The invention provides an intelligent rail
green wave driving method and
system based on multi-
system linkage, relates to the technical field of intelligent
rail traffic control, and solves the problem that the overall operation efficiency of a novel rail vehicle under shared right of way is limited. The method comprises the following steps: collecting real-time position and speed data of the intelligent rail vehicle, verifying the data by a
station monitoring system, calculating the predicted intersection
arrival time of the intelligent rail vehicle, and sending the predicted intersection
arrival time to a
traffic signal lamp
management system; and the predicted intersection
arrival time, the current corresponding
signal lamp state and intersection
traffic flow data are combined and uploaded to a total traffic
light control center, and the total traffic
light control center determines whether to trigger a
green light acceleration operation or not through an authority grading judgment mode, calculates the
green light acceleration duration during triggering, generates a
green light acceleration instruction and issues the green light acceleration instruction to the corresponding
traffic signal lamp. On the premise of guaranteeing the traffic safety of the intelligent rail, social vehicles and pedestrians, the
traffic efficiency of the intelligent rail intersection is remarkably improved, the operation and maintenance cost is reduced, and the urban traffic operation order is optimized.