This utility model discloses an
elevator guide rail replacement tool, including a fixing mechanism, a
pulley block mounted on the fixing mechanism, and a
rope wound around the
pulley block. Both ends of the
rope are free ends with fixed lifting devices for
hooking onto the new / old
elevator guide rail. The fixing mechanism has an anti-fall-off component for fixing the new guide rail to the existing
elevator guide rail. This utility model abandons the traditional electric hoist lifting
system, revolutionarily using the bolt holes at the ends of the existing elevator guide rail as lifting points to build a temporary lifting
system. This reduces construction costs, eliminates safety risks, eliminates the need for support personnel, saves
electricity, and reduces the consumption of
wire rope, lubricating oil, etc. Simultaneously, this utility model applies the principle of gravity balance to form a non-powered lifting
system, significantly reducing labor intensity, improving construction accuracy, increasing construction efficiency, and exhibiting low operating
noise, low construction costs, and
energy conservation and
environmental protection.