Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

79results about How to "High quality operation" patented technology

Wireless sensor network system for monitoring real-time data of power grid

The invention discloses a wireless sensor network system for monitoring real-time data of a power grid, which comprises a wireless sensor node, a gateway node, an Internet network and a monitoring center data platform, wherein the wireless sensor node is used for collecting real-time running state parameters of power grid equipment and transferring the collected parameters to the monitoring center data platform through the gateway node and the Internet network; the monitoring center data platform is used for monitoring the received real-time data of power grid equipment; and the wireless sensor node and the gateway node are connected to a power supply module. The timely induction for internal risks of the power grid equipment and the judgment on the equipment running state of a circuit are realized, by utilizing the wireless sensor network system provided by the invention in the manner of data monitoring. The gateway node of the wireless sensor network system has high transmission speed and strong anti-jamming capability; the wireless sensor node and the gateway node can be used for efficiently acquiring and storing energy; and the long service lives of the wireless sensor node and the gateway node are realized.
Owner:NANJING UNIV OF FINANCE & ECONOMICS +1

Method for evaluating reliability of performance state of reciprocating compressor

The invention relates to a method for evaluating the reliability of the performance state of a reciprocating compressor. The method comprises the following steps of: determining a factor set U, wherein the factor set is a set formed by taking various factors influencing an evaluated object as elements, and the comprehensiveness, sensitivity, chanciness and stability of indexes are required to be taken into consideration when the indexes are selected; establishing a weight set A, and giving a corresponding weight to each factor, wherein the weight set is required to meet conditions of normalization and non-negativity; determining a remark set V, wherein the remark set is a classic set consisting of possible evaluation results of the evaluated object, the number m of remark grades is more than 3, but less than or equal to 9 and is an odd number; evaluating a single factor, and establishing a fuzzy relation matrix R; after the factor weight set A and the evaluation matrix R are determined, obtaining a fuzzy comprehensive evaluation set B according to the multiplying operation of the fuzzy matrix; and processing the evaluation indexes by a maximum membership grade method or a weighted averaging method. The method is simple and practical and is easy to popularize and apply.
Owner:PETROCHINA CO LTD

Double-feed wind power generating system with energy storage function

The invention relates to a double-feed wind power generating system with energy storage function, comprising a double-feed type wind power generator, an alternating-current excitation power supply, a monitoring device, a grid-connection contactor and an energy storing device, wherein one end of the grid-connection contactor, a stator winding of the double-feed type wind power generator, and the alternating-current end of a stator side converter are together connected with a load, and the other end of the grid-connection contactor is connected with a power grid; the alternating-current end of the alternating-current excitation power supply is connected with the energy storing device; and the monitoring device controls the communication state of the grid-connection contactor to realize the conversion of an independent running mode or a grid-connection running mode of the system and controls the working states of a rotor side converter and the stator side converter according to the current running mode. When carrying out grid-connection running, the double-feed wind power generating system can actively participate in the running and the control of an electric system to provide active power and reactive power compensation and improve the quality of electric energy; when carrying out independent loaded running, the double-feed wind power generating system can achieve the dynamic balance of the active power and the reactive power at a generation side and an electric load side to ensure the safe, economic, efficient and high-quality running of wind power equipment and the load.
Owner:HUAZHONG UNIV OF SCI & TECH

Composite high frequency component and mobile communication apparatus including the same

A composite high frequency component, comprising: a first high frequency switch having a first common port and firsts second, and third communication ports, wherein: the first communication port is operable to connect to respective transmitting sections of first and second communication systems which operate in substantially the same frequency band, the second communication port is operable to connect to a receiving section of the first communication system, the third communication port is operable to connect to a receiving section of the second communication system, and the first high frequency switch has a transfer characteristic for passing signals between the first common port and the first, second and third communication ports which are in the frequency band of the first and second communication systems as a function of at least one first control signal; a second high frequency switch having a second common port and fourth and fifth communication ports, wherein: the fourth communication port is operable to connect to a transmitting section of a third communication system which operates in a different frequency band than the first and second communication systems, the fifth communication port is operable to connect to a receiving section of the third communication system, and the second high frequency switch has a transfer characteristic for passing signals between the second common port and the fourth and fifth communication ports which are in the frequency band of the third communication system as a function of at least one second control signal; a first filter having a transfer characteristic for passing signals in the frequency band of the first and second communication systems, one end of the first filter being coupled to the first common port of the first high frequency switch; a second filter having a transfer characteristic for passing signals in the frequency band of the third communication system, one end of the second filter being coupled to the second common port of the second high frequency switch; and a diplexer having a third common port and first and second input/output ports, wherein: the third common port is operable to at least one of receive and transmit signals from an antenna, the first input/output port is coupled to an opposite end of the first filter, the second input/output port is coupled to an opposite end of the second filter, and the diplexer has a transfer characteristic for passing signals: (i) between the third common port and the first input/output port which are in the frequency band of the first and second communication systems, and (ii) between the third common port and the second input/output port which are in the frequency band of the third communication system.
Owner:MURATA MFG CO LTD

Control method and system of dynamic feedback of service quality of end-to-end service

The invention provides control method and system of the dynamic feedback of the service quality of an end-to-end service. The control system comprises the following modules: a data acquisition module, a service quality analysis module, a service parameter programming module, a service parameter regulating module and a knowledge base module, wherein the data acquisition module is used for acquiring and detecting the network performance parameters of the end-to-end service and the the end-to-end service evaluating information of a user; the service quality analysis module is used for analyzing the network performance parameters and the end-to-end service evaluating information of the user to determine service parameters which need to be regulated; the service parameter programming module isused for programming the service parameters which need to be regulated to form optimized service parameters; the service parameter regulating module is used for setting the optimized service parameters into service implementation equipment; and the knowledge base module is used for providing information support for the data acquisition module, the service quality analysis module, the service parameter programming module and the service parameter regulating module. The control method monitors an end-to-end network service system by utilizing the control system and programs and regulates the optimized service parameters of the service implementation equipment, thereby dynamically enhancing the service quality of the end-to-end service in real time.
Owner:ZHENGZHOU SEANET TECH CO LTD

Intelligent rainwater car washing system

The invention provides an intelligent rainwater car washing system which is characterized by comprising a rainwater collection unit (1), a rainwater purification unit (2), a clean water pond unit (3), a car washing room unit (4), a waste water reusing processing unit (5) and an intelligent control unit (6), wherein a water outlet pipe (1-3) of the rainwater collection unit (1) is connected with a water inlet pipe (2-1) of the rainwater purification unit (2), a water inlet pipe (2-5) of the rainwater purification unit (2) is connected with a water inlet pipe (3-1) of the clean water pond unit (3), a water supplying pipe (3-3) of the clean water pond unit (3) is connected with a water inlet pipe (4-4) of the car washing room unit (4), and car-washing waste water of the car washing room unit (4) flows into a waste water collection pipe (5-1) of the waste water reusing processing unit (5). On-line motoring data and sending instructions of other units are collected by the intelligent control unit (6) to control operation of all unit equipment. The intelligent rainwater car washing system has the advantages of opening up new water resources, saving fresh water resources, and being environment-friendly, and has good society benefits and environment benefits.
Owner:朱加林

Distributed thermal pipeline leakage monitoring system

The invention provides a distributed thermal pipeline leakage monitoring system. The system comprises an optical fiber temperature measuring host, an industrial personal computer and optical temperature measuring cables; the optical fiber temperature measuring host comprises N temperature measuring channels; each temperature measuring channel is correspondingly connected with one optical temperature measuring cable; the optical temperature measuring cables are laid along the pipeline in the whole journey by using a thermal pipeline as a carrier; and the temperature measuring channels send pulsed optical signals to the optical temperature measuring cables, scattered light sent back from the insides of the optical temperature measuring cables is acquired in real time, according to the refraction index of the optical temperature measuring cables and the light intensity of the scattered light, the whole-line temperature and temperature change rate value curve of the thermal pipeline is obtained, the average temperatures and the maximum temperature change rates of to-be-monitored parts are determined according to the lengths, away from the optical fiber temperature measuring host, of the optical cables laid at the different to-be-monitored parts, and whether the thermal pipeline is in the leakage state is judged according to the set temperature change rate threshold value.
Owner:BEIJING INST OF AEROSPACE CONTROL DEVICES

Plaster cutting packaging method and device

ActiveCN105460300AOvercoming the defects of low degree of automationOvercoming defects such as difficulty in replacementWrapping material feeding apparatusWrappingEngineeringPlastic film
The invention discloses a plaster cutting packaging method and device. The method comprises the steps that a packaging film is cut to form an upper packaging film and a lower packaging film; plaster materials are cut into plastic sheets; front and reverse face overturning is performed on the lower packaging film, the upper packaging film, the plastic sheets and the lower packaging film which are sequentially arranged from top to bottom are fed into a mold sealing and pressing device at the same time for sealing and pressing packaging to form continuous plaster bags; and edge cutting and slitting processing are performed. The device comprises a packaging film unwinding and slitting device, a plaster material unwinding and slitting device, the mold sealing and pressing device, an offcut slitting device and a small bag cut-off and output device which are arranged on the machine frame. The outlet end of the packaging film unwinding and slitting device and the outlet end of the plaster material unwinding and slitting device are connected with the inlet end of the mold sealing and pressing device. The mold sealing and pressing device, the offcut slitting device and the small bag cut-off and output device are sequentially arranged in the plaster bag conveying direction. The packaging technology with the high automation degree can be achieved, production is stable, and the production efficiency is high.
Owner:GUANGZHOU XINGSHI EQUIPS

Multi-dimensional power flow evaluation index method based on statistic analysis of historical information of power grid

The invention relates to a multi-dimensional power flow evaluation index method based on the statistic analysis of the historical information of a power grid. The method comprises the following steps of: preprocessing power flow information: acquiring the power flow information in a selected time interval from a database, calculating a power flow overload coefficient alpha representing the power flow overload degree of single equipment or a power transmission cross section, and comparing the acquired historical power flow data with the limit value of the equipment or the cross section; carrying out statistic calculation on power flow time features: counting time corresponding to different power flow overload degrees through the utilization of the power flow overload coefficients and the corresponding time periods, and summing the time periods to obtain the relationship between the power flow overload degrees and the running time; and carrying out statistic calculation on the multi-dimensional power flow evaluation indexes (PFI). According to the multi-dimensional power flow evaluation index method, a power flow distribution curve is drawn on the basis of the historical data of the power grid according to the power flow evaluation indexes (PFI), an auxiliary means is provided for the power flow analysis and the power flow prediction of the power transmission cross section of the power grid and the medium and long term statistic analysis of the power grid, and the key power flow control indexes of the power grid are converted to the multi-dimensional statistic indexes.
Owner:EAST CHINA GRID +1

Distributed power supply optimal connection position and capacity planning method taking multiple subjects into consideration

The invention discloses a distributed power supply optimal connection position and capacity planning method taking multiple subjects into consideration. The method includes the steps: building a distributed power supply model, namely, a prediction model of photovoltaic power generation system output; building an outer layer optimization model taking a power distribution network as a subject; building an inner layer optimization model taking a user as a subject; building a distributed power supply optimal access location and capacity solution algorithm based on a genetic algorithm. According tothe method, a distributed power supply model can be accurately built, many-sided benefits are comprehensively considered, and distributed power supply optimal access capacity and location is determined by two-layer optimization and multi-subject game. An important basis can be provided for optimal access of a distributed power supply in a power distribution network, an important foundation servesas optimal planning of an active distribution network, the power distribution network is planned based on the important foundation, adverse effect of a distributed power supply on the power distribution network can be decreased, efficient, economical and excellent running of the power distribution network is facilitated, the planning level of an urban distribution network can be improved, and reasonable development of an urban active distribution network is facilitated.
Owner:STATE GRID JIANGSU ECONOMIC RES INST +1

Multi-dimensional voltage deviation index method based on statistic analysis of historical information of power grid

The invention relates to a multi-dimensional voltage deviation index method based on the statistic analysis of the historical information of a power grid. The method comprises the following steps of: preprocessing voltage information: acquiring the station voltage information including time attributes, space attributes and equipment set attributes in an undetermined time interval from a database; calculating an early warning median value: reading the upper limit and the lower limit of a voltage early warning value, and calculating a median of the voltage early warning value so as to enable voltage deviation indexes (VDI) to have the capability of out-of-limit early warning; and carrying out sorting calculation on multi-dimensional voltage deviation indexes: carrying out statistic analysis and calculation on voltage data within a period of time T to obtain important voltage indexes VDI of a single station and the power grid. According to the invention, a VDI curve is drawn according to statistic calculation results, a reference basis is provided for the regulation of the voltage, the regulation of a reactive power control strategy and the basis planning, configuration and switching of reactive-load compensation equipment so as to assist a dispatcher in learning the current running health degree and the variation trend of the power grid, and a reliable auxiliary strategy can be provided for the running mode adjustment and the risk preventive control of the power grid .
Owner:EAST CHINA GRID +1

Temperature and leakage monitoring optical cable network based on heat distribution pipeline

The invention provides a temperature and leakage monitoring optical cable network based on a heat distribution pipeline. On the basis of a heat distribution pipeline network, optical cables are pavedall along the heat distribution pipelines; by utilizing a monitoring mode switching device, not only amplitude variation and position information can be obtained through correspondence relation between amplitude variation of a Rayleigh scattering light interference phase signal and temperature variation and/or noise disturbance signals caused by leakage to determine pipeline leak points, but alsotemperature information of each point along a fiber can be obtained through correspondence relation between temperature and frequency shift of a Brillouin light scattering signal and by combining positioning information of Fresnel light reflection information, thereby helping to realize whole-course no-blind-area leakage monitoring and temperature abnormity monitoring of each heat distribution pipeline of the heat distribution pipeline network, enabling the pipeline leakage points or temperature abnormity hidden troubles to be found in time and promoting safe and high-quality operation of theheat distribution pipelines.
Owner:北京市热力工程设计有限责任公司

Digital vortex thermo-motive generation device

InactiveCN101813010AAdaptation to climate changeImprove seasonal energy efficiency ratioSteam useThermodynamicsEngineering
The invention relates to a digital vortex thermo-motive generation device, in particular to the digital vortex thermo-motive generation device which utilizes heat of air heat sources or other low-temperature heat sources and uses working medium with low boiling point to apply work and automatically circulate. The invention designs a digital vortex thermo-motive generation device and a working method thereof, aiming at the problems that inadaptability to climatic changes, low energy efficiency ratio COP of the conventional heat pump generation device and the low-temperature thermo-motive device, motive seal medium leakage of a turbomachine output shaft, and low loading rate of discontinuous operation of the turbomachine. The device comprises a single and dual cycle digital vortex thermo-motive generation device integrated by a digital vortex heat-pump system, a working medium zero-leakage low-temperature turbomachine and a dead-steam extraction cycle system thereof, and a heat pipe device, a multi-split online, heat pump combined supply one-online and heat pump combined supply multiple-online generation systems. The device can adapt to climatic changes, has the energy efficiency ratio COP of between 3.4 and 5.6w/w, and can realize clean environment with working medium zero-leakage zero-pollution and no heat drainage pollution.
Owner:杨德林 +2

Power grid weak link analysis method of based on statistic power flow

InactiveCN105976121ASpot weak links in timeRun economyResourcesTransformerEngineering
The invention provides a power grid weak link analysis method of based on statistic power flow. The method includes setting a time scale; extracting the running historical data of each main transformer and setting power flow heavy load coefficients and a power transmission section stable limit; setting iteration frequencies and iteration maximum frequency; calculating the power transmission section power flow mean value; calculating sign functions; calculating the power flow evaluation indexes; calculating the power flow heavy load degree of each main transformer; or sequencing the main transformers based on importance and other steps. According to the invention, the time dimension on the power flow data can be increased and the month or year is selected as the time scale to identify the heavy load degree of the main transformers in a certain period of time, the early peak hours can be used as the time scale to analyze the effect of the early peak on the main transformer load factors, and the time proportions of the power flow heavy load coefficients greater than 60% are sequenced to analyze the importance degree of the main transformers of the equipment, so that the weak link of the power grid can be timely discovered, and the instructions for reasonably arranging the operation ways, maintenance schedules, and power grid planning can be provided.
Owner:STATE GRID TIANJIN ELECTRIC POWER +1

Production line health assessment and diagnosis method and system

The invention provides a health evaluation and diagnosis method and system for a production line, and the method comprises the steps: setting an evaluation dimension of the health state of the production line; setting an alarm parameter according to the evaluation dimension, setting a signal acquisition parameter according to the alarm parameter, and setting a scoring parameter according to the alarm parameter, the signal acquisition parameter and a production process of a production line; acquiring signal data of a production line according to the signal acquisition parameters; performing alarm calculation on the signal data according to the alarm parameters to generate an alarm result; scoring the health state of the product production process according to the scoring parameters to obtain a health score; and according to the health score and the alarm result, carrying out health state diagnosis on the production line to obtain a diagnosis result, thereby realizing real-time monitoring and evaluation of the health state of the production line, carrying out timely early warning and alarm on various abnormalities and faults of the production line, and giving an effective response mode so as to ensure that the production line can operate stably with high quality and high efficiency.
Owner:MCC CAPITAL ENGINEERING & RESEARCH +1

Intelligent electric meter fault prediction method and system based on BiLSTM-CNN model

The invention relates to the technical field of intelligent electric meter fault prediction, and provides an intelligent electric meter fault prediction method and system based on a BiLSTM-CNN model, and the method comprises the steps: obtaining historical fault data of an intelligent electric meter as feature data, including equipment data, operation data, a fault type, fault time, temperature and humidity; the feature data is subjected to data cleaning, the data cleaning comprises cleaning of duplicate values, missing values and abnormal values contained in historical fault data features, and then a BiLSTM-CNN model is constructed; according to the technical scheme, the feature set influencing the fault of the intelligent electric meter is encoded by using the advantage of extracting sequence time sequence information by the bidirectional long and short time memory network and the advantage of extracting local feature information by the convolutional neural network, and finally, the encoded vector is used for classifying and predicting the fault of the intelligent electric meter. The problem that effective information in the fault data of the intelligent electric meter cannot be well extracted by a single neural network model in the prior art is solved.
Owner:GUANGXI POWER GRID CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products