Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

35results about How to "Reduce installation impact" patented technology

Floating transportation device and method for major diameter underwater water pipes

The invention discloses a floating transportation device and method for major diameter underwater water pipes. The floating transportation device for the major diameter underwater water pipes comprises the water pipes with lengths being 54-60 m and 138-140 m correspondingly, multiple balancing weights, and multiple air bags; the multiple balancing weights are fixed on the water pipes at intervals,head plates are separately fixed on the end heads of two ends of one of the water pipes, the multiple air bags are arranged along the two longitudinal sides of the water pipes at intervals, and multiple beams of I-shaped steel are connected end to end and are separately fixed under two sides of the middle portions of the balancing weights arranged at intervals. The method for the major diameter underwater water pipes comprises the following steps that (1), HDPE pipes are connected in a welded mode and the balancing weights are installed; (2), the head plates are installed and a closed water test is carried out; (3), the water pipes float and the air bags are installed; (4), the water pipes are flooded with water and sink; and (5), the air bags are deflated and the water pipes are immersed. According to the floating transportation device and method for the major diameter underwater water pipes, the quantity of stainless steel flanges and the cost of the construction material are reduced greatly, total time of butt joint of water stainless steel flanges is reduced, the cost of underwater construction of the water pipes is reduced, the construction period is shortened, and construction efficiency is enhanced.
Owner:CHINA COMM 2ND NAVIGATIONAL BUREAU 3RD ENG

Floating installation method for upper assembling block of tension leg platform

The invention discloses a floating installation method for an upper assembling block of a tension leg platform. The floating installation method includes the following installation steps: 1, pulling a lower floating body to an installation sea area, and fixedly connecting the lower floating body; 2, connecting the upper assembling block with a power positioning ship, and dryly pulling the upper assembling block to the installation sea area; 3, monitoring the movement of the lower floating body and the movement of the power positioning ship; 4, when the installation requirement is met, starting ship entering work; 5, after the lower floating body is submerged to be at the set immersion depth, adjusting the position of the upper assembling block and the position of the lower floating body, and preparing butt joint work; 6, enabling the lower floating body to continuously float till the lower floating body is in contact with the upper assembling block, transferring the weight of the upper assembling block to the lower floating body, and enabling the ship to get out of the lower floating body and be driven out of the installation sea area; 7, fixing the upper assembling block and the lower floating body, and continuously and wetly pulling the upper assembling block and the lower floating body to a final working sea area for other-part installation. According to the floating installation method, after the upper assembling block and the lower floating body are independently built, floating installation is completed on the sea; influences of a building site on assembling block installation are greatly reduced, and the on-sea connecting debugging and installation time is saved.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Air conditioner data transmission method and device and air conditioner

The invention relates to an air conditioner data transmission method and device and an air conditioner. The invention belongs to the technical field of air-conditioning network communication. The method includes: when the wireless cellular network signal of a host air conditioner is abnormal, obtaining the broadcast information sent by other air conditioners through a short-distance wireless module through the short-distance wireless module, wherein the broadcast information comprises wireless cellular network signal information and online/offline state information, and when the air conditioner is online, the broadcast information further comprises a short-distance wireless network connection secret key; selecting one air conditioner in an online state from other air conditioners as a forwarding air conditioner according to the obtained broadcast information, and establishing close-range wireless network connection between the host air conditioner and the forwarding air conditioner; and sending the operation data of the host air conditioner to the forwarding air conditioner so as to send the operation data of the host air conditioner by utilizing the forwarding air conditioner. According to the method, the timely efficiency of data transmission of the air conditioner is ensured.
Owner:GREE ELECTRIC APPLIANCES INC

Cross-road cable laying structure and construction method thereof

The invention relates to a cross-road cable laying structure and a construction method thereof, which relate to the technical field of power engineering construction, and solve the problem that the temporarily-built vertical rods tension the wires off the ground easily, so that a cable mounting structure is extremely unstable. The cross-road cable laying structure comprises the pre-buried pits formed in the soil bodies at the two sides of a road respectively, pre-buried bases are pre-buried in the pre-buried pits, supporting rod mounting pits and pull disc mounting pits are formed in the pre-buried bases, and the cross-road cable laying structure further comprises cable supporting rods, pull disc blocks, reinforcing bodies, transverse rods, pulleys, arch-shaped guide pipes, guide grooves,pull wires and pull rods. The method comprises the steps of S1 prefabricating the pre-buried bases, the cable supporting rods and the pull disc blocks; S2 arranging the pre-buried pits; S3 burying thepre-buried bases in the pre-buried pits; S4, connecting the pull wires, the cable vertical rods, the pull rods and the pull disc blocks; S7 piling the protective piles; S8, erecting the cable. The cross-road cable laying structure is stable in structure and short in construction period, and is firm, durable and environment friendly.
Owner:河南华能联合电力建设有限公司

Power transmission line on-line inspection system and method with automatic obstacle crossing function

The invention relates to a power transmission line online inspection system and method with an automatic obstacle crossing function. The system comprises a snake-shaped wire climbing robot, a communication device and a background control device, the snakelike wire climbing robot comprises a robot body, a driver, a camera, a photoelectric distance measuring sensor, a mutual inductance power takingunit, an intelligent control unit and a power supply for supplying power to the whole snakelike wire climbing robot. The driver, the camera, the photoelectric distance measuring sensor and the mutualinductance electricity taking unit are connected with the intelligent control unit, the intelligent control unit is connected with the background control device through the communication device, and the robot body is wound in a power transmission line to be inspected in advance. Compared with the prior art, the power transmission line on-line inspection system and method can cross obstacles, and combines the robot autonomous walking and the background manual control, so that the defects of manual and unmanned aerial vehicle operation are effectively overcome, the inspection quality and inspection frequency are effectively improved, and the working efficiency is improved.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO

Equipment power distribution control box

The invention discloses an equipment power distribution control box, and the box structurally comprises an inner corner structure, a control box frame and a control box door, wherein the inner cornerstructure is installed in the control box frame, the control box frame is connected with the control box door through a shaft bolt, and the inner corner structure is composed of an upper rod structure, a side supporting structure and a tripod strip, wherein the upper rod structure and the side supporting structure are arranged on the tripod strip; the upper rod structure comprises a movable striprod and a movable rod shaft; the movable strip rod is connected with the movable rod shaft, and the movable strip rod is connected with a bottom supporting strip; the movable rod shaft comprises a rodshaft disc, a reinforcing arc cover, a transverse plate and a welding bottom cover, wherein the rod shaft disc is provided with the transverse plate, the reinforcing arc cover and the transverse plate are locked, and the rod shaft disc is provided with the welding bottom cover. The inner corner structure plays a role in assisting in loading, the loading force at the corner of the box frame of thecontrol box is improved, the side supporting structure plays a role in buffering, the installation impact force is reduced, edge cracking is avoided, and the operation signal is good.
Owner:庄小梅

Cylindrical expansion tank for air source heat pump heating and manufacturing method thereof

The invention discloses a cylindrical expansion tank for air source heat pump heating and a manufacturing method thereof. Slide rails are arranged on the inner wall of a barrel body in the expansion tank, a side pressing steel plate is arranged on each slide rail, and a U-shaped supporting part is arranged between the two side pressing steel plates. A sliding device is arranged on the outer side of each side pressing steel plate, a U-shaped mounting seat is arranged between the two side pressing steel plates, and an air bag is arranged in the U-shaped mounting seat. The manufacturing method includes the steps of (a) manufacturing of an upper end cover, (b) manufacturing of a lower end cover, (c) stretching forming of the barrel body, (d) welding and fixing of the upper end cover and the barrel body, (e) cleaning of the upper end cover and the barrel body, (f) fixing of the side pressing steel plates and the U-shaped supporting part, (g) sliding of the air bag, (h) fixing of the air bag, (i) welding and fixing of the lower end cover and the barrel body, (j) pre-inflation at an inflating opening of the air bag, and (k) labeling and packaging. The mounting portion of the air bag and the mounting portion of the upper end cover are precisely aligned, so that mounting difficulty is lowered; and lateral supporting on the air bag is achieved, and the air bag shock absorption effect is achieved.
Owner:青岛开拓隆海智控有限公司

Mounting equipment and mounting method for large reinforcement cage

The invention relates to the technical field of pile foundation construction, in particular to mounting equipment and a mounting method for a large steel reinforcement cage. The mounting equipment isused for mounting the steel reinforcement cage in a pile foundation hole, and the steel reinforcement cage comprises at least two segmental steel reinforcement cage bodies; the mounting equipment comprises a vertically-arranged truss and a butt joint mechanism; the truss is arranged around the pile foundation hole; at least two screw clamp sets are arranged on the truss in the vertical direction in a spaced mode and used for temporarily fixing the segment reinforcement cage bodies; and the butt joint mechanism is detachably arranged at the top of the truss, and the segment reinforcement cage bodies can penetrate through the butt joint mechanism so that the segment reinforcement cage bodies can be lowered into the pile foundation hole. According to the mounting equipment and the mounting method for the large steel reinforcement cage, the segmental reinforcement cage can be rapidly hoisted in a segmental mode, accurate butt joint of the multiple segmental reinforcement cage bodies can beachieved through the truss and the butt joint mechanism, and the influence of canyon wind on installation of the reinforcement cages is effectively reduced.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1

Novel inclined single-shaft tracking support driving device

The invention relates to the technical field of solar devices, in particular to a novel inclined single-shaft tracking support driving device which comprises a front stand column, a rear stand column and a main beam. The front stand column is connected with a hoop plate, the hoop plate is provided with a first kidney-shaped hole, the outer wall of the hoop plate is provided with a first bolt, and the first bolt is spirally connected with the front stand column. The hoop plate is connected with an installation plate. The installation plate is connected with a rotary speed reducer, the rotary speed reducer is connected with a rotating arm device, the rotating arm device comprises a lower rotating arm, the lower rotating arm is fixedly connected with the rotary speed reducer, swing arms are hinged to the two ends of the lower rotating arm respectively, upper rotating arms are hinged to the swing arms, and the upper rotating arms are connected with the main beam. The rotary speed reducer is connected with the front stand column through the hoop plate and the first bolt, and the first kidney-shaped hole is formed in the hoop plate. By means of the arrangement, when the rotary speed reducer is installed, the height of the installation plate can be adjusted, and the influence of errors on installation of the rotary speed reducer is reduced.
Owner:厦门晶晟能源科技有限公司

Portable mounting structure of motor for new energy automobile and motor for new energy automobile

The invention discloses a portable mounting structure of a motor for a new energy automobile and the motor for the new energy automobile, the portable mounting structure comprises two fixing supports, one side of each fixing support is provided with a connecting hole, and fixing bolts are fixedly sleeved in the two connecting holes. According to the motor portable installation structure for the new energy automobile and the motor for the new energy automobile, the quality requirement for workers in the motor installation process is lowered, and meanwhile, the situation that the workers conduct non-standard operation such as guiding on the suspended motor through limbs and the like, and consequently a large safety accident is caused is avoided; the influence of a complex structure in the frame on the installation process and the installation difficulty of the motor are reduced, the installation mode is simple, disassembly and maintenance of the motor are facilitated, the installation efficiency of the motor body is improved, and the situation that in the installation process of the motor body, workers need to continuously adjust fixing holes to be aligned with limiting holes is avoided; the installation efficiency of the motor body is further improved, and the workload of workers is reduced.
Owner:无锡泓阳电动科技有限公司

Method for replacing whole circle of blast furnace copper cooling wall without entering people

The invention belongs to the field of blast furnace cooling wall replacement, and particularly relates to a method for replacing a whole circle of blast furnace copper cooling wall without entering people. According to the method, two symmetrical access holes are dug in a cooling wall furnace shell near a platform located above an old cooling wall to be dismantled to serve as a conveying channel of the cooling wall; water spraying guns uniformly arranged on a frustum of a furnace top are dismantled, and corresponding electric chain blocks and electric chain block chains are hung by utilizing water gun mounting holes and large square holes of the furnace top; the old cooling wall is detached and poured out from the outside of the furnace shell, and then a new cooling wall is installed; the diameter of a new cooling wall water pipe sleeve is reduced, the influence of refractory materials between the original furnace shell and the cooling wall on installation is reduced, and mud jacking sealing of the cold face of the cooling wall is guaranteed. According to the method, the danger caused by the influence of adverse factors such as coal gas, high temperature and objects falling from high altitudes can be greatly reduced by adopting a replacement mode that people do not enter the furnace; and residual iron slag in the furnace is not removed, so that the construction time can be greatly shortened.
Owner:武汉钢铁有限公司

Large-diameter underwater water pipeline floating device and method

The invention discloses a floating transportation device and method for major diameter underwater water pipes. The floating transportation device for the major diameter underwater water pipes comprises the water pipes with lengths being 54-60 m and 138-140 m correspondingly, multiple balancing weights, and multiple air bags; the multiple balancing weights are fixed on the water pipes at intervals,head plates are separately fixed on the end heads of two ends of one of the water pipes, the multiple air bags are arranged along the two longitudinal sides of the water pipes at intervals, and multiple beams of I-shaped steel are connected end to end and are separately fixed under two sides of the middle portions of the balancing weights arranged at intervals. The method for the major diameter underwater water pipes comprises the following steps that (1), HDPE pipes are connected in a welded mode and the balancing weights are installed; (2), the head plates are installed and a closed water test is carried out; (3), the water pipes float and the air bags are installed; (4), the water pipes are flooded with water and sink; and (5), the air bags are deflated and the water pipes are immersed. According to the floating transportation device and method for the major diameter underwater water pipes, the quantity of stainless steel flanges and the cost of the construction material are reduced greatly, total time of butt joint of water stainless steel flanges is reduced, the cost of underwater construction of the water pipes is reduced, the construction period is shortened, and construction efficiency is enhanced.
Owner:CHINA COMM 2ND NAVIGATIONAL BUREAU 3RD ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products