Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

84results about How to "Shorten calculation time" patented technology

Calibration method for measuring tree trunk moisture content by time domain reflectometry (TDR)

The invention provides a calibration method for measuring the tree trunk moisture content by a time domain reflectometry (TDR). According to the method, the TDR and a scale are respectively utilized for continuously measuring the tree trunk section moisture content (moisture content measuring value) and the wet weight, in addition, a baking method is adopted for obtaining the dry weight of the tree truck section, the measured dry weight and wet weight data of the tree truck section can be utilized for calculating the corresponding moisture containing weight during the tree trunk moisture content measurement by using the TDR in each time, the corresponding moisture content (real value) can be calculated according to the timber water content definition, and the quantitative relationship between the real water content and the corresponding moisture content measuring value data according to the obtained real water content of the tree trunk section and the corresponding moisture content measuring value data, so a calibration model for measuring the tree trunk moisture content by using the TDR is obtained. According to the calibration model, the TDR can be utilized for carrying out in-situ dynamic monitoring on the moisture content of the live tree trunk, so the tree trunk moisture content measuring process is simplified, and in addition, the measuring precision is improved.
Owner:LUDONG UNIVERSITY

Aircraft winglet expansion amount optimization method based on Gaussian pseudo-spectrum method

InactiveCN109858106AOptimizing the retraction of wingletsShorten calculation timeSpecial data processing applicationsState variableEngineering
The invention discloses an aircraft winglet expansion amount optimization method based on a Gaussian pseudo-spectrum method, which comprises the following steps of: establishing constraint conditionsof a winglet expansion track of a climbing section of a near-space variable-wing aircraft, including boundary constraint, path constraint, state variable and control variable constraint; establishinga performance index function of the small wing telescopic track of the climbing section of the near-space variable-wing aircraft, wherein the performance index function is established according to a target with the most fuel-saving effect; discretizing the established continuous optimization control problem by adopting a Gaussian pseudo-spectrum method so as to convert the discretized continuous optimization control problem into a nonlinear programming problem, and solving the nonlinear programming problem to obtain an optimal near-space variable-wing aircraft climbing section winglet telescopic track. According to the method, the expansion amount of the winglet of the climbing section of the near-space variable-wing aircraft can be optimized within a short time, and the control target ofthe minimum fuel consumption is achieved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Implicit staggered-grid finite difference elastic wave numerical simulation method and device

ActiveCN105911584AImprove errorImprove numerical solution accuracySeismic signal processingWave equationWave field
The invention discloses an implicit staggered-grid finite difference elastic wave numerical simulation method and device. The method comprises the steps that a dispersion relation expression is obtained based on an implicit staggered-grid finite difference scheme and a plane wave theoretical formula; (M+1) discrete points are evenly taken within the value range of beta in the dispersion relation expression, and the left and right sides of the dispersion relation expression are set to be equal on the discrete points so that a linear algebraic equation set is obtained; the linear algebraic equation set is solved so that the implicit staggered-grid finite difference coefficient am and constant b are obtained; an elastic wave equation is solved based on the implicit staggered-grid finite difference coefficient am, the constant b and the implicit staggered-grid finite difference format; and a wave field diagram is generated according to the solving result and wave field analysis is performed according to the wave field diagram. The solving error of the elastic wave equation can be reduced and the numerical solution accuracy can be enhanced so that a more accurate wave field stimulation record can be obtained. When the same calculation error is constrained, calculation time can be reduced and calculation efficiency can be enhanced.
Owner:INST OF GEOLOGY & GEOPHYSICS CHINESE ACAD OF SCI

Distributed power supply-containing power distribution network reconstruction method and system based on binary differential evolution algorithm of hybrid strategy

The invention discloses a distributed power supply-containing power distribution network reconstruction method and system based on a binary differential evolution algorithm of a hybrid strategy, and the method comprises: building a mathematic model of power distribution network reconstruction, and enabling the minimum network loss of a power distribution network to serve as a target function; determining a node type after the distributed power supply is connected into the power distribution network; encoding the feasible solution of the power distribution network by adopting an improved binaryencoding mode, and initializing a population; selecting different mutation strategies by adopting a comparison mode of a current generation optimal individual and a previous generation optimal individual based on weight, and detecting and repairing an invalid solution appearing after mutation operation; adopting a heuristic self-adaptive crossover probability calculation mode, adopting a harmonysearch strategy to optimize crossover operation, and finally completing the crossover operation in a mode of taking a binary string as an individual; and updating a harmony library strategy by utilizing a harmony search algorithm to complete selection operation. Compared with the prior art, the method and the system have the advantages of high robustness, good optimization performance, low convergence algebra and the like.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Training method and device of load prediction model, readable medium and electronic equipment

The invention discloses a training method and device of a load prediction model, a readable medium and electronic equipment, and relates to the field of computers, and the method comprises the steps:obtaining training data features of a plurality of historical load prediction tasks and a selected historical algorithm; taking the training data characteristics of each historical load prediction task and the selected historical algorithm as one piece of training data, and performing machine learning according to each piece of training data to obtain an algorithm selection model; obtaining a plurality of pieces of sample load data of the current load prediction task, and extracting current data characteristics of each piece of sample load data; predicting a current algorithm matched with thecurrent data feature from all historical algorithms through an algorithm selection model; obtaining at least one hyper-parameter corresponding to the current algorithm; and according to the current algorithm, the at least one hyper-parameter and each sample load data, training to obtain a current load prediction model. According to the technical scheme, the calculation time can be shortened, the calculation resources are saved, and the manual intervention degree is reduced.
Owner:XINAO SHUNENG TECH CO LTD

Data processing method and device, computer readable medium and electronic equipment

The invention belongs to the technical field of video encoding and decoding, and particularly relates to a data processing method, a data processing device, a computer readable medium and electronic equipment. The data processing method comprises the following steps: obtaining quantized data obtained by encoding a video image, wherein the quantized data is a numerical matrix comprising a zero value and a non-zero value; obtaining non-zero value position information of the non-zero value in the quantized data, and determining a non-zero region in the quantized data according to the non-zero value position information, the non-zero region being a matrix row or a matrix column in the numerical matrix; performing inverse quantization decoding on the quantized data to obtain inverse quantization data; and performing inverse transformation decoding on the inverse quantization data according to the non-zero region to obtain reconstruction data of the video image. According to the method, thecalculation duration and the calculation capability requirement of inverse transformation encoding can be dynamically reduced according to the distribution condition of the non-zero region in the quantized data, so that the calculation speed can be increased, and calculation resources are saved.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Data synthesis method, device and equipment and storage medium

The invention discloses a data synthesis method and device, data synthesis equipment and a storage medium, and belongs to the technical field of data processing. The method comprises the following steps: acquiring a two-dimensional image of a target object, and performing three-dimensional mapping on the two-dimensional image of the target object to obtain a three-dimensional model of the target object; obtaining a three-dimensional model of the additional data; and matching the three-dimensional model of the target object with the three-dimensional model of the additional data through the texture coordinates of the target pixels, and obtaining an image of the target object for synthesizing the additional data according to a matching result. A three-dimensional model of a target object isobtained by performing three-dimensional mapping on a two-dimensional image of the target object, and the three-dimensional model of the target object and the three-dimensional model of the additionaldata are matched in a texture coordinate mode to obtain an image of the target object for synthesizing the additional data, so that three-dimensional data synthesis can be realized through a 2D camera, and the cost is relatively low. In addition, multiple modeling is not needed, so that the calculation time is saved, and the data synthesis efficiency is higher.
Owner:BEIJING SANKUAI ONLINE TECH CO LTD

A carrier frequency offset estimation method of a baseband signal and a device thereof

ActiveCN109067680ASimple calculationHigh carrier frequency offset estimation accuracyCarrier regulationFrequency spectrumCarrier frequency offset
A carrier frequency offset estimation method of baseband signal and device thereof, the carrier frequency offset estimation method comprises the steps of baseband signal acquisition, complex signal calculation, complex signal frequency spectrum shifting, complex signal resampling, useful spectrum line frequency point sequence number acquisition and carrier frequency offset estimation, etc. As thecomplex signal after spectrum shifting is resampled, the sampling rate of the system can be matched to a fixed value, so that FFT processing with a fixed number of points can be adopted to obtain a spectral sequence including useful spectral lines, so that the system can obtain the frequency point number corresponding to the useful spectral line without increasing the number of FFT points, but also simplifies the calculation process of obtaining the frequency point serial number. On the premise of guaranteeing the higher precision of carrier frequency offset estimation, it can speed up the processing speed, further reduce the calculation time and the running cost of the system, and finally help to improve the real-time performance of OQPSK signal in demodulation processing and carrier frequency offset estimation processing.
Owner:SHENZHEN CITY SIGLENT TECH

Simulation calculation method for air inlet amount of cabin heat exchanger under transient driving condition

The invention discloses a simulation calculation method for the air inlet amount of a cabin heat exchanger under a transient driving condition, which comprises the following steps of: determining sampling points ai, performing steady-state simulation calculation on each sampling point ai, and outputting a statistical average value Q1 of the simulated air inlet rate of each sampling point ai; fitting the sampling points ai with the corresponding average value Q1 of the air inlet volume to obtain a relational expression between the vehicle speed and the air inlet volume, selecting a test point bi, and substituting the test point bi into the relational expression to obtain a statistical average value Q2 of the calculated air inlet volume of the test point; carrying out steady-state simulation calculation on the test point bi, and obtaining the statistical average value Q2b of the simulation air inlet amount of the test point; at the moment, determining a precise relational expression; at the moment, re-planning the sampling point ai; importing the vehicle speed under the transient driving working condition into the determined accurate relational expression, and obtaining a relation curve of the air inlet amount of the cabin heat exchanger under the transient working condition, wherein the air inlet amount of the cabin heat exchanger comprises the air inlet quantity of a radiator and the air inlet quantity of a condenser; predicting transient driving conditions by discretizing a transient process into a plurality of steady-state calculation processes.
Owner:JILIN UNIV

Improved continuum structure topological optimization post-processing method

The invention discloses an improved continuum structure topological optimization post-processing method. The improved continuum structure topological optimization post-processing method is characterized by adopting a large grid size, namely, the size of a finite element analysis unit being larger than a default value 1, and when topological optimization is conducted on a target model, effectivelyavoiding a fine columnar structure caused by too many grids; and performing binarization processing on the optimization model, analyzing the optimization model, extracting a zigzag boundary line, obtaining a target discrete angular point set through numerical calculation, performing curve fitting by taking the target discrete angular point set as a sample point, performing further interpolation processing on the obtained new boundary line to generate a topological structure with a smooth boundary, and performing entity processing on the topological structure. According to the method provided by the invention, the sawtooth boundary of the optimized structure is effectively eliminated, the original design requirement of the optimized structure is ensured, the calculation difficulty is reduced, the calculation duration is shortened, the model manufacturability is enhanced, and the difficulty of a topological optimization post-processing procedure is effectively reduced.
Owner:SICHUAN UNIV

Distributed score card model establishing method

The distributed score card model establishing method comprises the following steps: binning sample data of each label variable into N sample intervals, and calculating chi-square values of adjacent intervals; combining the adjacent intervals corresponding to the minimum chi-square value into a new interval, judging whether the number of the combined intervals reaches the target number or not, if so, executing S3, or otherwise, executing S4; S3, carrying out monotonicity testing on the chi-square values, calculated by the combined intervals, of the adjacent intervals, if the chi-square values are monotonous, executing the step S5, and if not, combining the adjacent intervals corresponding to the minimum chi-square value into a new interval, and executing the step S3; S4, recalculating the chi-square value of each combined adjacent interval and executing the step S2; and S5, judging whether the proportion of the sample data of the interval exceeds a set proportion value, if so, abandoning the label variable, otherwise, calculating an information credit investigation value of the interval, selecting the label variable of which the information credit investigation value reaches a preset requirement as a target label variable, and substituting the sample data of the target label variable into model training.
Owner:上海新颜人工智能科技有限公司

Method and system for identifying relationship between household meter and meter box, equipment and medium

The invention discloses a method and system for identifying a relationship between a user meter and a meter box, equipment and a storage medium; the method comprises the steps: firstly, calculating voltage correlation based on a Pearson's correlation coefficient algorithm to rapidly and accurately judge the attribution relationship between the user meter and a branch, greatly shortening the calculation time, and reducing the data size of subsequent calculation; and then constructing a multiple linear regression model, and accurately obtaining the phase of the single-phase user meter based on a mean square error calculation result of each model; finally, constructing combination types of relations between all household meters and meter boxes under each branch, numbering the combination types in sequence, calculating to obtain offset loss of each meter box under the combination types, and performing principal component analysis, thereby quickly and accurately identifying the relation between the household meters and the meter boxes under each branch. Besides, the electricity consumption is adopted as analysis data, and the current I, the voltage U and the active power P are adopted, so that the calculation result is not interfered by empty households, and the accuracy of the identification result is further ensured.
Owner:BEIJING TENGINEER AIOT TECH CO LTD

Bayesian optimization design method of metal-dielectric multilayer columnar optical nano antenna

ActiveCN110162904AOptimizing Scattering EfficiencyQuickly optimize scattering efficiencyDesign optimisation/simulationSpecial data processing applicationsAntenna designDielectric
The invention provides a bayesian optimization design method of a metal-dielectric multilayer columnar optical nano antenna, which comprises the following steps: S1, constructing a structure parametercandidate set according to antenna design requirements; s2, determining an optimization objective function as a far-field directivity coefficient, and setting a constraint function at the same time;s3, setting an initial training parameter set and obtaining a corresponding optimization objective function value and a corresponding constraint function value, taking the three sets as a training set, and setting an initial value of iteration times k; s4, training hyper-parameters in the Gaussian model according to the training set; s5, selecting a next candidate parameter; s6, calculating an objective function value and a constraint function value corresponding to the candidate parameter; and S7, judging whether the objective function values corresponding to the candidate parameters meetingthe constraint conditions meet cut-off conditions or not. The method has the advantages that the method is optimized through Bayesian optimization, the calculation time can be effectively shortened, the design efficiency is improved, and the purpose of quickly optimizing the antenna scattering efficiency is achieved.
Owner:HARBIN INST OF TECH SHENZHEN GRADUATE SCHOOL

Method and device for estimating time-frequency offset of narrowband Internet of Things, and storage medium

The invention provides a narrowband Internet of Things time-frequency offset estimation method and device, and a storage medium. The method comprises the steps that at least one piece of preset sampling rate subframe data is acquired; performing self-correlation operation on a plurality of orthogonal frequency division multiplexing symbols in the preset sampling rate subframe data to generate a plurality of self-correlation operation values; when the plurality of self-correlation operation values meet a preset time offset estimation condition, determining a time offset value of a main synchronization signal of the narrowband Internet of Things; carrying out frequency offset value calculation on a plurality of orthogonal frequency division multiplexing symbols in the preset sampling rate subframe data by adopting a frequency offset estimation algorithm, and generating a frequency offset value of a main synchronization signal of the narrowband Internet of Things; and outputting the time offset value and the frequency offset value of the main synchronization signal of the narrowband Internet of Things. In this way, the calculation amount of the time-frequency offset of the narrowband Internet of Things is reduced, and then the calculation duration is shortened.
Owner:广州粒子微电子有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products