Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

130results about How to "Timely support" patented technology

Overlarge mining height hydraulic support

The invention relates to a super large mining height hydraulic support which comprises an opened rigid integrated base, wherein, two double-telescopic hydraulic upright posts are arranged on the base, and the upper ends of the upright posts are connected with a top beam; the rear of the top beam is connected with a screening beam; an edge protection device is connected with the telescopic beams which are in inner extension connection with the top beam; a balance jack is arranged between the top beam and the screening beam; the screening beam and the base are respectively connected with the front and rear connecting rods; a push jack is arranged on the base and is connected with a push rod; the front part of the top beam is provided with the telescopic beams, the middle part of the top beam is provided with a falling prevention device for the support, and bottom lifting, skid prevention and support regulation devices are arranged on the base; and a levelling device is arranged on a cross binding head on the front end of the push rod; the support adopts 2-meter width between centers, the maximum height ranges from 6.3 meters to 7.5 meters, and the front end of the telescopic beam is provided with a third-stage edge protection device which is not lower than half of the mining height. The support has obvious effects of controlling the wall caving of the coal wall of a super thick coalseam, the roof fall of the ceiling, and the stability of the hydraulic support.
Owner:CCTEG COAL MINING RES INST

Tunnel self-advancing support shed

ActiveCN102628368ATo achieve the effect of safety supportTimely supportMine roof supportsTunnel liningStructural engineering
The invention discloses a tunnel self-advancing support shed which comprises a front arch frame, a rear arch frame, an advancing jack and supporting jacks, wherein the front arch frame comprises more than three front longitudinal beams and more than three front arch beams, all front longitudinal beams are longitudinally arranged along the arch upper surfaces of the front arch beams, each front longitudinal beam is connected with all the front arch beams, and one supporting jack is arranged under the front arch frame; the rear arch frame comprises more than three rear longitudinal beams and more than three rear arch beams, all rear longitudinal beams are longitudinally arranged along the arch upper surfaces of the rear arch beams, each rear longitudinal beam is connected with all the rear arch beams, and the other supporting jack is arranged under the rear arch frame; the front longitudinal beams and the rear longitudinal beams are arranged at intervals, and a spacing distance is arranged between a front arch beam and an adjacent rear arch beam in the front; and one end of the advancing jack is connected with the front arch frame, the other end of the advancing jack is connected with the rear arch frame, and the front arch beams and the rear arch beams are all arch beams. With the adoption of the tunnel self-advancing support shed, time and labor are saved, and safety and reliability are realized.
Owner:李信斌

Low voltage traversing control method for double feeding wind power generator when short circuit failure of electric network

The invention discloses a low voltage ride-through control method of a doubly fed induction aero-generator, which is used when a power network has short circuit faults. The control method is characterized in that a rotor exciting voltage positive-sequence control current and a rotor exciting voltage negative-sequence control signal are respectively formed through limiting a rotor slip frequency current and a rotor (2-s) rated frequency current when the power network has faults, and a generator is utilized for realizing the attenuation of stator flux transient DC components and reducing the rotor side influences of the stator flux transient components, positive-sequence components and negative-sequence components. The control method has the advantages that no hardware protecting device is required to be added; under the condition that the power network has symmetrical and asymmetrical faults, the overcurrent occurrence of the rotor can be effectively restrained, and the safe operations of the generator and a rotor exciting converter are protected; in the process that the power network has the faults, the transient generator impact to the power network and a mechanical system can be effectively reduced; the normal operation of the generator can be fast recovered after the faults are removed, and the timely support to the power network can be realized.
Owner:CHONGQING UNIV

Cutting head type shortwall coal-winning machine and comprehensive mechanized coal mining technology

The invention discloses a cutting head type shortwall coal-winning machine and comprehensive mechanized coal mining technology. A tunneller type cutting device is used, and the coal-winning machine is a hydromechatronics coal-winning machine which is in electric traction, electrically drags a cutting head, carries out hydraulic drive to change a cutting arm pitch angle and swings inside and outside the working face. The coal-winning machine mainly comprises a machine body, a cutting device, a travelling mechanism, a coal shovelling device, an auxiliary device, an auxiliary hydraulic system and an electrical control system. The coal-winning technology uses technical equipment, such as a coal-winning machine, a hydraulic support, a scraper conveyor, an elevating conveyor, a breaker, a crossheading belt, an advance support hydraulic support and the like. The technical flow is as follows: the coal-winning machine retracts to the working surface tail, a scraper-trough conveyer is pushed tocoal wall, coal is cut to the machine head, the machine is retracted, coal is cleaned, and the support is pulled. The coal-winning machine has compact structure, small volume and weight, strong adaptability and convenient installation and transportation, can solve a series of problems of four low, three high, two long and one poor in small and medium coal mining technology and provides matching coal mining technology.
Owner:闫振东

Hydraulic walking multi-level temporary supporting equipment for advancement of tunnel

The invention belongs to the technical field of equipment for advancement production of coal mines, and particularly relates to hydraulic walking multi-level temporary supporting equipment for advancement of a tunnel, which aims to realize safe and fast advancement of coal mine advancing tunnels. Single supports, which are located on the same side, of a walking support group and a temporary support group are serially connected onto a guide track and can slide relative to the guide track, and single supports located on the left side and the right side of the walking support group and single supports located on the left side and the right side of the temporary support group are connected with a pushing mechanism capable of pushing the single supports to move longitudinally. The hydraulic walking multi-level temporary supporting equipment has the advantages that safety of supporting operation is greatly improved; timely supporting of the supporting equipment can be guaranteed when the grade of the tunnel is changed; and the supporting equipment is an integral structure, runs independently and saves time, labor and space.
Owner:SHANXI DATONG UNIV

Excavation method for tunnel passing through high-angle thrust water-rich and sand-rich fault

The invention discloses an excavation method for a tunnel passing through a high-angle thrust water-rich and sand-rich fault. A construction tunnel hole is divided from the top to the bottom into an upper hole body, a central hole body, and a lower hole body, wherein the upper hole body is divided into a left guide hole and a right guide hole. A primary support structure of the tunnel hole is a double-layer primary support structure. During the excavation of the construction tunnel, the construction tunnel is divided into a plurality of tunnel segments from the back to the front for excavation. During the excavation of any one tunnel segment, the method comprises the steps: 1, performing the excavation of the upper hole body and the primary supporting; 2, performing the excavation of the central hole body and the primary supporting of an outer layer; 3, performing the excavation of the lower hole body and the primary supporting of the outer layer; 4, performing the primary supporting of an inner layer; 5, repeatedly performing the steps 1-4 for many times, and completing the excavation of the tunnel. The method is simple in step, is reasonable in design, is convenient for construction, is good in use effect, employs a three-step method for the excavation of the tunnel hole, employs double primary support structure for the full-section support of the tunnel hole after excavation, and can guarantee the safety of the tunnel structure later.
Owner:CHINA RAILWAY 20 BUREAU GRP

Tank truck side turn supporting device and control method thereof

The invention discloses a tank truck side turn supporting device and a control method thereof. The device is provided with a control system, a horizontal supporting rod and a vertical supporting rod,wherein the horizontal supporting rod is driven by a horizontal driving device; the vertical supporting rod is driven by a vertical driving device. The side-tipping angle of the tank truck is monitored by the control system, and when the tank truck has side turn, the horizontal supporting rod and the vertical supporting rod are controlled to rapidly extend out, so that the vehicle is supported, and the problem that the conventional device cannot be supported when the side-tipping angle of the truck is too small or too large is effectively solved; and due to the synergistic action of the two supporting rods, the supporting rods can contact with the ground without extremely long extension, and the influence to adjacent lanes can be avoided. According to the control method, by comparing the side-tipping angle of the tank truck and a threshold value K, when the side-tipping angle is more than or equal to the threshold value K, the supporting device is controlled to extend out and support;and when the side-tipping angle is less than the threshold value K, the supporting rods are actively retracted when the vehicle is straightened, the tank truck can conveniently run normally after danger treatment, the influence to trafficability is avoided, and support can be provided in time during subsequent side turn of the tank truck.
Owner:HUAIAN COLLEGE OF INFORMATION TECH +1

Supporting and bar-arranging structure for arch bridge raking pile hole forming construction

The invention discloses a support and reinforcement structure for arch bridge raking pile hole forming construction. The support and reinforcement structure comprises a plurality of support frames, a plurality of first longitudinal connecting ribs, a plurality of second longitudinal connecting ribs, a plurality of third longitudinal connecting ribs and a plurality of fourth longitudinal connecting ribs, wherein the support frames are supported in a raking pile hole, and the first longitudinal connecting ribs, the second longitudinal connecting ribs, the third longitudinal connecting ribs and the fourth longitudinal connecting ribs are laid along the excavation contour line of the raking pile hole; the support frames are laid on the length direction of the raking pile hole from front to back, are laid in parallel and are perpendicular to the raking pile hole, and the distance between every two adjacent support frames is 50-100cm; each support frame comprises an arc-shaped support and two side supports, the two side supports are respectively a left side support and a right side support symmetrically supported under the left side and the right side of the arc-shaped support. The support and bar-arranging structure has the advantages of being simple in structure, reasonable in design, convenient to construct and good in using effect. The excavated raking pile hole is effectively supported, and the ribs are arranged in the raking pile hole, so that the hole forming quality of the raking pile hole can be effectively ensured.
Owner:ZHONGJIAO TONGLI CONSTR

Tunnel excavation support structure for stratum with soft upper part and hard lower part and tunnel excavation construction method

The invention discloses a tunnel excavation support structure for a stratum with a soft upper part and a hard lower part and a tunnel excavation construction method, and belongs to the technical fieldof tunnel construction. The tunnel excavation support structure for the stratum with the soft upper part and the hard lower part is characterized by comprising an arch cover and hard rock at the lower layer of a tunnel, the arch cover is composed of a plurality of arched steel frames, a plurality of small guide pipes and a sprayed concrete layer, the arched steel frames are sequentially arrangedand connected together in the direction of the tunnel and fixed to the hard rock at the lower layer of the tunnel after the arch angle is increased, the small guide pipes are arranged at the arch toppart and driven into the soft stratum of the upper portion of the tunnel, the tails of the small guide pipes are welded to the arched steel frames, the sprayed concrete layer wraps the arched steel frames, and large arch feet are formed at arch foot parts. According to the tunnel excavation support structure, the strength of the arch cover is high, the arch feet of the arch cover are supported onthe stable bed rock on both sides, the load of the arch cover can be transmitted to the hard bed rock at the lower layer, the structure and a mountain can jointly resist the load, the construction safety can be ensured, and the construction efficiency can be improved.
Owner:RAILWAY NO 10 ENG GRP CO LTD

Three-pipe culvert incremental launching construction device and method

The invention discloses a three-pipe culvert incremental launching construction device and method. The construction device comprises an initial incremental launching equipment air compressor, a control valve and a plurality of sets of lining rubber rings; and the construction method comprises an initial incremental launching stage and a three-pipe incremental launching stage. During the initial incremental launching stage, a lining of the culvert entrance section is incremental launched for a distance by a hydraulic cylinder and rubber rings and enters into the three-pipe incremental launching stage; and after entering into the three-pipe incremental launching stage, every three linings are divided into a group and alternately move forwards under the pressure of the recirculate selected three tubes. According to the three-pipe method culvert incremental launching construction device and construction method, the obstruction of the culvert length to a traditional construction method is overcame, the movement of the hydraulic cylinder caused by a traditional incremental launching construction method is avoided, the culvert incremental launching construction is promoted to develop in the direction of mechanization, and the input of the linings is continuous. Therefore, the influence of the construction method on the culvert, the uplink rail of culvert and the road is greatly reduced.
Owner:CHANGAN UNIV

Construction method for tunnel passing through high-angle thrust water-rich and sand-rich fault

The invention discloses a construction method for a tunnel passing through a high-angle thrust water-rich and sand-rich fault. The method comprises the steps: 1, performing the preliminary excavationand the supporting construction of a rear tunnel segment; 2, performing the synchronous excavation and the supporting construction of the rear tunnel segment and a water drainage hole body of a waterdrainage hole; 3, performing the synchronous excavation and the supporting construction of the rear tunnel segment, the water drainage hole body of the water drainage hole and a rear detouring headingsegment; 4, performing the excavation and the supporting construction of a front water drainage hole body, a front heating segment and a central tunnel segment; 5, performing the excavation and the supporting construction of a front tunnel segment. According to the invention, the water on the upper wall of the fault is drained through a high-level water drainage hole between a tunnel front hole and a detouring heading pit, and the auxiliary water drainage is performed through the detouring heading pit, and the fault condition in front of the tunnel face of the front hole can be explored in advance, thereby guaranteeing the construction safety of each tunnel face. The method employs the three-step method for the excavation of the tunnel front hole, employs double preliminary supporting structures for the full-section supporting after excavation, can guarantee the safety of the tunnel structure later, and shortens the construction cycle.
Owner:CHINA RAILWAY 20 BUREAU GRP

Four column protected type hydraulic prop frame for low position blasting down the roof coal

InactiveCN101105136AHigh recovery rateCoal discharge effect is goodDust removalFire preventionEngineeringCoal
The invention discloses a four-leg shield-type sublevel caving hydraulic support, which comprises four supporting hydraulic extension legs equipped on a pedestal. The top ends of the four supporting hydraulic extension legs are respectively hinged with a top beam; a forward extension beam is hinged at the front end of the top beam; a sprag is hinged at the front end of the forward extension beam, a sprag lifting jack is equipped on the forward extension beam, an ejector rod of the sprag lifting jack is hinged with the back part of the sprag; the back part of the top beam is hinged with the upper part of a shield beam; the lower part of the shield beam is hinged with the pedestal via the a four-bar linkage mechanism; a tail beam with box-shaped construction is hinged with the lower end of the shield beam, a tail beam lifting jack is equipped between the lower part of the tail beam and the lower part of the shied beam; and a slide track, an inserting plate equipped in the slide track and a inserting plate lifting jack for driving the inserting plate to carry out reciprocating movement along the slide track are equipped in the box of the tail beam. The invention is especially suitable for caving integrated mining working face under pitching coal bed, flat-pitching half hard coal bed and 'three-soft' coal bed conditions.
Owner:ZHENGZHOU COAL MINING MACHINERY GRP

After-sales equipment predictive maintenance cooperation system based on digital twinning

The invention provides an after-sales equipment predictive maintenance cooperation system based on digital twinning, and the system comprises: a construction module which is used for constructing a cooperative maintenance seven-dimensional model based on digital twinning of an equipment manufacturer; an acquisition module which is used for acquiring and transmitting operation state parameters of the equipment based on a digital twinning collaborative maintenance seven-dimensional model; an analysis module which is used for carrying out prediction analysis on the collected equipment operation parameters based on the cooperative maintenance seven-dimensional model based on digital twinning to obtain a prediction result of the equipment; a judgment module which is used for judging whether thestate of the current equipment is normal or not according to the obtained equipment prediction result; a processing module which is used for carrying out preliminary diagnosis on an abnormal problemof the current equipment when the current equipment is judged to be in an abnormal state, so as to obtain a preliminary diagnosis result; and a display module which is used for visually displaying theoperation state, the prediction trend and the preliminary diagnosis result of the equipment to production operators and equipment maintenance participants in real time based on the cooperative maintenance seven-dimensional model based on digital twinning.
Owner:HANGZHOU DIANZI UNIV

Waist support seat capable of improving comfort

PendingCN111317286AUniform and long-lasting supportImprove comfortStoolsChairsHuman bodyPhysical medicine and rehabilitation
The invention relates to the field of seat design and manufacturing, in particular to design of a cushion, a backrest and a waist support of a seat. The invention is realized through the following technical scheme: the waist support seat capable of improving comfort comprises a foot support, a sitting stool, a backrest, a fixing frame connected with the foot support and a rotating frame rotationally connected with the fixing frame, the backrest is installed on the rotating frame, and a waist support used for supporting the waist of a human body is further installed on the rotating frame. The invention aims to overcome the defects in the prior art, and provides the waist support seat capable of improving the comfort. When a user moves back and forth on the seat, the waist support can clingto the waist and back of the human body to move synchronously and cling to the waist in real time, so that supporting force to the waist of the human body is increased.
Owner:ANJI SHENGXIN OFFICE FURNITURE

System and method for quickly positioning newly-added floating population in field of community treatment

The invention discloses a system for quickly positioning newly-added floating population in the field of community governance. The system comprises an access control machine, an access control card, an access control management module and a mobile client, and further comprises a face recognition module, a research and judgment analysis module, an alarm information module and a face recognition snapshot machine arranged on a unit door. The face snapshot machine comprises a plurality of cameras which are distributed at different heights and angles. The face recognition module is connected with the face snapshot machine and is used for carrying out photo capture on a video shot by the face snapshot machine, completing face recognition and comparing the face information with pre-stored face information of residents and family members; the research and judgment analysis module is connected with the entrance guard management module and the face recognition module, and judges whether an abnormal alarm is generated according to the face comparison result and the generation frequency; and the alarm information module is arranged between the research and judgment analysis module and the mobile client. According to the system for rapidly positioning the newly-added floating population in the community treatment field, rapid identification and early warning of the floating population are realized.
Owner:WUHAN HONGXIN TECH SERVICE CO LTD

Method and system of closed loop assessment for pipe body defects of long-distance oil and gas pipeline

The invention discloses a method and system of closed loop assessment for pipe body defects of a long-distance oil and gas pipeline, and relates to the technical field of pipeline systems. The assessment method comprises the following steps: 1) beginning; 2) recognizing and assessing the pipe body defects; 3) examining and verifying; 4) if the examination and verification are not pass, returning to recognize and assess the pipe body defects, and if the examination and verification pass, moving to a database firstly and then conducting defect repairing; 5) examining and verifying; 6) if the examination and verification are not pass, returning to defect repairing, and if the examination and verification pass, moving to the database firstly and conducting item-removing assessment; 7) finishing. According to the invention, a closed loop monitoring of defect recognizing and assessing, defect repairing and defect item-removing assessment for a pipe body can be achieved, the operation process of the defect closed loop assessment is simplified, related service information is integrated, accurate and reliable data support is provided for service management and decision, and defect item removing effect is effectively assessed.
Owner:PIPECHINA SOUTH CHINA CO

Loess tunnel foundation base reinforcing structure and method based on high pressure jet grouting piles

The invention discloses a loess tunnel foundation base reinforcing structure and method based on high pressure jet grouting piles. The structure comprises the multiple rows of high pressure jet grouting piles for reinforcing soil on the lower portion of a tunnel, and each high pressure jet grouting pile passes through a tunnel invert structure and a collapsible loess stratum from top to bottom andthen extends into a non collapsible loess stratum. The method comprises the following steps of firstly, tunnel excavating and preliminary bracing; secondly, second lining construction; and thirdly, foundation base reinforcing. The structure is reasonable in design, easy and convenient to construct and good in use effect. The multiple rows of high pressure jet grouting piles are adopted for carrying out foundation base reinforcing on a loess tunnel, a loess tunnel foundation base can be simply and rapidly effectively reinforced, the tunnel foundation base settling volume can be effectively controlled, meanwhile, the upper surface of a secondary lining inverted arch is adjusted to the horizontal plane, a construction platform is provided for the high pressure jet grouting piles, the loess tunnel foundation base reinforcing process can be further quickened, the high pressure jet grouting piles and the tunnel invert structure are fastened and connected into a whole, and the loess tunnel foundation base reinforcing effect can be further improved.
Owner:THE NO 6 ENG CO LTD OF CHINA RAILWAY 20TH BUREAU GRP

Data transmission method for electric transmission line wireless communication based on automatic power increasing retransmission mechanism

A data transmission method for electric transmission line wireless communication based on an automatic power increasing retransmission mechanism comprises the following steps that firstly, initial parameters are set, sensors are set to collect data one time every other Tc minutes and upload the data to a central node, and the sensors take turns to work circularly; a power increasing coefficient alpha1, a power increasing coefficient alpha 2 and a power increasing coefficient alpha 3 are set, wherein 0<alpha1<alpha 2< alpha 3<1, and the sensor transmitting power maximum value is Pmax; secondly, the communication establishing process of the sensor S1 and the central node comprises the steps that 2.1, when the S1 uploads the data to the central node, the automatic power increasing retransmission mechanism is adopted; 2.2, the communication establishing processes of the sensor S2, the sensor S3,...and the sensor Sn and the central node is like the establishing process of the first step. According to the data transmission method, the reliability can be improved, and the fluency can be enhanced.
Owner:ENJOYOR COMPANY LIMITED

Online monitoring and management method for enterprise environment

The invention relates to an online monitoring and management method for an enterprise environment, and belongs to the technical field of enterprise environment monitoring and management. According tothe technical scheme, an online monitoring and management platform for the enterprise environment is built; and each collected monitoring factor of each outlet of each area of a company is added to aninformation display module of the platform, and 24-hour real-time data of the monitoring factors are continuously updated. Different permissions are set for login users according to functions and posts of the platform users; and login time, an operation behavior and operation time of each user are recorded. The method breaks through the limitation of environment management time and regions, and provides real-time, objective and real environment monitoring information and environmental protection management information for enterprises to the largest extent, so that all levels of environmentalprotection managers can master the latest pollution source discharge condition and the environmental protection event disposal condition in first time, the current situation that the enterprise pollution discharge exceeds the standard and is not known and managed by persons is thoroughly eliminated, and the comprehensive decision and service management costs can be reduced.
Owner:WEIER AUTOMATION CO LTD TANGSHAN IRON & STEELGRP

Production welding method for support rebar trapezoid beam of laneway

A production welding method for a support rebar trapezoid beam of a laneway is characterized in that round straight rebar long beams are placed in a guide rail by a long beam charging device; round straight rebar short ribs are arranged in a positioning slot of the charging guide rail; the charging guide rail is moved under the action of a servo motor; when a welding point arrives between a left side electrode and a right side electrode, the charging guide rail is stopped, an upside press block compresses the round straight rebar short ribs, and the left side electrode extending from a cylinder at the rear left side and the right side electrode extending from a cylinder at the right side compress two sides of the round straight rebar long beams; when the electrodes are conducted, strong instant current generated between the electrodes at the left and right sides generates resistance heat under the action of the resistance of a rebar, so the welding point is melted to form a melting pool, after the circuit is disconnected and the welding point is cooled and solidified, the cylinders at left and right sides are returned in sequence, and the upside press bock is collected, thus finishing the welding of the round straight rebar short ribs; then the welding of the unwelded round straight rebar short ribs is finished in sequence. The production welding method is simple, the welding quality is reliable and the production efficiency is greatly improved.
Owner:TAIYUAN UNIV OF TECH

Large-section loess tunnel supporting system and supporting construction method

The invention discloses a large-section loess tunnel supporting system and a supporting construction method. The large-section loess tunnel supporting system comprises a tunnel forepoling structure, atunnel initial supporting structure and a tunnel secondary lining. The upper surface of an inverted arch secondary lining in the tunnel secondary lining is a horizontal plane, and an inverted arch backfill layer is arranged on the horizontal plane. The supporting construction method comprises the following steps of firstly digging a tunnel and conducting initial supporting; and secondly constructing the secondary lining and backfilling the inverted arch. The large-section loess tunnel supporting system is reasonable in design, easy and convenient to construct, high in construction efficiencyand good in use effect, the tunnel forepoling structure, the tunnel initial supporting structure and the tunnel secondary lining constitute a combined supporting system to stably and reliably supportthe large-section loess tunnel, the upper surface of the inverted arch of the secondary lining is adjusted to be a horizontal plane, the construction process of the inverted arch of the tunnel can beeffectively simplified, and the rigidity of the inverted arch of the tunnel is greatly improved; in this way, the construction efficiency of the tunnel secondary lining is improved, the ring sealingtime of the tunnel secondary lining is shortened, the integrity of the tunnel secondary lining is higher, and the overall force bearing effect is better.
Owner:CHINA RAILWAY 20 BUREAU GRP

Combination type tunnel lining, culvert or underground comprehensive pipe gallery

The invention discloses a combination type tunnel lining, a culvert or an underground comprehensive pipe gallery. The combination type tunnel lining, the culvert or the underground comprehensive pipe gallery comprises a pipeline formed by axially assembling unit plate pieces with radians in the circumferential direction. Each unit plate piece is provided with a pair of arc-shaped sides and a pair of straight sides. The arc-shaped sides are outwards folded to form cavity structures of which the periphery of each cross section is closed. The combination type tunnel lining, the culvert or the underground comprehensive pipe gallery has the advantages that the cavity structures of the comprehensive pipe gallery are formed by bending the cavity structures to form cavity pipe columns with the closed cross sections, auxiliary steel plates or blocking steel plates do not need to be additionally arranged, welding seams are reduced, and the strength of the cavity structures for forming arched beams is high; connecting pieces among the adjacent unit plate pieces of the comprehensive pipe gallery are all hidden inside structural pieces and do not need to be exposed inside a tunnel or the culvert, and the utilization rate of the internal space of the tunnel or the culvert is increased; in addition, operation holes are formed in the inner side of the pipe gallery, and splicing work can be easily competed by construction personnel only on the inner side of the pipe gallery.
Owner:NANJING LIANZHONG CONSTR ENG TECH

Hydraulic support set special for withdrawing of hydraulic support of coal mine fully-mechanized coal mining working face and withdrawing method thereof

The invention discloses a hydraulic support set special for withdrawing of a hydraulic support of a coal mine fully-mechanized coal mining working face and a withdrawing method thereof. The support set comprises a horizontal hydraulic support and a vertical hydraulic support. The horizontal hydraulic support is vertically arranged on the front end of the vertical hydraulic support, a horizontal retractable part for shifting opposite to each other in the length direction of the vertical hydraulic support is arranged between the horizontal hydraulic support and the vertical hydraulic support, one end of the horizontal retractable part is connected with the horizontal hydraulic support, and the other end of the horizontal retractable part is connected with the vertical hydraulic support. During withdrawing of the support, the support set composed of the horizontal hydraulic support and the vertical hydraulic support supports an exposed top plate timely and automatically, timely effectivesupporting is achieved, personnel work under the top plate with supporting, the production function on personnel and equipment is achieved, and the safety is higher.
Owner:BEIJING CHENGTIAN HENGYE COAL MINE EQUIP CO LTD +2

Construction method of loess tunnel entrance section through landslide mass

The invention discloses a construction method of a loess tunnel entrance section through a landslide mass. The method comprises the following steps that 1, an entrance soil layer is pre-reinforced; 2,a tunnel entrance is constructed; 3, excavation and initial support construction is conducted on the reinforced tunnel section; 4, a reinforced tunnel section base is reinforced; 5, the reinforced tunnel section is subjected to secondary lining construction; 6, excavation and initial support construction is conducted on a rear side tunnel section; and 7, the rear side tunnel section is subjectedto secondary lining construction. The method is reasonable in design, simple and convenient to construct and good in use effect, cement-soil mixed piles are adopted for pre-reinforcement before excavation, a construction process of the tunnel entrance section through the landslide mass is guaranteed to be safe and reliable, meanwhile, the tunnel entrance section is excavated by adopting a three-step excavation method, the reinforced tunnel section base is reinforced, an excavation process of the tunnel entrance section through the landslide mass can be guaranteed to be safe and reliable, in addition, the influence on the stability of a soil layer on the circumferential side of the tunnel entrance is small, and the stability of the excavated and formed tunnel entrance can be effectively improved.
Owner:CHINA RAILWAY 20 BUREAU GRP

Tunnel portal section pre-reinforcement and excavation construction method based on partition blasting

The invention discloses a tunnel portal section pre-reinforcement and excavation construction method based on partition blasting. The construction method comprises the following steps of 1, precipitation pre-reinforcement; 2, earth surface pre-reinforcement, and specifically, reinforcing the surface of a backfill section in a construction tunnel portal section through adopting a cement soil stirring pile; and 3, tunnel excavation construction, and specifically, carrying out excavation construction from rear to front in a plurality of excavation sections, wherein the process comprises the following steps of surveying and setting out, performing drilling and blasting construction, excavating an upper portal body, excavating a middle portal body and excavating a lower portal body. The construction method is reasonable in design, simple and convenient in construction and good in use effect; the underground water level is reduced through precipitation pre-reinforcement, and then surroundingrock is effectively reinforced; after the backfill section is subjected to surface pre-reinforcement through using the cement soil stirring pile, a three-step synchronous excavation mode is used forcarrying out partition blasting excavation, so that it is ensured that the tunnel excavation process is safe and reliable and a tunnel structure is stable.
Owner:CHINA RAILWAY 20 BUREAU GRP

Express cabinet emergency auxiliary device based on balance principle

InactiveCN111990804ACircumstances to prevent damageReduce economic lossFurniture partsAlarmsStructural engineeringE-commerce
The invention relates to the technical field of electronic commerce and further discloses an express cabinet emergency auxiliary device based on the balance principle. The auxiliary device comprises acabinet body, wherein an alarm is fixedly connected to the exterior of the cabinet body, a glass tube is fixedly connected to the interior of the cabinet body, a steel ball is movably connected to the interior of the glass tube, a power connection sheet is fixedly connected to an inner surface of the glass tube, a long rod is movably connected to the interior of the cabinet body, a connecting rodis fixedly connected to the exterior of the long rod, and a copper rod is fixedly connected to the exterior of the connecting rod. The auxiliary device is advantaged in that through interaction of the glass tube, the steel ball, a power connection sheet, a support plate, a rotating rod, a support rod, a spring I, a protection assembly, a limiting assembly and an inclined block, when an express cabinet accidentally topples over, emergency auxiliary supporting can be carried out on the express cabinet, the situation that the express cabinet directly topples over, and consequently the express cabinet is directly broken or express in the express cabinet is damaged is prevented, and then unnecessary economic losses are greatly reduced.
Owner:广州艳芸电子商务有限公司

Tunnel construction method for passing through boundary strata of earth and stone

The invention discloses a tunnel construction method for passing through the boundary stratum of earth and stone. The tunnel construction method comprises the following steps: I, excavation of a reartunnel segment and initial supporting construction; II, excavation of a middle tunnel segment and initial supporting construction; III, excavation of a front tunnel segment and initial supporting construction, wherein the rear tunnel segment, the middle tunnel segment and the front tunnel segment are all three-step synchronous excavated tunnel segments; and in the process of excavation from rear to front, constructing the secondary lining of the tunnel on the inner side of the initial supporting structure of the constructed tunnel from rear to front. The tunnel construction method has the advantages of reasonable design, simple construction and good use effect. The tunnel construction method selects an appropriate drilling and blasting method according to the position relationship betweenthe earth and stone interface and a tunnel hole, adopts a three-step synchronous excavation way to carry out blasting excavation, can ensure the safe and reliable excavation process of the tunnel passing through the boundary stratum of earth and stone, and can ensure the stable structure of the tunnel. Moreover, in the excavation process, the initial supporting structure and the secondary lining of the tunnel are adopted to provide stable and reliable supporting for the large-section tunnel.
Owner:THE NO 6 ENG CO LTD OF CHINA RAILWAY 20TH BUREAU GRP

Through landslide body loess tunnel construction method

The invention discloses a through landslide body loess tunnel construction method. The through landslide body loess tunnel construction method comprises the following steps of constructing a tunnel entrance section and a tunnel exit section simultaneously; and respectively constructing an inclined shaft auxiliary construction inlet section and an inclined shaft auxiliary construction outlet section through a tunnel inclined shaft when the tunnel entrance section and the tunnel exit section are constructed. The through landslide body loess tunnel construction method is reasonable in design, convenient to construct and good in using effect; the loess strata in the construction area where the tunnel entrance section is positioned is subjected to reinforcement treatment by using a cement soilmixing pile in advance before excavation, and the reinforcement length and the reinforcement depth are effectively limited; a loose soil body on a hole body of a tunnel hole is solidified in advance so as to ensure the safety and reliability of the construction process of a hole inlet section of the through landslide body loess tunnel; meanwhile, in the construction process of the tunnel by adopting a three-step excavation method, the construction process of track plates is completed synchronously, so that the construction process of the loess tunnel can be completed easily, conveniently and quickly; and the stability of an excavated and formed tunnel hole can be effectively improved.
Owner:CHINA RAILWAY 20 BUREAU GRP

Shoes and cushioning supporting system thereof

The invention discloses a pair of shoes and a cushioning supporting system thereof. The cushioning supporting system comprises a shoe sole body, a supporting piece and a cushioning part. The shoe sole body comprises a front foot sole part corresponding to the position of the front foot sole of the human body and a heel part corresponding to the heel position of the human body. The bottom of the heel part is provided with an installing notch. The supporting piece is located in the installing notch, is adaptive with the installing notch in size, and is fixedly connected with the shoe sole body, the hardness of the supporting piece is larger than that of the shoe sole body, the cushioning part is located in the installing notch, is adaptive with the installing notch in size and is overlaid on the lower side of the supporting piece and fixedly connected with the supporting piece, and the elasticity of the cushioning part is larger than that of the shoe sole body. The objectives of improving stability of the flexible shoe sole and providing higher cushioning and higher and more timely supporting force for the human body can be achieved, and thus the objectives of providing a better reinforcement effect and guaranteeing wearing comfort are achieved.
Owner:ANTA CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products