The invention relates to the technical field of
nuclear power modeling, in particular to a
nuclear power plant control model construction method,
electronic equipment and a storage medium. According to the
nuclear power plant control model construction method, a
control logic diagram and modeling demand information of a target
nuclear power plant control system need to be acquired firstly; performing
simulation demand analysis on the
control logic diagram based on the modeling demand information to determine a
simulation implementation constraint; performing function block icon analysis on the
control logic diagram, determining a plurality of target modeling elements, performing function block identifier analysis on the control logic diagram, determining a
simulation constant value parameter and a parameter transmission relation, and generating a
transmission point-to-point file; constraining the plurality of target modeling elements based on simulation implementation, and generating a
simulation control chart; and carrying out model loading on the basis of the
simulation control chart, the simulation fixed value parameters, the transmission pair point file and the parameter transmission relation, and generating a
nuclear power plant control model. Therefore, the quality and efficiency of the
nuclear power plant engineering simulation
machine in the modeling link of the nuclear power
plant control model can be improved.