The invention relates to the technical field of water conservancy and
hydropower engineering, and discloses a diversion tunnel, flood spilling tunnel,
flood discharge and sand
discharge tunnel and ecological drainage tunnel combined structure and a construction method thereof. The structure comprises a flood spilling tunnel vertical shaft section, the diversion tunnel is formed in one end of the bottom of the flood spilling tunnel vertical shaft section, and a flood spilling tunnel recession tunnel section is arranged at the other end of the bottom of the flood spilling tunnel vertical shaft section; the flood spilling tunnel recession tunnel section is connected with the flood spilling tunnel vertical shaft section through a horizontal pressure slope section; a stilling
pool, a diversion tunnel and a
spillway tunnel vertical shaft section are arranged at the
tail end of the
spillway tunnel recession tunnel section, and an ecological drainage tunnel is arranged below the
spillway tunnel recession tunnel section; the flood spillway vertical shaft section comprises a vertical shaft, a stilling well is downwards formed in the bottom end of the vertical shaft, a service gate is arranged on the side, close to the diversion tunnel, of the vertical shaft, when the service gate is closed, the service gate is used for playing a flood spillway function, and when the service gate is opened, the service gate is used for playing a
flood discharge and sand
discharge function. The structural arrangement and the construction method have the advantages of reducing the
engineering quantity, shortening the construction period, saving the
engineering investment and the like.