The invention provides a pulse type grouting 
machine and a double-liquid grouting construction method. The quincuncial 
pile type is adopted to arrange grouting holes; grouting is carried out on one point of a central area; grouting is dense without a dead angle, the grouting effect is excellent, the grouting pressure is low, and the grouting efficiency is high; and a cabin is unlikely to be blocked on the condition that the condensation rate of mixed 
slurry is higher. High and low pressure 
peak load shifting grouting of the pulse type grouting 
machine is used to realize premixing; secondary mixing in a mixing 
pipe and third-time in-depth mixing of a vibrator are realized; the grouting speed is controllable; and on the condition that the 
slurry is excellent in 
underwater dispersity resistance and high in cohesiveness, the mixing efficiency and the uniform degree are improved. A A-component single fluid and a B-component 
signal fluid are designed; the single fluid components can work fora long time; when the double fluid is mixed, the 
underwater dispersity resistance is high, the condensation and hardening rate is high, and the 
underwater rapid repairing demand of a 
railway tunnel foundation disengaging area is met; double-liquid grouting does not affect construction due to 
pipe blocking caused by excessively high condensation rate. The proportion of the component A and the component B can be controlled to adjust the working time of the mixed 
slurry.