comprises hollow tubes and metal connecting pieces, wherein the metal connecting pieces comprise a five-way connecting piece, a claw connecting piece, a seat tube connecting piece and two bicycle head connecting pieces; a bicycle head is connected with an upper tube through one bicycle head connecting piece; the bicycle head is connected with a lower tube through one bicycle head connecting piece; the upper tube, a middle tube and an upper fork are connected together through the seat tube connecting piece; the lower tube, the middle tube and a lower fork are connected together through the five-way connecting piece; the upper fork and the lower fork are connected with each other through claws; the hollow tubes and the metal connecting pieces are glued into a frame body. A process for manufacturing the bicycle frame comprises the following steps: customizing the metal connecting pieces and the claws on a large scale, performing sand blasting and cleaning for later use; performing sand blasting on hollow tubes including the bicycle head, the upper tube, the middle tube, the lower tube, the upper fork and the lower fork, and cleaning for later use; gluing spare metal connecting pieces, claws and hollow tubes into a frame body; entering a baking procedure, and baking at the temperature of 140-160 DEG C for an hour for sizing; after baking, cooling to obtain the bicycle frame.
Owner:TIANJIN JIAHAO BICYCLE +1

Foundation pit anti-floating anchor rod pull-out test tool

The invention discloses a foundation pit anti-floating anchor rod pull-out test tool. The tool comprises an anchor rod, an anchor rod locking component, a connecting sleeve, a lengthened anchor rod and a center-penetrating jack, wherein the anchor rod consists of a plurality of anchor ribs; the anchor rod consists of a locking rod and a locking buckle component; the upper end of each anchor rib in the anchor rod is symmetrically bent from the center to the outside to form a bent part; a plurality of groove ways for placing the anchor ribs are symmetrically and vertically arranged on the outer wall of the lower part of the locking rod at intervals; the locking buckle component is arranged on the lower part of the locking rod in a buckling way to lock and fix the anchor ribs in the groove ways; a step structure pushing against the bent parts of the anchor ribs is arranged on the middle part of the locking rod; the upper end of the lock rod and the lower end of the lengthened anchor rod are linked together through the connecting sleeve; the lengthened anchor rod is linked with the center-penetrating jack; the lock rod and the lengthened anchor rod can be quickly connected together through the anchor rod locking component. The center-penetrating jack applies a pull-out force to the lengthened anchor rod and transfers the force to the anchor rod, so that a pull-out test is performed; according to the pull-out test tool, the traditional structure form is eliminated, lengthened anchor ribs are not used, welding is not required, and the tool can be repeatedly used, so that the cost is effectively reduced, and the working efficiency is improved.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

Connecting piece used for fixing steel structure panel house frame and used in multi-angle orientation mode

The invention discloses a connecting piece used for fixing a steel structure panel house frame and used in a multi-angle orientation mode. A connecting piece body is included, the left end of the connecting piece body is fixedly connected with the right end of a fixing plate through a first universal ball. An adjustment mechanism is arranged between the center position on the left side of the lower end of the connecting piece body and the fixing plate, the left end of the fixing plate is connected with a mounting frame through a connecting mechanism, and a mounting mechanism is arranged at theleft end of the mounting frame. The vertical, horizontal and oblique rotation are achieved through manual adjustment by arranging two sets of adjusting mechanisms, and cooperated with the mounting mechanism, the fixing plate is installed at different angles, so that the connecting piece body performs hemisphere movement within a certain range of the installation location. The hemisphere movementfar exceeds the rotation angle which a current connecting piece can provide, and the orientation is automatically locked after the adjustment is completed. In addition, the connecting mechanism solvesthe problem of requiring prior measurement to install the connecting piece, so that the possibility of mounting error and deviation is avoided.
Owner:王升

Secondary electrochemical battery sealing body with encapsulated type chip shield structure and battery

The invention provides a secondary electrochemical battery sealing body with an encapsulated type chip shield structure. The sealing body comprises a cathode cap, a circuit board module and an insulating washer, wherein a sunk wire turn structure is formed at one end, near the cathode cap, of a battery shell; the circuit board module is positioned between the wire turn and the cathode cap; the length of the diameter of the circuit board module is set between the sunk inner diameter formed by the wire turn and the inner diameter of the battery shell, so that the circuit board module is clamped on one side of the wire turn; the circuit board module and the cathode cap are connected through a conducting material, and form a first enclosed electromagnetic shielding space; the battery shell and the circuit board module form a second enclosed electromagnetic shielding space; electronic components are arranged in the first enclosed electromagnetic shielding space and the second enclosed electromagnetic shielding space; the section of the insulating washer adopts a shape referring to the description; the insulating washer is arranged in the interspace among the battery shell, the circuit board module and the cathode cap, presses and fixes the circuit board module between the wire turn and the battery shell, and insulates the battery shell and the cathode cap.
Owner:FUJIAN NANPING NANFU BATTERY

Anchor pile method static load test detecting device

The invention discloses an anchor pile method static load test detecting device. A static load test pile and a jack arranged above the static load test pile are included. A main beam is horizontally arranged above the jack. At least two secondary beams perpendicular to the main beam are horizontally arranged above the main beam. Two anchor piles are arranged under each secondary beam, and the anchor piles are symmetrically arranged on the two sides of the main beam. A plurality of anchor ribs are arranged at the middle positions of the anchor piles, and each of the two sides is provided with arow of parallel connecting rods. The connecting rods are located on the two sides of the secondary beams. Anchor discs are further arranged between the anchor piles and the main beam, supporting pieces are arranged between the anchor discs and the anchor piles, and the upper ends of the anchor ribs are fixedly connected with the anchor discs. The upper ends of the connecting rods penetrate through the anchor boxes and are fixed to the positions above the secondary beams through steel bar fixing pieces. According to the anchor pile method static load test detecting device, design is reasonable, construction is convenient, the anchor ribs can be better positioned and fixed, and the construction period is effectively shortened.
Owner:中汽建工(洛阳)检测有限公司

Novel building structure

The invention discloses a novel building structure. The novel building structure comprises a building structure body. The building structure body is composed of a plurality of structure units in a splicing mode. The structure units include base plates, transverse sliding rails, transverse drainage grooves, transverse limiting grooves, transverse sliding grooves, transverse limiting devices, longitudinal sliding rails, longitudinal drainage grooves, longitudinal limiting grooves, longitudinal sliding grooves and longitudinal limiting devices. One side of the base plates are fixed with transverse sliding rails. The transverse drainage grooves are formed in the transverse sliding rails. The transverse limiting grooves are formed in one ends of the transverse drainage grooves. The transverse sliding grooves are formed in the other sides of the base plates. The transverse limiting devices are arranged in the transverse sliding grooves. One side, perpendicular to the transverse sliding grooves, of the base plates are provided with the longitudinal sliding grooves. The longitudinal drainage grooves are formed in the longitudinal sliding rails. The novel building structure is composed of aplurality of structure units in a splicing mode, the connecting and splicing process is simple, and the whole structure after being spliced is very stable, easy to disassemble, capable of being reused, and strong in the practicability.
Owner:黄梓建

Jacking system for closure section of continuous rigid frame bridge and jacking deviation rectifying method

The invention discloses a jacking system for a closure section of a continuous rigid frame bridge and a jacking deviation rectifying method. The jacking system is composed of a top plate jacking system and a bottom plate jacking system. The top plate jacking system comprises two sets of top plate embedded bases arranged at the ends of two cantilever beam sections of the continuous rigid frame bridge correspondingly, top plate rigid supporting structures supported between the two sets of top plate embedded bases and a top plate jacking mechanism. The bottom plate jacking system comprises two sets of bottom plate embedded bases arranged at the ends of the two cantilever beam sections correspondingly, bottom plate rigid supporting structures supported between the two sets of bottom plate embedded bases and a bottom plate jacking mechanism. The jacking deviation rectifying method comprises the steps of (1) measurement of position deviation of the cantilever beam sections, (2) adjustment of elevation deviation of the cantilever beam sections, (3) deviation rectifying adjustment and (4) longitudinal jacking. The jacking system is simple in structure, reasonable in design, easy and convenient to construct and good in using effect, the jacking deviation rectifying process of the cantilever beam sections on the two sides of the closure section can be completed easily, conveniently and rapidly, and the rectifying requirements of lateral deviation and reverse deviation of the cantilever beam sections can be met.
Owner:XIAN HIGHWAY INST

Unit extensible type assembled metal gutter and manufacturing and installing method thereof

The invention provides a unit extensible type assembled metal gutter which comprises a plurality of gutter unit sections. Each gutter unit section comprises a metal plate manufactured U-shaped gutter groove body section and a metal framework, the metal frameworks are fixedly arranged at the bottoms of the U-shaped gutter groove body sections and / or the side walls of the outer sides of the U-shaped gutter groove body sections and provided with connection structures connected with a building. Ports at two ends of each U-shaped gutter groove body section are integrally provided with a transverse U-shaped groove extensible interface portion, the outer sides of U-shaped groove extensible structure portions arranged at two ends of a U-shaped gutter groove body are provided with matched fastener structures, and adjacent gutter unit sections are integrally connected through the fastener structures. The invention further provides a manufacturing and installing method of the unit extensible type assembled metal gutter. By means of the unit extensible type assembled metal gutter and the manufacturing and installing method, assembling type construction can be achieved, the work efficiency is high, the quality is good, the construction is convenient, no welding is needed in a field, safety risks are small, the comprehensive cost is saved by 30%, the construction, installation, production and processing work efficiency is improved by three times, and the gutter maintenance cost is reduced by 80%.
Owner:JANGHO GRP

Power distribution box and hinge thereof

The invention discloses a hinge. The hinge comprises a hinge base, a square steel rotating shaft and hinge pins. The hinge base comprises a bent plate. The bent plate is provided with a first verticalplate and a second vertical plate, and the first vertical plate and the second vertical plate form a bending corner. The first vertical plate is provided with a containing opening used for containingthe square steel rotating shaft, and the upper end and the lower end of the first vertical plate are provided with lugs. Any lug forms an installation hole used for installing the corresponding hingepin in the vertical direction. The square steel rotating shaft comprises a rotating shaft body, and the upper end and the lower end of the rotating shaft body are provided with hinge shaft holes. After the hinge shaft hole located in the upper end aligns to the installation hole located in the upper end and the hinge shaft hole located in the lower end aligns to the installation hole located in the lower end, the square steel rotating shaft can be installed to the lugs through the hinge pins, so that the square steel rotating shaft can rotate relative to the lugs. The invention further discloses a power distribution box body comprising the hinge. According to the hinge, welding is not needed, the bearing load of the square steel rotating shaft is high, machining is easy, installation is convenient, the hinge is not affected by the material thickness, spraying or other factors, and the cost is low.
Owner:CHONGQING JINHUA ELECTRIC COMPLETE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products