Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

55 results about "Post insertion" patented technology

Bunched cable manufacturing multi-function intelligent manipulator and automatic cabling system thereof

The invention discloses a bunched cable manufacturing multi-function intelligent manipulator and an automatic cabling system thereof. The manipulator comprises a wrist system, a multi-functional finger system and a movement base; the wrist system comprises a wrist lifting mechanism, a wrist rotation mechanism, a spindle and a finger assembly disc; the lower end of the spindle sequentially penetrates through the wrist lifting mechanism, the wrist rotation mechanism and the finger assembly disc; the upper part of the spindle is connected to the wrist lifting mechanism; the lower part of the spindle is connected to the wrist rotation mechanism; the wrist lifting mechanism is fixedly connected to the wrist rotation mechanism; the wrist rotation mechanism is fixedly connected to the movement base; the multi-function finger system comprises a cable drawing and cabling finger assembly, an inserting-pulling-cable-cutting finger assembly and a positioning post insertion finger assembly; each finger assembly is arranged on the finger assembly disc of the wrist system; the automatic cabling system comprises the manipulator; by adopting the bunched cable manufacturing multi-function intelligent manipulator and the cabling system thereof, automatic cabling of bunched cable networks of various lengths and widths as needed is realized; the automation degree is high; and operation is simple.
Owner:黑龙江润吉川科技有限公司

Preparation method of ergosterol and gefitinib combined compound liposome freeze-dried powder, liposome and application thereof

ActiveCN110623964AStrong proliferation inhibitory effectGood apoptosis rateOrganic active ingredientsPowder deliveryCyclic peptideFluorescence
The invention relates to a preparation method of RGD cyclic peptide R8 peptide modified ergosterol and gefitinib combined compound liposome freeze-dried powder. The preparation method comprises the following steps: adding a freeze-drying protective agent into a pre-prepared RGD / R8-ERG / GEF-LIP liposome suspension in an external addition manner; and finally, preparing the freeze-dried powder of thecompound liposome by adopting a freeze-drying method. The RGD / R8-ERG / GEF-LIP lipidosome suspension is prepared by adopting the following method: firstly, preparing ERG / GEF-LIP, and then, preparing theRGD / R8-ERG / GEF-LIP lipidosome suspension by adopting a post-insertion method. According to the invention, an RGD / R8-ERG / GEF-LIP active drug-loading liposome drug delivery system is successfully constructed; ERG / GEF-LIP is used for investigating a freeze-drying process and a prescription, and after an optimal prescription process is screened out, the optimal prescription process is applied to RGD / R8-ERG / GEF-LIP for verification. An in-vitro test result of RGD / R8-ERG / GEF-LIP freeze-dried powder proves that the RGD / R8-ERG / GEF-LIP freeze-dried powder has a relatively strong tumor cell proliferation inhibition effect, the fluorescence uptake intensity and the good cell apoptosis rate.
Owner:ZHEJIANG CHINESE MEDICAL UNIVERSITY

Novel member type curtain wall system

ActiveCN103850374AHorizontal "S" shape effect realizationAchieve horizontal unbiased connectionWallsArchitectural engineeringPost insertion
The invention discloses a novel member type curtain wall system, which comprises an upper connecting piece, a lower connecting piece and a member type curtain wall board arranged between the upper connecting piece and the lower connecting piece, wherein the upper connecting piece and the lower connecting piece are fixedly arranged at the upper end and the lower end of a building compartment respectively; the member type curtain wall board comprises an upper transverse beam, a lower transverse beam, a plurality of upright posts and compartment curtain wall boards; the upper and lower transverse beams are provided with fixing notches which correspond to the upper connecting piece and the lower connecting piece respectively; upright post insertion cores are arranged inside the two ends of the upright posts, and are fixed to the upper transverse beam and the lower transverse beam; the compartment curtain wall boards are fixed to the upper transverse beam, the lower transverse beam and the upright posts. The novel member type curtain wall system has all the advantages of a member type curtain wall system, the construction difficulty is lowered, the construction speed and installation accuracy are increased, the cost is lowered, and the main body adaptability is improved.
Owner:BEIJING ZHONGRUI HONGYU CURTAIN WALL DECORATION ENG

Fabricated operation platform for tensioning deep foundation pit anchor cable

The invention discloses a fabricated operation platform for tensioning a deep foundation pit anchor cable. The operation platform comprises a support seat steel connecting rod, a diagonal draw bar, a steel upright rod, a platform rod, a handrail upright post insertion pipe, a handrail upright post, a handrail grab rail insertion pipe, a longitudinal grab rail and a support seat steel plate, wherein the diagonal draw bar, the steel upright rod and the platform rod are connected to form a triangle, and connected with a reinforcing steel plate and the support seat steel connecting rod through a member node; the support seat steel connecting rod is connected with the support seat steel plate; the support seat steel plate is connected with a crown beam or a waist beam of the deep foundation pit anchor cable through embedded bolts; the handrail upright post insertion pipe is fixed at the end part of the platform rod; a handrail upright post shaft is inserted and fixed into the handrail upright post insertion pipe; the handrail grab rail insertion pipe is arranged on the side wall of the handrail upright post; a longitudinal grab rail shaft is inserted into the handrail upright post insertion pipe to form one single-frame bracket; and a bamboo plywood and a transverse grab rail of the platform are arranged between adjacent single-frame brackets. The fabricated operation platform can be dismantled and assembled, is good in overall stability, safe, reliable, green and environment-friendly, and can be widely applied to tensioning operation of the deep foundation pit anchor cable of a large building, and the construction period is shortened.
Owner:HUNAN NO 6 ENG CO LTD

Factory prefabricated steel-concrete composite shear wall field installation vertical connection structure

The invention discloses a factory prefabricated steel-concrete composite shear wall field installation vertical connection structure. The factory prefabricated steel-concrete composite shear wall field installation vertical connection structure comprises a plurality of vertical post-insertion anchoring ribs, a plurality of upper welding anchorage plates, a plurality of lower welding anchorage plates and a plurality of connecting anchorage plates. The upper portions of the connecting anchorage plates are connected with the upper welding anchorage plates through upper connecting bolts in a fastening mode, the lower portions of the connecting anchorage plates are connected with the lower welding anchorage plates through lower connecting bolts in a fastening mode, and the vertical post-insertion anchoring ribs are vertically arranged in a steel-concrete composite pipe. The factory prefabricated steel-concrete composite shear wall field installation vertical connection structure greatly improves the plasticity and toughness of the overall steel-concrete composite shear structure, greatly improves the deformation resistance and compressive strength of the shear wall, and the vertical joint structure is wrapped in concrete, attractiveness is achieved, connection strength is high, stability is high, and dislocation is not prone to being generated.
Owner:HENAN LYUJIAN BUILDING TECH CO LTD

Field connection structure of factory prefabricated steel-concrete composite shear wall in horizontal direction

The invention discloses a field connection structure of a factory prefabricated steel-concrete composite shear wall in the horizontal direction. The field connection structure of the factory prefabricated steel-concrete composite shear wall in the horizontal direction comprises a plurality of horizontal post-insertion anchoring ribs, the left side face of one steel-concrete composite pipe and theright side face of the other steel-concrete composite pipe are in contact and a plurality of inserting holes are formed in the left side face of the one steel-concrete composite pipe and the right side face of the other steel-concrete composite pipe, the two steel-concrete composite pipes are horizontally adjacent, and the horizontal post-insertion anchoring ribs pass through the inserting holes and extend into the two steel-concrete composite pipes which are adjacent. The field horizontal connection method is simple and high in reliability, the dislocation of two adjacent steel concrete composite shear walls is avoided, the ductility and compressive strength of concrete are greatly improved, the ductility and tenacity of the overall steel-concrete composite shear wall structure are greatly improved, deformation resistance and compressive strength of the shear wall are greatly improved, and at the same time, the problem of fire prevention and corrosion prevention of a steel structure building is further solved effectively because steel plates with rib reinforcements are wrapped in concrete.
Owner:HENAN LYUJIAN BUILDING TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products