The invention provides a cable bridge end structure, and the structure comprises a bridge with three baffle plates. The end parts of the baffle plates are each provided with an everted end, and the everted ends form 90-degree bent left end face, right end face and lower end face, wherein three end faces are respectively provided with a plurality of installation holes. The invention also provides aconstruction method for a cable bridge to pass through a fire compartment, and the method comprises the steps: 1, separating the welding points of the three baffle plates of a cable bridge end by a certain length L; 2, enabling the separated ends to be everted by 90 degrees, and forming the left end face, the right end face and the lower end face; 3, sleeving a wall pre-buried steel pipe part through a bridge, enabling the left end face, the right end face and the lower end face to be attached to the surface of a wall, and fixing the left end face, the right end face and the lower end face through steel nails; 4, carrying out the filling of a fireproof material and the end blocking after the arrangement of the cable; 5, performing the covering through a bridge cover plate. The method greatly enlarges the contact area of the cable bridge and the wall, does not need to carry out the filling of the fireproof material at the inner sides of the baffle plates, is quick in construction, is large in contact area, and is good in fireproof and sealing effect. Moreover, the appearance is regular, neat and beautiful.