The invention belongs to the technical field of material preparation, in particular to a preparation method of a
corrosion-resistant ductile
malleable iron material. A forming device used in the method comprises a bottom plate, a rotating shaft is rotatably installed on the top of the bottom plate, and a driving motor is fixed on the top of the bottom plate A rotating wheel is fixed on the top of the
drive motor, a rotating ring is fixed on the surface of the rotating shaft, a synchronous belt is movably connected between the rotating wheel and the rotating ring, a placing table is fixed on the top of the rotating shaft, and the top of the placing table is There is a placing groove, the placing groove is used for placing the
casting mold, and two brackets are fixed on the side wall of the placing platform; the invention presses and produces a sheet-shaped
corrosion-resistant layer, so that the
corrosion-resistant layer is distributed on the surface of the ductile
malleable iron material, and is compatible with the ductile malleable
cast iron material. The ductile
malleable iron material is integrated into one, and it can still protect the ductile malleable iron material when
forging, and at the same time reduce the use of
nickel and
chromium, reduce the cost of use, and retain the characteristics of the ductile malleable iron material to the maximum extent.