42results about How to "Improve layout accuracy" patented technology

Linear bearing platform type component high-precision steel bar arrangement method

The invention relates to the technical field of building construction, and discloses a method for arranging high-precision steel bars of linear bearing platform type components based on a BIM technology. The method mainly comprises: extracting surface parameters of the linear bearing platform type component, dividing all steel bars into different types according to different space positions, and obtaining an initial dot matrix or model line on an initial offset surface according to diameter parameters, arrangement interval parameters and protective layer thickness of all types of steel bars; performing model line array offset or dot matrix offset along the longitudinal direction to obtain a steel bar model line array, and finally generating a steel bar model. According to the method, accurate positioning and self-adaptive arrangement of the steel bars in the linear bearing platform type component are achieved through computer programming, internal collision of the steel bars is avoided, and steel bar entities are rapidly generated in batches. The problems that in existing deepening design, linear bearing platform type components are low in arrangement accuracy and disordered in rule are solved. And meanwhile, the method can be used for technical disclosure of field construction and has the advantages of improving machining precision and construction efficiency and the like.
Owner:NANCHANG UNIV +2

Assembly type building based stair embedded part automatic generation method and device

The embodiment of the invention discloses an assembly type building based stair embedded part automatic generation method, device and equipment as well as a computer readable storage medium, wherein the method comprises the following steps of positioning a circle center position of a pin key reserved hole by setting a distance between a circle center of the pin key reserved hole and a flat plate section side and a distance between the circle center of the pin key reserved hole and a horizontal edge far away from the stair gravity center in advance, determining the position of the pin key reserved hole by presetting a diameter of the pin key reserved hole and the thickness of a flat plate section, then producing a U-shaped structure by taking a preset parameter as an arc length and a presetheight as a perpendicular line section length between the two endpoints of the arc length along in a thickness direction of the flat plate section, moving the U-shaped structure to a preset embeddingdistance thereof from the surface of the flat plate section, and thus automatically generating a pin key reinforcing rib of the pin key reserved hole in the stair BIM (Building Information Modeling)map. The application greatly improves the efficiency of arranging the pin key reserved hole of a stair in a stair component, improves the arrangement accuracy of a stair embedded part and thus is beneficial to improving the construction efficiency and the construction accuracy of the whole building project engineering.
Owner:焦作筑友智造科技有限公司

Aircraft fuel quantity sensor layout method suitable for large overload and anti-flight working conditions

The invention discloses an aircraft fuel quantity sensor layout method suitable for large overload and anti-flight working conditions, and aims to solve the problems that an existing layout optimization method loses an optimal solution and cannot meet aircraft fuel quantity measurement sensor layout under the large overload and anti-flight working conditions. In order to achieve the purpose, the method comprises the steps of dividing and dispersing feasible installation areas at the bottom and the top of the oil tank; generating a multi-angle sensor mounting line; carrying out pre-filtering treatment on the installation line; discretizing and combining the attitude angles of the oil surface; obtaining a mounting line set group meeting the unmeasurable oil quantity constraint according to the oil surface posture; dividing and combining the set groups; and selecting an optimal sensor layout scheme from the divided set groups according to continuity requirements and attitude error constraints. The method has the advantages of being high in universality, good in optimization performance and capable of automatically optimizing the layout scheme of the inclination sensor, and the work requirement for layout optimization of the oil mass measurement sensor under the large overload and anti-flying working conditions can be met.
Owner:XI AN JIAOTONG UNIV +1

Three-dimensional chip layout method and device and terminal equipment

The invention is suitable for the technical field of computers, and provides a three-dimensional chip layout method and device and terminal equipment, and the method comprises the steps: obtaining at least one initial layout result of a plurality of chips to be laid out; the at least one initial layout result is input into a trained power consumption prediction model for processing, a power consumption prediction value corresponding to each initial layout result in the at least one initial layout result is obtained, and the power consumption prediction model is a neural network obtained by taking the chip layout result with the power consumption prediction value as a training set for training; and selecting a final layout result from the at least one initial layout result according to the power consumption predicted value corresponding to each initial layout result. According to the three-dimensional chip layout method provided by the invention, the influence of power consumption on the three-dimensional chip layout is considered, the layout accuracy of the three-dimensional chip is improved, the power consumption of the three-dimensional chip is reduced, and the service life of the three-dimensional chip is further prolonged.
Owner:CHINA GREATWALL TECH GRP CO LTD

Intelligent generation method for planar orthogonal multi-axial bearing platform steel bars

The invention relates to the technical field of building construction, and discloses an intelligent generation method for planar orthogonal multi-axial bearing platform steel bars based on a BIM technology. The method mainly comprises the steps that bearing platform surface parameters are extracted, an initial dot matrix and a model line are established on a base section and an extension section according to different types of steel bar parameters, and then offset extension is conducted on the initial dot matrix and the model line to form a steel bar model line array, different from linear bearing platform type components, different spatial arrangement rules are made for different types of steel bars according to the shapes of bearing platforms at corners or intersections of plane orthogonal multi-axial directions, and finally a steel bar model is generated. According to the method, accurate positioning and automatic arrangement of the reinforcing steel bars in the planar orthogonal multi-axial bearing platform are achieved through computer programming statements, internal collision of the reinforcing steel bars is effectively avoided, and the problems that in existing deepening design, planar orthogonal multi-axial bearing platform components are low in arrangement accuracy and disordered in arrangement rule are solved. And meanwhile, the method can be used for technical disclosure of on-site construction and has the advantages of improving the on-site machining precision and the construction efficiency and the like.
Owner:NANCHANG UNIV +2

Car roof solar energy chip integration device , solar energy automobile and method for packaging chip

The invention provides a car roof solar energy chip integration device, solar energy automobile and method for packaging a chip. The integration device includes a substrate in which through holes are arranged, the front side being provided with a first trench, and the reverse side being provided with a second trench; solar energy chips fixed on the front side of the substrate; a plurality of conductive bands arranged in the first trench, the first end of each conductive band being connected with the solar energy chip, and the second end being led out from the through hole to the reverse side of the substrate; and bypass diodes and anti-reversion diodes arranged in the second trench and connected with the second ends of the conductive bands. According to the car roof solar energy chip integration device, solar energy automobile and method for packaging the chip provided by the invention, the trenches and through holes are arranged in the substrate for arrangement of the bypass diodes, anti-reversion diodes and conductive bands, the problem in the prior art that electrical wiring control is not precise is solved, the light incoming amount of the solar energy chips is improved, the technology is simplified, and the electrical wiring precision is improved.
Owner:DONG HAN NEW ENERGY VEHICLE TECH CO LTD

The invention discloses a sStair embedded part automatic generation method and device based on a fabricated building

The embodiment of the invention discloses a stair embedded part automatic generation method, device and equipment based on a fabricated building and a computer readable storage medium. The method comprises the steps that the distance between the circle center of a pin key reserved hole and the side edge of a flat plate section is preset, t, the circle center position of the pin key reserved hole is positioned through the preset diameter of the pin key reserved hole and the distance between the pin key reserved hole and the horizontal edge away from the gravity center of the stair, a cylinder penetrating through the flat plate section is generated by presetting the diameter of the pin key reserved hole and the thickness of the flat plate section, Boolean subtraction operation is conducted on the cylinder and the flat plate section outline, and therefore the pin key reserved hole is automatically generated in the stair BIM. According to the construction method, t, the defects existing intraditional manual arrangement of the stair embedded parts are overcome, t, the efficiency of arranging the stair pin key reserved holes in the stair component is greatly improved, t, the arrangementaccuracy of the stair embedded parts is improved, and therefore the construction efficiency and the construction accuracy of the whole building project engineering can be improved.
Owner:CHINA MINGSHENG DRAWIN TECH INVESTMENT CO LTD

Method and device for determining get-off bus station

The invention discloses a method and device for determining a get-off bus station. The method comprises: acquiring a bus transaction record of a person taking public traffic for the last time in a target time period; determining a plurality of downstream bus stops corresponding to the bus transaction record according to the bus transaction record, and calculating a distance value between each downstream bus stop and the matched central point; and screening the downstream bus station corresponding to the minimum distance value as a get-off bus station corresponding to the bus transaction record. Visibly, by implementing the method and the device, the identification information and/or the get-on bus station of the public transport taken by the person at the last time in the target time period can be combined with the position of the center point matched with the target time period to determine the get-off bus station of the target person, and more comprehensive reference basis is provided for improving the operation service of urban public transportation, so that the layout accuracy of the urban public transportation network is improved, the travel efficiency of people is improved, and the traffic congestion condition is alleviated.
Owner:广州羊城通有限公司

Intelligent generation method of planar orthogonal multi-axial cap reinforcement

This project involves the field of building construction technology, and discloses a method for intelligently generating reinforcement bars for plane orthogonal multiaxial caps based on BIM technology. The steps mainly include extracting the surface parameters of the cap, establishing the initial lattice and model lines in the base section and the extension section according to the parameters of different types of steel bars, and then offsetting and extending them to form a line array of steel bar model, which is different from the linear bearing For platform components, different spatial arrangement rules are formulated for different types of steel bars according to the shape of the cap at the corner or intersection of the plane orthogonal multi-axis, and finally the steel bar model is generated. The invention realizes the accurate positioning and automatic arrangement of the internal steel bars of the plane orthogonal multi-axial bearing platform by using computer programming sentences, effectively avoids the internal collision of the steel bars, and solves the problem of the plane orthogonal multi-axial bearing platform components in the existing deepening design The layout accuracy is low and the layout rules are chaotic. At the same time, it can be used as a technical disclosure for on-site construction, and has the advantages of improving its on-site processing accuracy and construction efficiency.
Owner:NANCHANG UNIV +2

Manufacturing method of glass-based LED light-emitting module

The invention discloses a manufacturing method of a glass-based LED (light-emitting diode) light-emitting module, which comprises the following steps of: performing corrosion or etching treatment on the surface of glass by taking a strong-corrosion-resistant film material as a mask to form a regular groove array structure; fixing a chip in the glass plate groove to form a glass plate provided with a high-density chip array; and aligning and attaching the glass plate provided with the conductive circuit and the glass plate of the chip array, and then carrying out laser local heating and reflow soldering treatment to form a structure that the conductive circuit glass plate, the chip and the groove array glass plate are connected into a whole. The groove array glass plate can be separated from the chip, the groove array glass plate can be repeatedly used after being cleaned, the repeatability is high, and the method is suitable for mass production. Or insulating, colorless and transparent glue is directly filled between the conductive circuit glass plate and the groove array glass plate, and a sealing structure is formed on the periphery, so that the light-emitting module is formed. And the formed light-emitting module can be subjected to double-sided thinning treatment to form the glass-based light-emitting module with the required specification.
Owner:YANGZHOU ZHONGKE SEMICON LIGHTING

Series connection module for photovoltaic cell layer and its preparation method and application

The invention provides a series-connected assembly for photovoltaic cell layers and a preparation method thereof. The series-connected assembly includes a first layup layer and a second layup layer. The present invention also provides a method for connecting photovoltaic cell layers in series. The first lay-up layer, the photovoltaic cell layer and the second lay-up layer, which are laid in sequence, are laminated together by hot pressing. The invention can accurately position the battery layer when placing the battery layer, so as to avoid the problem that the battery sheet and the conductive strips are dislocated and affect the electrical performance; the invention has significant effects on the transfer times of the battery and the stress degree of the battery in the production process. The invention can shorten the process of component processing; the invention can improve the battery arrangement accuracy of the component during the production process of the component, and reduce the positioning difficulty of the first layer and the second layer in the production process; the present invention can Reduce the loss of batteries during processing, reduce the man-hours and energy consumption of component manufacturing, and save the input cost of the welding process.
Owner:CHANGZHOU SHICHUANG ENERGY CO LTD

Device, system and method for laying lead wire on intermediate layer of interlayer glass

ActiveCN103802398BImprove layout accuracyEliminate uncertain factors of manual operationGlass/slag layered productsMechanical engineeringUncertainty factor
The invention relates to the technical field of laying a lead wire on an intermediate layer of interlayer glass, particularly provides a device for laying a complex pattern on the intermediate layer of the interlayer glass, and further provides a system and a method which can be used for laying the lead wire on the intermediate layer of the interlayer glass with the coordination of a robot arm. The device comprises a fixing base, a lead wire mounting mechanism, a heating device and a wire pressing roller, and further comprises a lifting device, wherein the lifting device is used for lifting the wire pressing roller, so as to adjust pressure on the lead wire and the intermediate layer on the intermediate layer by the wire pressing roller in a lead wire laying process. The device, the system and the method for laying the lead wire on the intermediate layer of the interlayer glass provided by the invention can be used for arranging the complex pattern on the intermediate layer of the interlayer glass with the coordination of the robot arm, so that uncertain factors caused by manual operation can be avoided; furthermore, waves and the like cannot be generated; the arrangement precision of the lead wire can be improved; the stability of the product quality can be ensured; the production efficiency is improved.
Owner:FUZHOU FUYAO MOLD TECH

Method and device for automatic generation of embedded parts of stairs based on prefabricated buildings

The embodiment of the invention discloses a method, device, equipment and computer-readable storage medium for automatically generating embedded staircase parts based on a prefabricated building. Among them, the method includes constructing a grid-based stair outline model based on the stair configuration parameter information obtained from the BIM base map, and determining two points evenly distributed around the center of gravity of the stair by presetting the horizontal offset distance, and moving in the vertical direction Two points until they fall to the surface of the step are used as the embedding point of the vertical hanging point, and the vector direction of the embedding point pointing to the center of gravity is used as the embedding direction, and the vertical hanging is automatically generated in the staircase BIM diagram according to the preset embedding rules point. This application solves the disadvantages of the traditional manual arrangement of embedded parts for stairs, greatly improves the efficiency of arranging the vertical hanging points of stairs in the staircase components, and improves the accuracy of the arrangement of embedded parts for stairs, thereby helping to improve the overall construction project. Construction efficiency and construction accuracy.
Owner:淮安筑友智造科技有限公司

Prefabricated stand column

The invention discloses a prefabricated stand column and aims to overcome the defects that an existing prefabricated stand column is low in precision and cannot be well matched with a bent cap and a small box girder. The prefabricated stand column is formed by concrete pouring and comprises a positioning plate at the bottom and a pre-embedded column sleeve at the top, a grouting sleeve is fixedly connected to the positioning plate and arranged at the position, close to the outer edge, of the positioning plate, and the positioning plate is provided with an open hole corresponding to and communicated with the grouting sleeve; longitudinally arranged main reinforcements and annular stirrups arranged along the cross section are arranged between the positioning plate and the pre-embedded column sleeve, the main reinforcements are inserted into the grouting sleeve, the other ends of the main reinforcements are positioned through the embedded column sleeve, and the annular stirrups hoop the main reinforcements and the grouting sleeve. The arrangement precision of the main reinforcements is higher through the pre-embedded column sleeve, the main reinforcements are better matched with other prefabricated parts, meanwhile, collision between the reinforcements is avoided, and the waste of raw materials is reduced.
Owner:绍兴市城投建筑工业化制造有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products