The invention provides a well-cementing operation
simulation training
system, which comprises a double-engine double-pump
mortar mixing sledge, an
air compressor sledge, a vertical
lime discharging tank, a pressure balancing tank, a cementing head and
wellhead device, and a
simulation control module, wherein the double-engine double-pump
mortar mixing sledge comprises engines, gear boxes, a
plunger pump, a sledge seat, a tank body and high and low pressure manifolds; the tank body is connected to the sledge seat; the engines, the gear boxes and the
plunger pump are sequentially connected; the
air compressor sledge comprises a sledge frame, an
air compressor, an air
storage tank and a freeze-
drying machine; the air
storage tank, the air compressor and the freeze-
drying machine are sequentially connected, and are arranged on the sledge frame; the cementing head and
wellhead device comprises a simulated cementing head structure and a simulated
wellhead device; and the
simulation control module acquires and simulates the information of the double-engine double-pump
mortar mixing sledge, the air compressor sledge, the vertical
lime discharging tank, the pressure balancing tank and the cementing head and wellhead device, and feeds the information back. By adopting the double-engine double-pump mortar mixing sledge, the air compressor sledge, the vertical
lime discharging tank, the pressure balancing tank, the cementing head and wellhead device and the
simulation control module, the well-cementing operation
simulation training system can completely simulate a
well cementing operation process and fault
processing and bring convenience to trainees to master
well cementing operation and fault
processing processes in all aspects, along with extremely high practicability.