The application relates to the technical field of
scaffold wall connecting, and discloses a novel
scaffold wall connecting device and a construction method, which comprise a tension bolt, two vertical rods and a sleeve
pipe. The sleeve
pipe is embedded in a wall body. In use, the tension bolt penetrates the sleeve
pipe embedded in the wall body and serves as a core stress carrier for connecting the wall body and the
scaffold, and the sliding property of the tension bolt facilitates construction adjustment. The sealing rings at the two ends of the sleeve pipe provide initial sealing for the reserved holes, and the expansion mechanisms of the first and second backing plates are matched with the sealing rings to enhance the sealing. The three backing plates are slidably arranged on the tension bolt, the positions of the three backing plates can be adjusted to ensure adhesion,
effective force transmission is realized, the four supporting legs on the first backing plate are flexibly adjusted through the adjusting
assembly, different wall body structures can be adapted, the connecting stability is enhanced, the wall connecting steel pipe is sleeved on the tension bolt and adheres to the first backing plate, loads are transmitted to the wall body, the arc-shaped grooves of the
fastener body are matched with the wall connecting steel pipe and the vertical rods, and stable connection is realized through cooperation of the first cover plate and the second cover plate.