The invention discloses an intelligent substation secondary equipment maintenance control method and
system, and relates to the technical field of secondary equipment maintenance control, and the method comprises the following steps: obtaining first data of a substation to construct a static matrix, and generating a dynamic
topological graph; determining the
security level of the controlled equipment according to the dynamic
topological graph, and establishing a priority table of mapping of the equipment type and the
security level; detecting concurrent instruction conflicts through a priority table, identifying an N-order virtual loop based on a dynamic
topological graph, generating a minimum isolation set, and outputting a
virtual terminal isolation
instruction sequence with timing constraint according to a
signal level; and when the state of the maintenance pressing plate or the
GOOSE link is changed, the affected equipment is positioned based on the static matrix, and incremental updating of the dynamic topological graph is controlled according to the
instruction sequence. According to the method, the path optimization strategy based on the cross-interval coefficient is matched with the time window constraint, so that the maintenance efficiency is guaranteed, potential safety hazards caused by disordered
operation time sequences are avoided, and the maintenance process is standardized and intelligent.