The invention relates to a
virtual power plant multi-energy flow distributed cooperative regulation and control method, and belongs to the technical field of telecommunication. According to the method, uncertain factors and time
delay of multi-energy flow response regulation are considered, loads are brought into the range of energy flow, the
adaptive capacity of a model to user behavior uncertainty is enhanced, time
delay of
natural gas flow response scheduling is also considered, and therefore the response efficiency of a
system under the uncertain condition is improved. Risk income comprehensive evaluation is introduced into distributed energy flow optimization, the influence of scheduling increment on the user demand satisfaction probability and the
virtual power plant income is considered, and a traditional ADMM optimization framework is expanded. According to the method, the
penalty factor in the ADMM method is improved, the
penalty factor is dynamically adjusted through comprehensive evaluation based on regulation and control risk benefits, the importance of optimization problems and constraint conditions is balanced, the convergence speed of the
algorithm is increased, and the regulation and control cost is reduced.