The invention discloses a construction technology of a waterproof air-permeable bare-concrete-
simulation coating. The technology is characterized by comprising the following steps of (1) base face treatment, wherein after gaps, cracks and sunken parts are subjected to filling-up and ground to be flat, an anti-
crank grid fabric is hung on the base face, and then a
putty layer is constructed; (2) priming paint construction; (3) construction of a color different adjustment material, wherein a color modification agent B is dipped, flap and
knurling are conducted on the base face with completely-dried priming paint, and one-time completion is achieved; then, a color modification agent C is dipped, flap and
knurling continue, and two-time completion is achieved; finally, a color modification agent A is dipped, flap and
knurling continue, and one-time completion is achieved; (4) finish paint construction; (5) construction of a top facing agent. According to the construction technology, commonconcrete is directly used as a
processing base material, modification is conducted on the surface of the common concrete, the production cost is greatly reduced, the defects of the base face are repaired by constructing the
putty layer, the whole base face is completely covered with
putty and is in an even and uniform state, and accordingly the base material is tightly and reliably combined withthe
coating.