The invention discloses a rapid
bus driving roadbed which comprises, from bottom to top, a soft soil base layer formed by leveling and tamping soft soil and pre-embedded with a main drainage
pipe; a gravel layer which is formed above the soft soil base layer by pouring gravel and
cement, wherein a
retaining wall, a bearing frame and a monitoring structure are arranged in the gravel layer; a
rubble layer which is formed by pouring rubbles and
cement, wherein a water tank is arranged in the
rubble layer; a water permeable
brick layer which is a
brick body formed above the gravel layer, wherein the water permeable
brick layer is provided with a water permeable structure; an
asphalt concrete layer which is formed above the water permeable brick layer, wherein the
asphalt concrete layer comprises lower coarse-grain
asphalt concrete, upper medium-grain
asphalt concrete and stiffening rods inserted between the lower coarse-grain
asphalt concrete and the upper medium-grain
asphalt concrete; and a pavement layer which is formed above the asphalt concrete layer. According to the rapid
bus driving roadbed, rapid drainage can be achieved, the safety of rapid
bus driving in rainy days is improved, meanwhile, pavement settlement is controlled, effective jacking and timely response are conducted, and the service life of the rapid bus driving roadbed is prolonged.