Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

49results about How to "Improve construction effect" patented technology

Illumination device and method for spectroscopic analysis

An illumination subsystem for use in optical analysis which provides spatially and angularly homogenized radiation to the sample being analyzed. The system eliminates the illumination system as an interferent in the overall optical analysis. Thus, modest translations or rotations of the illumination source or changing the illumination source does not require recalibration of the instrument or prior modeling of illumination variability due to such changes. Illumination stability is achieved by incorporating a light pipe which both angularly and spatially homogenizes the light. Further, a series of filters and / or lenses are incorporated to provide bandpass filtering which eliminates unwanted wavelengths or bands of wavelengths from contacting the tissue and allows for a higher signal-to-noise ratio when the sample is tissue, while preventing thermal damage.
Owner:RIO GRANDE MEDICAL TECH

Construction method for underground diaphragm wall of deep foundation pit for subway station in collapsible loess areas

The invention discloses a construction method for an underground diaphragm wall of a deep foundation pit for a subway station in collapsible loess areas. The constructed station deep foundation pit for the subway station is divided into an upper-part foundation pit and a lower-part foundation pit from top to bottom; the building enclosure of the lower-part foundation pit is the underground diaphragm wall; and the upper-part foundation pit is a foundation pit formed by slope excavation. The construction method disclosed by the invention has the following steps of: (1) construction for upper-part foundation pit slope excavation and foundation pit slope reinforcement; (2) construction for lower-part foundation pit building enclosure: surveying and paying off, guide wall construction and underground diaphragm wall construction; and (3) construction for cap beam, and then carrying out excavation on the lower-part foundation pit through combining a well-point dewatering construction method and arranging a bracing system in the excavated lower-part foundation pit. The construction method disclosed by the invention has the advantages of reasonable design, simplicity and convenience for construction, safety and reliability for construction and good construction effect, high construction quality and capability of effectively solving the practical problems, such as high difficulty for construction, complicated construction procedure, difficulty for ensuring the construction quality of deep foundation pits and the like, in a process of constructing the deep foundation pits for subway stations in the collapsible loess areas.
Owner:CHINA RAILWAY 20 BUREAU GRP

Artificial fish reef throwing method for open sea area

The invention relates to an artificial fish reef throwing method for an open sea area, relating to the technical field of artificial fish reef construction and aiming to solve the technical problems on increasing throwing efficiency and throwing precision. The method comprises the following specific steps of: (1) setting the GPS coordinates of the planned throwing point of an individual fish reef, and sailing a positioning ship against the current to the planned throwing point; (2) firstly, finding out the coordinate position of the planned throwing point at the bow of the positioning ship, sailing the positioning ship against the current away from the planned throwing point, anchoring, and putting a floating ball marker tied with a floating rope into water so that the floating ball marker floats on the coordinate position of the planned throwing point; (3) sailing a throwing ship against the current to the side of the floating ball marker, and anchoring in a head and tail anchor dropping mode; and (4) throwing the individual fish reef on the throwing ship to the throwing point marked by the floating ball marker by using hanging and throwing equipment. The method provided by the invention can improve the construction effect of the artificial fish reef.
Owner:SHANGHAI OCEAN UNIV

Drain board used for reclaimed coastal region treatment and construction method

The invention discloses a drain board used for reclaimed coastal region treatment and a construction method. The drain board comprises a drain board body, wherein first draining grooves are uniformly distributed on the drain board body; second draining grooves are uniformly distributed on the drain board body; the second draining grooves communicate with the first draining grooves; and draining holes are uniformly distributed on the drain board body. Meanwhile, the construction method applying the drain board comprises the following steps: (a), measuring and setting out; (b), site levelling; (c), setting cushion laying; (d), pile lofting; (e), drain board laying; (f), cleaning and cutting off; (g), sand pouring and pit filling; (h), geotechnical cloth laying; (i), plastic film mulching and air exhausting; and (j), settlement observation plate burying. The drain board and the construction method have the advantages that the draining capacity is high; the application range is wide; the labor intensity is small; construction cost is reduced; construction is convenient; construction efficiency is high; project construction cost can be lowered, and the project construction cycle is shortened; and the investment benefit of the project is enhanced.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Pulsating load temporary blocking fracture simulation device and method

The invention discloses a pulsating load temporary blocking fracture simulation device and method. The pulsating load temporary blocking fracture simulation device comprises displacement pumps, intermediate containers, a pulsating load generation device, a simulation wellbore, simulation cracks, a device for measuring the amount of a temporary blocking agent, devices for measuring the amount of atemporary blocking agent at the positions of the simulation cracks and a control center, wherein the displacement pumps are connected with the input ends of the intermediate containers, the output ends of the containers are connected with the input end of the pulsating load generation device, and the output end of the pulsating load generation device is connected with the simulation wellbore whichis connected with the simulation cracks; the simulation wellbore is further connected with the device for measuring the amount of the temporary blocking agent, the simulation cracks are connected with the devices for measuring the amount of the temporary blocking agent at the positions of the simulation cracks respectively, and the displacement pumps, the pulsating load generation device, the device for measuring the amount of the temporary blocking agent and the devices for measuring the amount of the temporary blocking agent at the positions of the simulation cracks are separately connectedwith the control center.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Tunneling construction method of pipe-jacking machine

PendingCN109763828AImprove construction effectSolve the poor construction effectTunnelsTunnel constructionEngineering
The invention provides a tunneling construction method of a pipe-jacking machine. The tunneling construction method of the pipe-jacking machine comprises the following steps: performing prediction calculation on tunneling parameters of the pipe-jacking machine according to a burying depth of the pipe-jacking machine, a geological condition and an environmental condition; monitoring ground settlement and deformation conditions during working of the pipe-jacking machine, and verifying the predicted tunneling parameters according to a monitoring result, wherein the tunneling parameters comprise asoil pressure value; a theoretical calculating formula of the soil pressure value is as follows: P0=K x gamma x H, where P0 is a theoretical calculating value of front soil pressure of the pipe-jacking machine, K is a lateral pressure coefficient of soil, gamma is the volume weight of the soil, and H is an influence depth of pipe jacking; an actually adopted soil pressure value is P, a prepared pressure is P1, and a calculating formula of an actual soil pressure value is: P=P0+P1. According to the tunneling construction method of the pipe-jacking machine, provided by the invention, the problem of poor tunneling construction effect of the pipe-jacking machine in the prior art can be solved.
Owner:CHINA RAILWAY SHISIJU GROUP CORP

Light steel structure factory building construction profile steel building treatment method

The invention relates to a light steel structure factory building construction profile steel building treatment method. The light steel structure factory building construction profile steel building treatment method adopts a steel structure factory building construction profile steel building device as follow, the steel structure factory building construction profile steel building device comprises a connecting frame, a placement plate, a locking mechanism, an adjusting rod and a clamping mechanism; and the steel structure factory building construction profile steel building treatment method adopting the steel structure factory building construction profile steel building device comprises the following steps of S1, building a scaffold; S2, locking the building device; S3, preparing beforechannel steel placement; S4, placing channel steel; S5, locking the channel steel; and S6, welding the channel steel. According to the light steel structure factory building construction profile steelbuilding treatment method, the existing problems that when steel structures with inclined roofs are built, channel steel in plane butt joint cannot be mutually clamped, so that the butt joint stability of the steel structures is poor and sliding of the channel steel occurs in the welding process; and the channel steel only can be in butt joint with one set of the channel steel, and after weldingis completed, splicing the remaining steel structures is carried out, so that the overall flatness of the steel structures is poor can be solved.
Owner:广东粤驰建工科技集团有限公司

Building formwork system

The invention discloses a building formwork system. The building formwork system comprises a template and a support frame for supporting the template, and is characterized by further comprising a hollow plastic plane support profile with a T-shaped cross section, and a hollow plastic corner support profile with an L-shaped cross section, wherein cooling lightening holes are formed in the plane support profile and the corner support profile; the upper part of the plane support profile extends to two sides to form wing plates; multiple construction through holes are formed in the wing plates; the plane support profile is fixed on the surface of the template through the construction through holes, or is connected with the template with the adjacent plane; and the corner support profile is disposed at the corner of the adjacent template for support. The building formwork system uses the plane support profile and the corner support profile for replacing wood bars, so that the cost is low; the utilization rate is high; the wood resource is saved; and the construction efficiency is high.
Owner:浙江信得宝建筑新型材料有限公司

Electric power engineering design review and technical economy review information system

The invention provides an electric power engineering design review and technical economy review information system. The electric power engineering design review and technical economy review information system comprises the following technical routes including development based on JavaEE architecture, architecture design based on SOA and a data distributed caching technology. According to the electric power engineering design review and technical economy review information system, historical engineering design documentation and data within the range of an electric power company are collected and managed in a unified mode, the safety of core business data is guaranteed, and the application value of the data is improved; historical engineering is used as a comparison basis, the project design level and the review measurement level are unified, engineering design management is enhanced, and the construction capacity of a power grid is fully improved; experts are assisted in rapidly reviewing a design scheme and the reasonability of engineering construction cost and analyzing the fluctuation trend of construction cost through comparison and early warning of key indexes and construction cost, and the professional review quality of project design is improved.
Owner:STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RES INST +1

Semi-automatic shipborne throw-sowing device of submerged plants and throw-sowing workboat

PendingCN111034419AControl the planting distanceControl densitySowingCultivating equipmentsElectric machineryEngineering
The invention discloses a semi-automatic shipborne throw-sowing device of submerged plants and a throw-sowing workboat. The throw-sowing device includes a shipborne stand, a support mechanism which isfixed on the shipborne stand, a throw-sowing plate which is arranged above the support mechanism and a transmission mechanism, wherein a power source and a motor are fixed on the shipborne stand, therotating shaft of the motor is connected with the transmission mechanism, the two ends of the throw-sowing plate are clamped and fixed on the transmission mechanism separately, and the transmission mechanism is fixed on the support mechanism; and a control box is fixed on the support mechanism, and the control box is electrically connected with the motor and the power source separately. The semi-automatic shipborne throw-sowing device of submerged plants and throw-sowing workboat have no limitation of the water depth and no influences of the size of boats, and have a wide application range; application of labor can be reduced greatly through semi-automatic mechanized throw sowing, and the planting distance, planting density and planting quantities of the submerged plants can be controlledeffectively, so that the throw sowing construction mode of the submerged plants is optimized, and the problem of a low survival rate of the submerged plants is solved fundamentally.
Owner:SHANGHAI LANDSCAPE ARCHITECTURE DESIGN INST

Surface finishing and film covering all-in-one machine

The invention relates to a surface finishing and film covering all-in-one machine, and belongs to the technical field of road and bridge construction machinery. The machine comprises a surface finishing part and a film covering part adopting a longitudinal film covering mode; and the surface finishing part comprises a main frame, longitudinal walking mechanisms arranged at the two ends of the mainframe and a troweling surface finishing mechanism arranged at the lower end of the main frame. The longitudinal walking mechanisms are connected with the main frame through a lifting mechanism, and the troweling surface finishing mechanism is driven by a linear moving mechanism to transversely move along the main frame. The film covering part comprises a connecting frame, a maintenance film crossrod and a height-adjustable pressing roller, wherein the connecting frame is arranged behind the main frame, and the maintenance film cross rod is hinged to the pressing roller at the rear end of theconnecting frame; and the maintenance film is sleeved on the maintenance film cross rod and downwards penetrates through the pressing roller to be paved on the concrete surface after surface finishing. According to the machine, integrated construction of trowelling surface finishing and film covering of the concrete pavement can be achieved, film covering maintenance can be conducted in time after trowelling surface finishing, and thus the overall construction effect of the concrete pavement is improved.
Owner:河北星斗机械科技有限公司

Roof rainwater runoff pollutant concentration calculation method and controlled release application thereof

ActiveCN111047180AReflect the changing law of concentrationAdequate experimental basisGeneral water supply conservationResourcesRoof runoffWater quality
The invention belongs to the technical field of resources and environments. An existing method for calculating the roof runoff pollutant concentration through a water quality model is greatly different from reality in the application process, and aiming at the problem in the prior art, the invention discloses a roof rainwater runoff pollutant concentration calculation method, which comprises the following steps of: firstly, defining a typical rain pattern formula of regional rainfall, obtaining a change rule of rainfall of the region in different rainfall recurrence periods through the rain pattern formula, and applying the rule to subsequent steps; secondly, designing a rainfall recurrence period P and a session rainfall duration T of the region, collecting the number Td of sunny days inthe earlier stage of rainfall of the region, selecting a certain roof as an object, and defining the length L and the gradient theta of the roof; and calculating confluence time tc by a formula 2, andselecting a corresponding pollutant concentration calculation formula to describe the change process of the roof runoff pollutant concentration along with time according to the confluence time tc. The computational formula is high in scientificity and high in correlation with experimental data.
Owner:TONGJI UNIV

Double-core hidden leading-in optical cable

The invention relates to a double-core hidden leading-in optical cable, and the optical cable comprises a sheath and optical fibers wrapped by the sheath. The optical cable is characterized in that the interior of the sheath is provided with two optical fibers in a parallel manner at an interval; the optical fibers are respectively wrapped by a tight sleeve layer; the adjacent sides of the tight sleeve layers of the two optical fibers are connected to form an 8-shaped tight sleeve layer; the 8-shaped tight sleeve layer is formed by the tight wrapping of transparent nylon, thereby forming an 8-shaped transparent nylon tight sleeve layer. According to the invention, the separated 8-shaped transparent nylon tight sleeve layer double-core optical fibers can directly enter a room for laying. The optical cable is convenient to lay, is easy to separate, is good in protective properties, is transparent, is good in hiding performance, and is good in construction effect. The optical cable is simple in structure, is easy to manufacture, is convenient to lay and use, and is especially suitable for occasions, in which the requirements for hiding performances are higher, of two-point following optical fiber home entry and optical fiber-to-desktop.
Owner:YANGTZE OPTICAL FIBRE AND CABLE JOINT STOCK LIMITED COMPANY

Novel combined ecological seawall structure and manufacturing method thereof

The invention discloses a novel combined ecological seawall structure. The novel combined ecological seawall structure comprises an oyster reef Bragg submerged dike wave resisting structure on the near-sea side and coastal wetland plants on the near-shore side; the coastal wetland plants are located in an intertidal zone right behind the oyster reef Bragg submerged dike wave resisting structure; the oyster reef Bragg submerged dike wave resisting structure is composed of a plurality of alloy cage oyster reefs which are arranged transversely and longitudinally periodically; the periodic extension direction of the alloy cage oyster reefs in the transverse direction is consistent with the incident wave direction; the distance between every two adjacent alloy cage oyster reefs is equal to the width of each alloy cage oyster reef, and the sum of the distance between every two adjacent alloy cage oyster reefs and the width of each alloy cage oyster reef is positive integer multiples of half of the wavelength of incident waves; the periodic extension direction of the alloy cage oyster reefs in the longitudinal direction is perpendicular to the incident wave direction; and the distance between every two adjacent alloy cage oyster reefs is not larger than half of the length of each alloy cage oyster reef. According to the novel combined ecological seawall structure and a manufacturing method thereof, the wave eliminating capacity can be improved, the shore can be effectively protected, the near-shore ecological environment can be repaired and protected, and a near-shore ecological system can be maintained.
Owner:HOHAI UNIV

Multi-source heterogeneous data aggregation system of urban information model

The invention discloses a multi-source heterogeneous data aggregation system of a city information model, and belongs to the technical field of data aggregation. The system comprises an Internet cloud server, the output end of the Internet cloud server is connected with an integration processor, the output end of the integration processor is in communication connection with an application building host, and the output end of the application building host is connected with an application display APP host. According to the invention, a space-time basic data module, a resource survey data module, a planning management and control data module, an engineering construction project data module, a public thematic data module and an internet-of-things perception data module are adopted to carry out information acquisition and processing, so that multi-source heterogeneous data aggregation and treatment are completed; data application and business integration in the aspects of city planning, city management, smart city construction and the like are further expanded, the intuition and the space sense of city expression are improved through the combination of geospatial information data, visualization and a functional technology platform, and a convenient platform carrier is provided for economic and social development.
Owner:苏州市测绘院有限责任公司

Fan coil side air supply header and mounting method

The invention discloses a fan coil side air supply header and a mounting method. The fan coil side air supply header includes an air hose header, a fan coil, a fan coil air supply pipe, a flange connection device and a new air hose. The fan coil side air supply header solves the problem of connection between the fan coil side air supply air hose and the new air hose and the air inlet, reduces system air leakage, ensures the system design parameters and effect and reduces engineering cost. Compare with the traditional soft connection mode, the header mounting mode can save cost by 16.28% and has an obvious economical effect; construction is not limited by materials and position space, and the fan coil side air supply header is processed at random according to the site, and is convenient to operate and install at site, tight and reliable in connection and good in construction impression effect.
Owner:青建集团股份公司

Wet sand water retention transplant method and application

The invention provides a wet sand water retention transplant method and application, and belongs to the field of seedling transplant. The method comprises the steps that river sand is poured with water in a completely permeable manner, and spare sand is obtained. The spare sand is decked on the bottom of planting pits, and a padded sand layer is formed. Seedlings are transplanted into the planting pits, the lower parts of the seedling roots are allowed to make contact with the padded sand layer. The planting pits are filled with spare sand to flood over the neck parts of the seedling roots, and a root-burying sand layer is formed. Root setting water is poured until the water surface covers the root-burying sand layer. The top of the root-burying sand layer is covered with soil, and a soil layer is formed and water is poured in a completely permeable manner. The wet sand water retention transplant method is simple in operation, high in survival rate of transplanted seedlings, and good in growth condition of root system. The method is applied in the construction of tea gardens and orchards and the like of hardened soils, is good in construction effect, and high in outcome at a later stage.
Owner:黔东南苗族侗族自治州农业科学院

Automatic arch supporting adjustment control device and method for arch frame trolley

The invention discloses an automatic arch supporting adjustment control device and method for an arch frame trolley, and the device comprises a man-machine interaction unit, a sensing signal collection unit, a control unit and a signal output unit, and is characterized in that an inclination angle sensor is arranged on a pre-installed arch frame, and the posture of the arch frame after being fixedon a tunnel surface is determined according to the tunnel construction parameter requirements; and then the current posture of the arch frame is detected in real time in the installation process, thearm frame joint movement of the arch frame trolley is automatically adjusted through the difference value of the angles (the horizontal direction angle and the vertical direction angle) correspondingto the two postures, when the arch frame is in place, the posture of the arch frame can meet the tunnel construction parameter requirement, the construction effect can be improved, and the labor intensity of an operator can be reduced.
Owner:CHANGSHA KEDA INTELLIGENT EQUIP INC CO

A processing method for constructing profiled steel in a light steel structure factory building

The invention relates to a light steel structure factory building construction profile steel building treatment method. The light steel structure factory building construction profile steel building treatment method adopts a steel structure factory building construction profile steel building device as follow, the steel structure factory building construction profile steel building device comprises a connecting frame, a placement plate, a locking mechanism, an adjusting rod and a clamping mechanism; and the steel structure factory building construction profile steel building treatment method adopting the steel structure factory building construction profile steel building device comprises the following steps of S1, building a scaffold; S2, locking the building device; S3, preparing beforechannel steel placement; S4, placing channel steel; S5, locking the channel steel; and S6, welding the channel steel. According to the light steel structure factory building construction profile steelbuilding treatment method, the existing problems that when steel structures with inclined roofs are built, channel steel in plane butt joint cannot be mutually clamped, so that the butt joint stability of the steel structures is poor and sliding of the channel steel occurs in the welding process; and the channel steel only can be in butt joint with one set of the channel steel, and after weldingis completed, splicing the remaining steel structures is carried out, so that the overall flatness of the steel structures is poor can be solved.
Owner:广东粤驰建工科技集团有限公司

AIX operating system installation method, apparatus, device and medium

The embodiment of the invention discloses an AIX operating system installation method, an apparatus, a device and a computer-readable storage medium. The method comprises the following steps: after the device to be installed is started normally, the AIX operating system inserted in the backup master disk of the device to be installed is booted to back up the files, and the script information in the backup files is executed in the designated directory, thereby completing the installation of the AIX operating system of the device. The backup file includes the complete file of the AIX operating system to be installed and script information for its configuration parameters. The backup file saves AIX operating system successfully configured in the current hard disk through backup storage command, and restores the backup file to the backup master disk according to the storage directory of the backup file and the identification information of the backup master disk. The technical proposal ofthe application shortens the system installation time and reduces the human time cost, especially for the scenario of large-scale equipment installation and configuration, greatly improves the efficiency of operating system installation, and is conducive to improving the construction performance of the whole cloud computing data center.
Owner:ZHENGZHOU YUNHAI INFORMATION TECH CO LTD

Drainage board and construction method for treatment of tidal flat reclamation area

The invention discloses a drain board used for reclaimed coastal region treatment and a construction method. The drain board comprises a drain board body, wherein first draining grooves are uniformly distributed on the drain board body; second draining grooves are uniformly distributed on the drain board body; the second draining grooves communicate with the first draining grooves; and draining holes are uniformly distributed on the drain board body. Meanwhile, the construction method applying the drain board comprises the following steps: (a), measuring and setting out; (b), site levelling; (c), setting cushion laying; (d), pile lofting; (e), drain board laying; (f), cleaning and cutting off; (g), sand pouring and pit filling; (h), geotechnical cloth laying; (i), plastic film mulching and air exhausting; and (j), settlement observation plate burying. The drain board and the construction method have the advantages that the draining capacity is high; the application range is wide; the labor intensity is small; construction cost is reduced; construction is convenient; construction efficiency is high; project construction cost can be lowered, and the project construction cycle is shortened; and the investment benefit of the project is enhanced.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Method for testing bonding strength of emulsified asphalt

The invention discloses a method for testing the bonding strength of emulsified asphalt. The method comprises the following steps: prefabricating an asphalt mixture rut plate; uniformly brushing the adhesive layer material on the asphalt mixture track plate; wherein the bonding layer material comprises but is not limited to spraying type emulsified asphalt or modified emulsified asphalt; adhering one or more spindles matched with a drawing instrument to the surface of the brushed adhesive layer material; vertically drawing the spindle by adopting an adhesive force drawing instrument, and reading a test value; and taking the average value of one group of test values or a plurality of groups of test values as the bonding strength of the bonding layer material. According to the invention, the effect of the adhesive layer emulsified asphalt after spraying can be effectively simulated, and the bonding effect of the spraying type emulsified asphalt can be preliminarily judged; the construction quality can be effectively detected, the usage amount of the spraying type emulsified asphalt is controlled, and technical guidance is provided for specific construction materials and construction processes.
Owner:西安华泽道路材料有限公司

Blockage degree assessment method and device

The invention provides a blockage degree assessment method and device. The method comprises the steps that before a profile control and displacement agent is injected into a water injection well, static parameters, including oil reservoir static pressure of the water injection well, an inner diameter of an operating tool string in the water injection well and middle depth of a layer which the agent is about to be injected into are acquired; while the profile control and displacement agent is injected into the water injection well, a dynamic data sequence of changes of parameters, including injection pressure of the profile control and displacement agent, displacement of the water injection well, density of the profile control and displacement agent and viscosity of the profile control and displacement agent over time is collected; and a dynamic data sequence of friction losses of the profile control and displacement agent in the water injection well is calculated according to the parameters, a dynamic data sequence of dynamic inhalation indexes is calculated, and the blockage degree is assessed according to the dynamic data sequence of the dynamic inhalation indexes. Due to the fact that influences of displacement changes of the water injection well are considered in the dynamic data sequence of the dynamic inhalation indexes, the accuracy of blockage degree assessment is improved, and the construction effect is improved.
Owner:PETROCHINA CO LTD

Pipe-following dual-power rock breaking construction structure with all casing and down-the-hole hammer

The invention relates to the technical field of down-the-hole rock breaking construction structures, and discloses a pipe-following dual-power rock breaking construction structure with an all casing and a down-the-hole hammer. The pipe-following dual-power rock breaking construction structure comprises a drilling machine, the all casing, a pipe shoe and the down-the-hole hammer, the all casing and the pipe shoe are arranged in a connected mode, the lower portion of the down-the-hole hammer is arranged on the all casing in a penetrating mode and extends to the interior of the pipe shoe, the lower portion of the down-the-hole hammer and the pipe shoe are fixedly arranged in a meshing mode or movably arranged in a separated mode, and the upper portion of the down-the-hole hammer and the drilling machine are arranged in a connected mode, the drilling machine comprises an inner power device and an outer power device, the outer power device is used for providing pressurizing force and rotation power for the pipe shoe, the inner power device is used for providing reciprocating impact force for the down-the-hole hammer, a plurality of drilling teeth are arranged on the lower portion of the pipe shoe and used for breaking a rock stratum to form a rock core, the down-the-hole hammer is used for breaking the rock core, the down-the-hole hammer drills to drive the pipe shoe to be arranged in a synchronous drilling mode, and a height difference exists between the drilling teeth and the down-the-hole hammer. The inner power device and the outer power device are adopted to cooperate, and therefore drilling construction and chiseling construction are combined, rock stratum breaking is facilitated, and the construction effect is greatly improved.
Owner:SHENZHEN GONGKAN GEOTECHN GRP +1

Method for determining design thickness of newly-built drainage pavement

The invention belongs to the technical field of pavement engineering, and particularly relates to a method for determining the design thickness of a newly-built drainage pavement. The method comprises the following steps: S10, determining a runoff coefficient range value of a newly-built drainage pavement according to the rainfall condition of an urban area; s20, designing a permeability coefficient detection model, and drawing a linear relation curve between the runoff coefficient and the pavement thickness; and S30, comparing the runoff coefficient range value and combining the linear relation curve to obtain a thickness design value of the newly-built drainage pavement. The invention aims to provide the method for determining the design thickness of the newly-built drainage pavement, and the method can effectively guide a design department to design and stipulate the thickness of the drainage asphalt pavement in a certain region, so that the construction capital is reasonably matched.
Owner:SHANGHAI PUDONG ROAD & BRIDGE GRP CO LTD

Ship-borne water surface garbage recovering device

The invention discloses a ship-borne water surface garbage recovering device. The ship-borne water surface garbage recovering device comprises a ship-borne main frame, a supporting arm, a stress-bearing rotating arm, a tacked fixing plate, a recovery bearing frame, a closing plate, a nylon net, a bow return hook, a stern return hook and a nylon rope, wherein the ship-borne main frame is horizontally arranged, the supporting arm is perpendicularly arranged on the ship-borne main frame, a sliding wheel is arranged at the top end of the supporting arm, the recovery bearing frame is connected withthe ship-borne main frame through the stress-bearing rotating arm, the bow return hook is arranged on the stress-bearing rotating arm, the stern return hook is arranged at the other end of the ship-borne main frame, one end of the nylon rope is fixed on the bow return hook, and the other end of the nylon rope is fixed on the stern return hook through the sliding wheel. The ship-borne water surface garbage recovering device can be used in both rivers and lakes, is not limited by the water depth, is not influenced by the size of a construction ship, and has wide application range; and floatinggarbage on the water surface is collected by using the ship-borne water surface garbage recovering device, so that the adoption of workers is reduced, manpower and material resources are saved, and the clearing time is effectively shortened.
Owner:SHANGHAI LANDSCAPE ARCHITECTURE DESIGN INST

Cable bridge end structure and construction method for cable bridge to pass through fire compartment

The invention provides a cable bridge end structure, and the structure comprises a bridge with three baffle plates. The end parts of the baffle plates are each provided with an everted end, and the everted ends form 90-degree bent left end face, right end face and lower end face, wherein three end faces are respectively provided with a plurality of installation holes. The invention also provides aconstruction method for a cable bridge to pass through a fire compartment, and the method comprises the steps: 1, separating the welding points of the three baffle plates of a cable bridge end by a certain length L; 2, enabling the separated ends to be everted by 90 degrees, and forming the left end face, the right end face and the lower end face; 3, sleeving a wall pre-buried steel pipe part through a bridge, enabling the left end face, the right end face and the lower end face to be attached to the surface of a wall, and fixing the left end face, the right end face and the lower end face through steel nails; 4, carrying out the filling of a fireproof material and the end blocking after the arrangement of the cable; 5, performing the covering through a bridge cover plate. The method greatly enlarges the contact area of the cable bridge and the wall, does not need to carry out the filling of the fireproof material at the inner sides of the baffle plates, is quick in construction, is large in contact area, and is good in fireproof and sealing effect. Moreover, the appearance is regular, neat and beautiful.
Owner:CHINA 22MCC GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products