The invention discloses a multi-ball-point embedded pile for geological disaster early warning, and belongs to the field of geological disaster early warning. The multi-ball-point embedded pile for geological disaster early warning is characterized in that through the arrangement of the embedded pile, when geology sinks, a pre-broken sinking rod bears downward pressing force and acts on an outer marking end below the sinking rod, so that the surface of a marking ball is notched, and color sand inside flows out; and after the pre-broken sinking rod is broken and loses downward pressing force, the outer marking end recovers deformation, a notch disappears, the color sand stops overflowing, when it is detected that sinking exists in the embedded pile, soil near the embedded pile can be excavated, the specific sinking situation is judged according to the amount of the color sand, meanwhile, after the pre-broken sinking rod is broken, spikes gradually get close to an inner light breaking ball until the inner light breaking ball is punctured, so that fluorescent liquid in the inner light breaking ball overflows, the geological sinking position can be marked in an auxiliary manner, workers can judge the geological sinking condition visually, corresponding solutions can be taken conveniently, and potential safety hazards are reduced.