HRCEA (hybrid of rules and compression-extensive algorithm)-based steel making-continuous casting production scheduling method for special steel mill

The invention provides a HRCEA (hybrid of rules and compression-extensive algorithm)-based steel making-continuous casting production scheduling method for a special steel mill. In the scheduling method, model and algorithm parameters are obtained by analyzing a steel making-continuous casting production flow; according to a known production casting times plan, an initial production scheduling plan is worked out by adopting the HRCEA; and all subsequent furnace working plans are adjusted by using the HRCEA according to an established scheduling rule and fed-back real-time data so as to realize dynamic scheduling. According to the HRCEA-based steel making-continuous casting production scheduling method disclosed by the invention, with the aims of reasonably quickening production rhythms and shortening production process time, equipment conditions of the steel mill, produced steel grades and temperature requirements of the produced steel grades are considered; an executable production scheduling plan can be quickly worked out, thus schedulers are facilitated on adjusting the scheduling plan in real time; and the production scheduling of the steel making-continuous casting process is optimized.
Owner:UNIV OF SCI & TECH BEIJING

Multi-component self-organizing soft-connection cluster computer intelligence resource management method

The present invention discloses a multi-component self-organizing software-connected cluster computer intelligent resource management method. The method gradually increases the component resources along with the increase of user number and gradually reduces the component resources along with the decrease of user number according to the component resources provided by the user to the dynamic demand of the resources, thus achieving the automatic start-up and the automatic shutdown of the components. Through monitoring the use of the component resources, the method achieves the dynamic scheduling of the component resources in the component cluster, carries out the fault management and safety management of the components, and monitors and maintains the reliable operation of the component resources. The present invention also carries out the partitioning treatment of system storage resources and satisfies the temporary and permanent storage requirements of different user data. The present invention can increase the utilization rate of the component resources and optimizes the resource configuration of the cluster computer, thus further decreasing the investment cost and the operating maintenance and management cost, and increasing the system reliability.
Owner:SOUTH CHINA UNIV OF TECH

Task scheduling method and device and operating system

The embodiment of the invention provides a task scheduling method and device and an operating system. The task scheduling method comprises the steps of (1) a task scheduling index list is registered and is generated according to all subtasks contained in a task; (2) subtasks which need to be scheduled to be executed are determined when a user program schedules the task; (3) the task scheduling index list is updated according to the subtasks which need to be scheduled to be executed when the user program schedules the task, so that the task scheduling index list only comprises the subtasks which need to be scheduled to be executed when the user program schedules the task; (4) the subtasks in the updated task scheduling index list are scheduled to be executed to accomplish the operation that the user program schedules the task. According to the task scheduling method and device and the operating system, due to the facts that the subtasks which need to be scheduled to be executed are determined when the user program schedules the task, and the task scheduling index list is updated, dynamic scheduling of the task is achieved; due to the fact that subtasks which do not need to be executed are not scheduled any longer, the purpose of reducing useless expenses and the purpose of reducing the load of a CPU and power consumption of the system are achieved.
Owner:HONOR DEVICE CO LTD

Electric automobile and battery management system thereof

The invention provides an electric automobile and a battery management system thereof. The system comprises single batteries, a mother board and a plurality of daughter boards, the daughter boards corresponding to a plurality of single batteries exchange information with the mother board through CAN (controller area network) buses, acquire temperature information and voltage information of the single batteries and transmit the information to the mother board, the mother board/daughter boards can calculate the score of the daughter boards according to the variance of average temperature and thevariance of average voltage of the daughter boards within a certain time period by score parameters obtained by a ranking algorithm, and the mother board/daughter boards can dynamically adjust the priority of the daughter boards according to the score of the daughter boards. The system solves the problems that a traditional battery management system adopts a static scheduling algorithm in communication, consequently, important data information sometimes cannot be transmitted or timely transferred, and the traditional battery management system cannot timely find battery defects. Daughter boardmessage transmitting reliability and safety are realized, and the performance of the electric automobile is further improved.
Owner:BEIHANG UNIV

Timeliness-first scheduling method and system

The invention provides a timeliness-first scheduling method and system, which is used for drop and pull transport. The method comprises the steps of establishing a task queue for any truck or trailer,and estimating position and time of finishing the final task by the truck or the trailer; giving an order set, and finding out an optimal truck and trailer combination, meeting the following conditions, of each order in the order set: the excepted compartment arrival time of the order is greater than a sum of available time and predicted driving time of the trailer, and the expected departure time of the order is greater than a sum of available time and predicted driving time of the truck; calculating a single order price, wherein the single order price is equal to a sum of a short-distance price and a trunk line price; if the trailer and the truck sent by an optimal solution of each order do not have a conflict, obtaining a global optimal solution, otherwise, searching for the global optimal solution through pruning search, replacing the orders with conflicts, using a next non-conflicting truck and trailer combination with a minimum price to solve an overall price of the order set, and if the overall price is increased, performing pruning and discarding; and if no solution exists after the search, discarding the orders with the expected compartment arrival time farthest from current time, and repeatedly executing the steps.
Owner:北京优挂信息科技有限公司

Dynamic distributed scheduling method and system

The invention provides a dynamic distributed scheduling method for double-layer terminal nodes based on a hudson expansion function. The dynamic distributed scheduling method is characterized by comprising the following steps: (a) constructing a double -layer terminal node structure, wherein the bottom-layer terminal node is a mobile terminal, and the upper-layer terminal node is a PC (personal computer) machine; the bottom-layer terminal nod is connected with the upper-layer terminal node; (b) dynamically scheduling the double-layer terminal nodes through an expansion function server based on a hudson system. According to another aspect of the invention, the invention provides a dynamic distributed scheduling system for the double-layer terminal nodes based on the hudson expansion function. The dynamic distributed scheduling system comprises a daemon process module, an agency module and a management module which are used for realizing the functions described by the method. According to the dynamic distributed scheduling method and the dynamic distributed scheduling system, the shortcomings of the hudson server are overcome, and real-time dynamic scheduling of tasks is realized. Moreover, due to the characteristics of the dynamic distributed scheduling method and the dynamic distributed scheduling system, the parallelism of item running is improved by adding terminals.
Owner:BAIDU ONLINE NETWORK TECH (BEIJIBG) CO LTD

Battery management system and electric automobile

The invention provides an electric automobile and a battery management system thereof. The system comprises a mainboard, a plurality of sub boards and a plurality of battery monomers, the mainboard acquires the message quantity and recurrence rate corresponding to each sub board sent by each sub board in the same network in a certain time period so as to calculate a bus load rate of a CAN bus in the time period; the mainboard also obtains the temperature information and voltage information of the battery monomer corresponding to each sub board in the time period, the mainboard/sub board calculates the score of the each board according to the score parameters obtained by using a sorting algorithm according to a variance of an average temperature and a variance of an average voltage of the sub board in a certain time period so as to obtain the priority of the sub board; and the mainboard judges whether the bus load rate is in an expected range or not, and dynamically adjusts the frequency of sending messages by each sub board according to the priority of each sub board when the bus load rate exceeds the expected range. The battery management system can reduce the bus load rate according to the data weight, achieves the reliability and safety of message information transmission of each sub board, and further improves the performance of the electric automobile.
Owner:BEIHANG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products