The invention discloses a construction method of a decompression-type fracturing channel and belongs to the field of oil-gas
field development. According to the construction method, the fracturing channel is opened through a fracturing sliding sleeve. The construction method comprises the steps that well-
logging information is obtained, and designing of a well-cementing
pipe string is completed according to the well-
logging information; the opening pressure of the fracturing sliding sleeve, the mounting number of first shear pins and the mounting chamber of second shear pins in the well-cementing
pipe string are determined; the well-cementing
pipe string is tripped into a borehole, and well-cementing operation is completed; a
wellhead is pressurized, thus the first shear pins are sheared off, and after the
wellhead is pressurized to preset pressure,
wellbore pressure test operation is completed through the fracturing sliding sleeve; and the
wellhead continues being pressurized, thus the second shear pins are sheared off, the pumping pressure of the wellhead is released till the fracturing sliding sleeve is completely opened, and thus building of the fracturing channel is completed.The construction method of the decompression-type fracturing channel is easy to operate, short in period and low in cost, the requirement for two-time
wellbore pressure test can be met, and the pressure test time is not limited.