Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

63results about How to "Improve fracturing efficiency" patented technology

Method for realizing temporary plugging redirecting multiple crack fracturing inside horizontal well section

ActiveCN105672970ADegradable volume fractionTemporarily blocked fastFluid removalDrilling compositionFiberViscosity
The invention relates to a method for realizing temporary plugging redirecting multiple crack fracturing inside a horizontal well section. The method comprises the following steps: firstly preparing a temporary plugging redirecting working liquid which includes a degradable temporary plugging agent, degradable fibers, and a low-viscosity transport liquid; conducting sectional fracturing, and conducting pump casting in an order of a preset liquid-a sand carrying fluid-the temporary redirecting working liquid; and after the completion of the entire fracturing, waiting for the temporary redirecting working liquid to degrade, and discharging the temporary redirecting working liquid. According to the method, plugging efficiency is increased through the adoption of the multiple dimension degradable temporary plugging agent, leakage loss among inter-crack liquid is reduced, and plugging success rate is increased. After construction, the degradable temporary plugging agent, and the degradable fibers are completely degraded under well bottom temperature, leave no residue and produce no pollution to artificial cracks. The method of the invention is conducive to rapid plugging of cracks, increases success rate of temporary plugging redirecting fracturing, reduces construction cost, and increase oil and gas reservoir recovery efficiency.
Owner:PETROCHINA CO LTD

High-efficiency fracturing combined device for multi-stage horizontal well

ActiveCN102518419AFast fracturingFracturing time shortenedFluid removalThermodynamicsUpper joint
The invention relates to a special underground tool for conventional oil gas, shale gas and coal bed gas, in particular to a high-efficiency fracturing combined device for a multi-stage horizontal well. The high-efficiency fracturing combined device comprises an open hole packer, a high-efficiency fracturing sliding bush, a small open hole packer, a ball fracturing sliding bush and the like; the first section is provided with a conventional fracturing device; and the second section is provided with the high-efficiency fracturing combined device which has the same structure as high-efficiency fracturing combined devices from the third section to the sixteenth section. An upper joint of the high-efficiency fracturing sliding bush is in threaded connection with a front connecting sliding bush; the lower end of the front connecting sliding bush is connected with the upper end of a middle connecting sliding bush; the lower end of the middle connecting sliding bush is connected with a back connecting sliding bush; the lower end of the back connecting sliding bush is screwed with a lower joint through threads; an upper step of a front baffle is matched with a lower step of the front connecting sliding bush; the lower end of the front baffle is contacted with the lower end of a back baffle; and the lower end of the back baffle is contacted with the upper end of a C-shaped ball seat. The high-efficiency fracturing combined device has high sealing property and high fracturing well completion efficiency, can realize multi-stage fracturing, and improves the technical level and economic benefit of a fracturing technology.
Owner:SOUTHWEST PETROLEUM UNIV

Open hole staged fracturing well completion pipe string provided with controllable valve and hydraulic control switching pipe string

The invention discloses an open hole staged fracturing well completion pipe string provided with a controllable valve and a hydraulic control switching pipe string, which are suitable for well completion processes of horizontal wells and straight wells. The hydraulic control switching pipe string is tripped to open and close the open hole staged fracturing well completion pipe string provided with the controllable valve, so that multilayer-section fracturing well completion construction is realized, and development requirements of low-permeability oil reservoirs and unconventional oil and gas resources are met. The pipe string is sequentially connected with a drill stem running tool, a top suspension packer, a hydraulic control switching retention cylinder, a switchable control valve, an open hole fracturing packer connected with the control valve, a shaft isolating valve and a bottom circulating valve from top to bottom by using a bushing. The hydraulic control switching pipe string comprises a hydraulic control switching tool and a continuous oil pipe; and a set of hydraulic control switching tool is connected to the bottom of the continuous oil pipe. The switchable control valve has the internal drift diameter of the same size; sand fracturing well completion can be performed on a stratum by using the bushing; and thus, requirements of large-displacement and large-scale fracturing reconstruction are met, the crack length, the crack number and the flow guide capacity are increased, and the production capacity and the recovery ratio are effectively increased.
Owner:CHINA PETROLEUM & CHEM CORP +1

Controlled-valve placed well-cementing staged-fracturing well-completion string and hydraulically-controlled switch string

The invention discloses a controlled-valve placed well-cementing staged-fracturing well-completion string and a hydraulically-controlled switch string, which are suitable to be applied to a well-completion process for horizontal wells and vertical wells, and through tripping in the hydraulically-controlled switch string to start and close the controlled-valve placed well-cementing staged-fracturing well-completion string, multi-layer-and-section fracturing well-completion construction is realized, thereby meeting the needs of development on low-permeability oil reservoirs and unconventional oil/gas resources. The controlled-valve placed well-cementing staged-fracturing well-completion string, from top to bottom, is sequentially connected with a hydraulically-controlled switch tool detention cylinder, a switchable control valve and hydraulic casing centralizers connected with the two ends of the switchable control valve, a pressed settling valve and a bottom circulating valve by using a casing; and at least a set of switchable control valve and hydraulic casing centralizers connected with the two ends of the switchable control valve are equipped in the string. The hydraulically-controlled switch string comprises hydraulically-controlled switch tools and a continuous oil pipe, and a set of hydraulically-controlled switch tool is connected to the bottom of the continuous oil pipe. The switchable control valves are same in inner drift diameter (same in size), and can carry out well completion on stratums through the sand fracturing of the casing, thereby satisfying the needs of large-displacement and large-scale fracturing reformation.
Owner:CHINA PETROLEUM & CHEM CORP +1

Automatic underground micro earthquake event identification method based on multichannel scanning superposition

The present invention provides a method for automatic recognition of downhole microseismic events based on multi-channel scanning and superposition, which includes: filtering original microseismic monitoring data collected in the field to remove noise interference ; select the sliding time window to divide the microseismic record into continuous multi-segment records; select one with high signal-to-noise ratio from the segmented records as the reference trace, and calculate the cross-correlation function between the reference trace and other traces to obtain trace time difference information; Use the time difference information to adjust the time window position of each channel to correct the time difference of the record; calculate the multi-channel similarity coefficient, and use the multi-channel similarity coefficient to detect microseismic events. The automatic identification method of downhole microseismic events based on multi-channel scanning superposition can effectively and automatically extract weak microseismic events from background noise, improve identification efficiency and greatly reduce the labor intensity of processing personnel.
Owner:中石化石油工程地球物理有限公司胜利分公司

Staged fracturing well completion method using hydraulic-controlled switch to open/close controllable valves

The invention relates to a staged fracturing well completion method using a hydraulic-controlled switch to open / close controllable valves, is used for staged fracturing well completion of sleeves in petroleum horizontal wells or vertical wells, and can meet the development demands of low-permeability reservoir and unconventional oil gas resources. The method comprises: arranging openable / closable control valves the number of which is corresponding to the layer stages required to be staged-fractured in a well in a fracturing well completion tubular pile, and installing the control valves in the well; connecting a set of hydraulic-controlled switch tool to the bottom by using a connecting oil pipe to obtain an operation tubular pile, and installing in the fracturing well completion tubular pile; and carrying out hydraulic control on the operation tubular pile, and opening / closing the selected openable / closable control valves in the fracturing well completion tubular pile by using the hydraulic-controlled switch so as to finish staged fracturing well completion construction of the sleeves in the well stage. The staged fracturing well completion method has the advantages that: controllable valves with maximum latus rectum can be used according to the specific condition of the well completion tubular pile; a set of hydraulic-controlled switch can realize opening / closing of multiple controllable valves; the fracturing stage number is not limited; sleeve sand fracturing well completion can be adopted in stratum; and the demands of large output and large-scale fracturing transformation can be met.
Owner:CHINA PETROLEUM & CHEM CORP +1

Rotary control stepless ball fracturing sliding sleeve

The invention relates to the technical field of ball fracturing sliding sleeves, in particular to a rotary control stepless ball fracturing sliding sleeve. The rotary control stepless ball fracturing sliding sleeve comprises an upper connector, a sliding sleeve body, a lower connector, an inner sliding sleeve and a rotary control sliding sleeve. The outer side of the lower portion of the upper connector and the inner side of the upper portion of the sliding sleeve body are fixedly installed together. The inner side of the lower portion of the sliding sleeve body and the outer side of the upper portion of the lower connector are fixedly installed together. The lower portion of the inner sliding sleeve and the sliding sleeve body are fixedly installed together through shear pins. Two or more internal fracturing holes are distributed in the upper portion of the inner sliding sleeve along the circumference. The rotary control stepless ball fracturing sliding sleeve is reasonable and compact in structure and convenient to use, stepless ball fracturing is achieved, technical support is provided for opening all fracturing reservoirs through fracturing balls in the same size, the number of fracturing layers is not restrained by the diameters of fracturing balls, pressure loss at ball seats with different diameters in the existing fracturing operation process is reduced, ball seat grinding and milling procedures are omitted, fracturing efficiency is improved, fracturing cost is reduced, and the rotary control stepless ball fracturing sliding sleeve can be applied to underground fracturing production increase operation.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Optimized design method for positions of horizontal well segmented multi-cluster fracturing perforation clusters

The invention relates to an optimized design method for the positions of horizontal well segmented multi-cluster fracturing perforation clusters. The optimized design method comprises the steps that first, the positions of the perforation clusters of a first fracturing segment are determined according to borehole characteristics and development requirements; second, induced stress generated at a crack of the last perforation cluster of the first fracturing segment is calculated; third to sixth, the position of the first perforation cluster of an N fracturing segment is initially selected; seventh to tenth, the position of the next perforation cluster is initially selected, till the transverse transformation ranges of a perforation cluster crack and a previous perforation cluster crack are connected end to end; eleventh, the seventh step to the tenth step are repeated, till the requirement of the N fracturing segment number design is met; twelfth, the effective net pressure and induced stress of a crack at the last perforation cluster of the N fracturing segment relative to a stratum close to an (N+1) fracturing segment are calculated; and thirteenth, N is equal to N+1, the third step to the twelfth step are repeated, till the requirement of the transformation length of the horizontal segment of a well is met. The optimized design method better conforms to the actual working condition of segmented multi-cluster fracturing.
Owner:来安县永阳知识产权运营有限公司

Dual-cluster hydraulic jet tubular column and dual-cluster hydraulic jet annulus fracturing method

The invention provides a dual-cluster hydraulic jet tubular column and a dual-cluster hydraulic jet annulus fracturing method. As a CTY-211 packer is provided with a check valve device, the pressure in an oil pipe is increased by increasing the discharge capacity, so as to enable fluid in a sliding sleeve spray gun and a single-stage spray gun to form high-speed jet flow for perforation. After the perforation is finished, the tubular column is lifted by 1.5 meters and then put down until a pressure gauge indicates the pressure change of 8-10 tons, namely the packer is set, then the sliding sleeve spray gun is in a blockage state after a well mouth is closed and the tubular column is lifted, and sand fluid is simultaneously injected into an oil sleeve annulus and the oil pipe for carrying out fracturing. The sand fluid in the oil pipe carries out fracturing only through the lower single-stage spray gun and can prevent sand plugging and reduce friction resistance, so that the service life of a spray nozzle is greatly improved. The oil sleeve annulus can carry out large-capacity fracturing, so the fracturing efficiency is improved, multilayer fracturing during once drill-down is realized, and the occurrence of hazards is reduced. After the fracturing is finished, the oil pipe and the oil sleeve annulus can be cleaned in a manner that fluid is injected into the oil pipe and flows out from the oil sleeve annulus.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

High-salt-resistant viscoelastic surfactant cleaning fracturing fluid and preparation method thereof

The invention discloses a high-salt-resistant viscoelastic surfactant cleaning fracturing fluid and a preparation method thereof. The fracturing fluid contains a cationic surface active agent, and thestructural formula of the cationic surface active agent is shown as the following formula. In the formula, R<1>' is selected from saturated alkyls with a carbon number n meeting a relationship of 16<=n<=24, unsaturated alkyls with a carbon number n meeting a relationship of 16<=n<=24, and a compound as shown in the following formula, wherein R<1> is selected from saturated alkyls with a carbon number n meeting a relationship of 16<=n<=24, and unsaturated alkyls with a carbon number n meeting a relationship of 16<=n<=24; and R<2> is selected from saturated alkyls with a carbon number C meetinga relationship of 3<=C<=7, unsaturated alkyls with a carbon number C meeting a relationship of 3<=C<=7, and short-chain alkylbenzene (C<=5). The cationic surfactant has good resistance to inorganic salts, and the principle is that the R<2> substituent groups block mutual proximity between polar head groups of the cationic surface active agent under a high-mineralization-degree condition, and thenprecipitation of the cationic surface active agent is avoided, so that the micelle continues keeping a dense three-dimensional network structure, and tackifying performance is improved.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Casing cementing full-bore infinite stage staged fracturing well completion device and fracturing well completion method thereof

PendingCN114482958ARealize any fixed-point openingStaged fracturing stages are not limitedFluid removalWell/borehole valve arrangementsHorizontal wellsWell cementing
The invention discloses a casing well cementation full-bore infinite stage staged fracturing well completion device and a fracturing well completion method thereof. The fracturing well completion device and the fracturing well completion method are suitable for fracturing well completion processes of horizontal wells and vertical wells. The device comprises a casing string, a plurality of hydraulic casing centralizers, a plurality of fracturing well completion sliding sleeves, a plurality of differential pressure type fracturing well completion sliding sleeves, a long-wing well cementation rubber plug, a bump pressure seating valve and a bottom circulating valve, and the hydraulic casing centralizers and the fracturing well completion sliding sleeves are connected to the casing string in a matched mode to form the casing well cementation full-bore infinite stage staged fracturing well completion device. The fracturing well completion sliding sleeve is of a full-bore design, and the opening tool and the fracturing well completion sliding sleeve are matched one by one to complete the sliding sleeve opening action. The staged fracturing stage number is not limited; the one-key one-opening of the fracturing well completion sliding sleeve at any fixed point can be realized, the one-key multi-opening of the one-stage multi-cluster fracturing well completion sliding sleeve can also be realized, the full bore of a well completion pipe string is realized after fracturing, the continuous, rapid, large-scale, multi-stage and multi-cluster fracturing construction requirements are met, and the fracturing efficiency is improved.
Owner:CHINA PETROLEUM & CHEM CORP +1

Staged fracturing slide sleeve opening-closing device

The invention relates to a staged fracturing device in the field of petroleum machinery, in particular to a staged fracturing slide sleeve opening-closing device, comprising an upper connector, an upper connection sleeve, a center tube, an upper fixing sleeve, a spring, an upper inner slide sleeve, an upper slide support, a connection rod, a slide sleeve opening-closing claw, a pin, a lower slidesupport, a lower fixing sleeve, a lower inner slide sleeve, a lower connection sleeve and a lower connector. The upper end of the upper connector is connected with a tubing; the lower end of the upperconnector is in threaded connection with the upper end of the upper connection sleeve; the lower end of the upper connection sleeve is in threaded connection with the upper end of the upper fixing sleeve; the right end of the upper fixing sleeve is provided with the upper slide support. In principle, elastic potential energy of the spring is stored and released under the action of a high-pressurefluid so that the slide sleeve opening-closing claw is extended and contracted, thereby opening or closing a fracturing slide sleeve. The staged fracturing slide sleeve opening-closing device has theadvantages that the staged fracturing slide sleeve opening-closing device is simple in structure and convenient to operate, can run stably and reliably, can meet the field requirements of various conditions for open-hole staged fracturing of a multi-stage slide sleeve of a horizontal well, and can provide full fracturing development for reservoirs.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Preparation method of metal chelate and high-temperature polymer fracturing fluid

The invention provides a preparation method of a metal chelate and a high-temperature polymer fracturing fluid, and the method comprises the following steps: carrying out chelation reaction on a high-valence metal substance and a ligand substance in water to obtain the metal chelate, wherein metal in the high-valence metal substance is zirconium and/or titanium, the ligand substance comprises a weak coordination substance and a strong coordination substance, the weak coordination substance is polyhydric alcohol and/or polyhydric alcohol amine, and the strong coordination substance is organic acid and/or organic acid salt. The high-temperature polymer fracturing fluid provided by the invention mainly comprises a polymer thickening agent, the metal chelate cross-linking agent, a cleanup additive, a clay stabilizer and a demulsifying agent, and can still realize the effect of delaying cross-linking under a high-temperature condition. The fracturing fluid has the advantages of high temperature resistance, shearing resistance, temperature control crosslinking, low friction resistance, low filtration loss and the like, is suitable for fracturing transformation of ultra-high-temperature deep well reservoirs, and solves the problems of high viscosity and high friction resistance of a tubular column temperature control fracturing fluid in ultra-deep and ultra-high-temperature well fracturing large-displacement construction.
Owner:中石化石油工程技术服务有限公司 +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products