The invention relates to the technical field of constructional
engineering and discloses a construction method for a pit-in-pit profile steel interior support of a super high-rise building. The construction method comprises steps as follows: S1, adopted steel sheet piles are subjected to receiving inspection and stacked; S2, positioning paying-off is carried out firstly, and then a guide bracket is mounted; S3, Larsen steel sheet piles are subjected to
pile driving; S4, a stand column, a first support and a second support are mounted; and S5, the interior support and the steel sheet piles aredismantled to be recovered. According to the construction method for the pit-in-pit profile steel interior support of the super high-rise building, a
pile driver strikes the Larsen steel sheet piles and the stand column and then steel enclosing
purlin and profile steel support beams are mounted, a complete profile steel
support system is formed, after early pouring maintenance of a
tower raft is finished, the profile steel supports are dismantled and recovered, nodes of the pit-in-pit profile steel interior support of the super high-rise building are optimized, the nodes comprise collision nodes of the profile steel stand column and reinforcements, connecting nodes of the stand column and the support beams and connecting nodes of the enclosing
purlin and the steel sheet piles, and therefore, the problem of inconvenience in subsequent mounting and
recovery is effectively solved.