The invention relates to the technical field of
coal mine tunnel disaster treatment, in particular to a ground advanced exploration treatment method for a
coal mine tunnel crossing fault zone. The method comprises the steps that a ground drilling site is arranged, and a ground
directional drilling structure and a drilling track are designed; the ground
directional drilling structure comprises a first-opening straight hole section, a second-opening deflecting section and a third-opening
branch section. Calculating a design reinforcement range; in a ground drilling field, drilling is carried out according to a ground
directional drilling structure and a drilling track, and the first straight hole section drilling operation comprises drilling, casing lowering,
pipe fixing and pressure testing; the grouting amount is calculated according to the designed reinforcement range, and grouting is conducted on the three-section
branch section according to the grouting amount;
logging is conducted in the drilling process of the second-opening deflecting section and the third-opening
branch section, and
logging data are obtained; and the grouting effect is evaluated, and hole sealing operation is conducted. According to the method, the rock
mass around the roadway is reinforced through ground directional drilling before the underground roadway is tunneled, mutual interference with underground operation is small, and the production efficiency and the
coal mining safety are improved.