16 results about "Mixed programming" patented technology

Intelligent stowage service method for import and export multimodal transport based on hybrid planning algorithm

The invention relates to the technical field of intelligent logistics and operation planning optimization, and discloses an import and export multimodal transport intelligent stowage service method based on a hybrid planning algorithm, which comprises the following steps: establishing an intermodal transport node operation impact database and an intermodal transport network diagram, and defining a node stacking operation state set; according to the force transmission attribute of the corner column of the container, the discrete stacking hierarchy is mapped into vertical pre-pressure, and the node working condition inherent frequency of the container-cargo combination is calculated through a pre-pressure and rigidity correlation model; in combination with node pulse dominant frequency data, constructing a response gain index including resonance interval intensity and parameter fluctuation sensitivity; and establishing a multimodal transport stowage optimization model, bringing the index into a target function, and carrying out collaborative solution on a cargo loading layout, a transport link and a node stacking level. Resonance risks caused by discrete stacking and lateral impact coupling can be effectively recognized and avoided, and a stowage scheme with high structural safety is output.
Owner:TUOPU SILU (NANJING) TECH CO LTD

Compiler infrastructure based on multi-order intermediate representation and implementation method thereof

The invention relates to a compiler design and code optimization technology, in particular to a compiler infrastructure based on multi-order intermediate representation and an implementation method of the compiler infrastructure. A traditional compiler adopts single intermediate representation, so that the coupling degree of the optimization process is high; the method is closely related to high-level / low-level languages, so that the compiler is poor in universality. In order to solve the problems, the invention provides the compiler infrastructure based on the multi-level intermediate representation and the implementation method of the compiler infrastructure, through modular design and hierarchical processing, the relevance of high-level / low-level languages is stripped, and the multi-level intermediate representation is designed, so that the problem that the compiler infrastructure cannot be used in the process of converting the high-level languages into the low-level languages is solved; the processing complexity of the control flow and the data flow is high, the universality is poor, and the subsequent maintenance difficulty is high. The method is suitable for real-time compiling, heterogeneous hardware adaptation and multi-language mixed programming and static optimization scenes, and the development and maintenance cost of the compiler can be greatly reduced.
Owner:朱征赜

Code detection method and device, computer equipment and storage medium

The invention relates to a code detection method and device, computer equipment, a storage medium and a computer program product. The method comprises the steps of obtaining a to-be-detected code project; for any code file in the to-be-detected code project, obtaining a syntax tree structure and an index tree structure corresponding to the code file by calling a code analysis interface matched with the programming language type of the code file; according to the programming language type to which any code file belongs, determining each code detection rule for any code file; and for any code file, detecting the code file by using the target tree structure adaptive to each code detection rule of the code file to obtain a code detection result of the code file under each code detection rule. By adopting the method, multi-level detection can be efficiently, comprehensively and flexibly carried out on the single programming language project and the mixed programming language project.
Owner:GUANGZHOU QUYAN NETWORK TECH CO LTD

Debugging method and electronic equipment

A debugging method and an electronic device relate to the technical field of computers, and dynamically call a debugging interface of a second programming language by registering the debugging interface of the second programming language in a first programming language debugger, thereby obtaining call stack information and variable information of the second programming language, setting breakpoints, modifying variables and the like. In the method, the electronic equipment displays a debugging interface of a debugger adaptive to a first programming language, and loads a service program which is subjected to mixed programming by adopting the first programming language and a second programming language to test equipment. A runtime debugging interface is configured in the runtime matched with the second programming language. During debugging, when a service process runs to a first service code segment obtained by programming of a first programming language, a debugging breakpoint is entered, and the electronic equipment calls a runtime debugging interface through a debugger registered with the runtime debugging interface; and executing debugging processing operation on a second business code segment obtained by programming in the business program loaded by the test equipment by adopting the second programming language.
Owner:HUAWEI TECH CO LTD

Automatic burning method and system suitable for laser radar production line

PendingCN121523711ASoftware engineeringClosed loopMixed programming
The invention provides an automatic burning method and system suitable for a laser radar production line. The implementation method comprises the steps of order analysis, power supply configuration, burning configuration, firmware package downloading and function verification. The production line automatic burning system is designed and realized based on the method, is verified and used in a production line, and comprises an upper computer control system, a burner, a burning jig and a programmable power supply, the method has the following advantages that 1, the method is combined with an MES system, the radar model, the hardware version and the firmware package issued by the MES system are automatically mapped, and mixed burning of a production line is achieved; 2, the replicability is high, convenience is provided for copying of a production line, the integration level is high, a downward compatible mechanism facing full automation and semi-automation is realized, and a foundation is laid for automatic upgrading of a subsequent production line; 3, a read-back-function verification-closed loop mechanism is adopted, key information read-back is performed on each radar, and meanwhile, through dual verification of chip self-weight starting and power supply external restarting, the reliability of the system is improved; the method has the advantages of being simple in structure, convenient to operate and capable of executing relevant functions to conduct good detection on radar key chips, preventing non-benign radars from flowing into follow-up stations, indirectly reducing production cost, recording burning information of the key chips, and achieving traceability of the radars in the whole life cycle.
Owner:TIANMU XINWANG (SUZHOU) TECHNOLOGY CO LTD

Visual programming method and system and storage medium

The invention discloses a visual programming method and system and a storage medium, and belongs to the technical field of game editing.A mixed programming method of main process visual nodal and node parameter scripting is adopted, a main process tree is constructed through visual nodes, node parameter scripting is achieved in cooperation with a user-defined script language zScript, main logic and parameter details are separated, and the main process visual nodal and node parameter scripting efficiency is improved. Nodes on the graph are fewer and simplified, the main process is free of interference of parameter details, the information amount is greatly reduced, the main process is higher in readability, the problems that traditional visual programming is poor in readability and bug checking is difficult are solved, a user-defined script language zScript is matched with an intelligent coding window, and compared with a dragging mode in the prior art, when complex logic details are constructed, the method has the advantages that the complexity is reduced, and the efficiency is improved. The research and development efficiency is higher, and logic construction requirements of non-program and program personnel can be considered.
Owner:XIAMEN LEITING INTERACTION NETWORK CO LTD

A multi-objective intelligent scheduling method fusing AI inventory prediction and hybrid planning

PendingCN122509538AHybrid programmingMulti source data
The application relates to the technical field of intelligent production scheduling, and discloses a multi-target intelligent production scheduling method combining AI inventory prediction and hybrid programming. The method first standardizes and integrates multi-source data such as enterprise digital factories and warehouses, and constructs a unified production scheduling database; then a linear programming model is established with the target of maximizing profits, and product production quota optimization is completed in combination with constraints such as production capacity and raw materials; based on a switching cost matrix and production constraints, the lowest cost production sequence is solved through dynamic programming; an AI inventory prediction model is constructed by using a random forest regression, and safe inventory calculation and inventory risk grading early warning are realized; finally, multi-target production scheduling is executed according to the multi-level dynamic adjustment principle, and complete schemes such as hour-level plans, Gantt charts, cost and profit, and inventory curves are output. The application can simultaneously optimize production profit, switching cost, demand satisfaction rate and inventory safety, realize active inventory prediction, effectively reduce production loss caused by material interruption and single insertion, and improve the scientific nature of production scheduling and enterprise operation benefits.
Owner:YUNNAN YUNTIANHUA INFORMATION TECHNOLOGY CO LTD +1

Virtual testing method of hydrogen storage cylinder of fiber reinforced composite material by introducing random wrinkle defects and probability distribution thereof

The virtual testing method of the fiber reinforced composite hydrogen storage cylinder with random wrinkle defects and its probability distribution is introduced, which comprises the following steps: S1, a mesoscopic mechanics model of the wrinkle defects in the fiber reinforced composite material is established; S2, a finite element model of the fiber reinforced composite hydrogen storage cylinder is established, and the elements are divided and numbered; S3, based on the MATLAB- Python program mixed programming, a parameterization and cross-scale implantation method of the random wrinkle defects in the fiber reinforced composite hydrogen storage cylinder is established; S4, the virtual testing of the fiber reinforced composite hydrogen storage cylinder with random wrinkle defects and its probability distribution is carried out under internal pressure loading, and the mechanical response output results are obtained. Based on the parameterization and cross-scale method, the modeling complexity of the wrinkle defects in the macroscopic structure is simplified, and the modeling efficiency is improved; the virtual testing of the fiber reinforced composite hydrogen storage cylinder with random wrinkle defects and its probability distribution is realized.
Owner:ZHEJIANG UNIV OF TECH

Data processing method and device, intelligent calculation platform, storage medium and product

The invention discloses a data processing method and device, an intelligent calculation platform, a storage medium and a product. The method comprises the steps that in response to a request of an operator calculation task, a second API of an operator under a unified programming normal form or a third API of an operator under a native programming normal form supported by processing equipment is called based on a first API; and generating a calculation result corresponding to the operator calculation task based on the second API or the third API. Therefore, operator calling under the hybrid programming normal form can be realized based on the unified first API, so that the operation performance of operators can be effectively improved based on operator calling under the hybrid programming normal form on the basis of considering the universality of AI chips of different types of native programming normal forms, and the user experience is further improved.
Owner:CHINA MOBILE COMM LTD RES INST +1

Scheduling plan model and evaluation based on mixed programming of two conventional buses

The invention relates to the technical field of bus scheduling, in particular to a scheduling plan model based on hybrid programming of two conventional buses, which comprises a data acquisition module, a data processing module, a logic module, a preset module and an execution module. According to the method, dynamic plan response and accurate transport capacity matching of passenger flows of two conventional lines in a region are realized through a model algorithm, so that transport capacity resources in the region are optimally allocated, the operation efficiency of the two conventional lines is improved, a relatively optimal scheduling model and application are generated according to evaluation, the hybrid plan transport capacity maximization of the two conventional lines is realized, and the scheduling efficiency of the two conventional lines is improved. The method fundamentally solves the problem of tension or turnover of public transportation capacity, reduces the operation cost of a public transportation enterprise, enhances the fusion degree and integrating degree of line mixed scheduling plan distribution resources and actual production transport capacity resources according to mixed scheduling benefit index analysis, improves the line operation service level, and improves the efficiency through the effective fusion of two conventional line buses. And the effective shift utilization rate is improved.
Owner:GUANGZHOU PUBLIC TRANSPORT GRP CO LTD +1

Day-ahead scheduling method for provincial power grid with multiple pumped storage power stations

The application discloses a provincial power grid day-ahead plan hierarchical progressive optimization method containing multiple pumped storage power stations, which comprises the following steps: obtaining basic data of a power system; establishing a power system day-ahead plan optimization model containing multiple pumped storage power stations; calculating day-ahead plan output values of wind, light and conventional units; further calculating start-stop plan of each pumped storage unit according to the plan output values; and finally obtaining day-ahead output plan values of each unit by solving the pumped storage start-stop plan. The application can overcome the difficulty in convergence when the scale of integer problems and linear programming problems is large even if mature optimization solvers such as CPLEX and GLPK are used, make large-scale integer linear mixed programming problems converge better, meet the online application requirements of day-ahead plan making, and have important practical significance for fully utilizing new energy and efficiently operating pumped storage power stations.
Owner:CHINA THREE GORGES UNIV

Parallel acceleration method for C + + and MATLAB mixing

PendingCN121326512AProgram initiation/switchingResource allocationComputer Software EngineeringMixed programming
The invention relates to a parallel acceleration method for C + + and MATLAB mixing, belongs to the technical field of computer software engineering, and solves the problem that in the prior art, C + + and MATLAB mixing programming cannot meet high development efficiency, high performance and high concurrency capability on the premise of ensuring calculation accuracy. The method is executed at a C + + end, a received to-be-processed macroscopic task is decomposed, and resource demand prediction information of each sub-task is obtained based on each decomposed to-be-processed sub-task; based on each to-be-processed sub-task, the resource demand prediction information of each to-be-processed sub-task and the available MATLAB working process, task assignment of work load perception is carried out, and a calculation result of each to-be-processed sub-task is obtained; wherein the MATLAB working process communicates with the C + + through a corresponding shared memory segment; and aggregating the calculation results of the to-be-processed sub-tasks to obtain a calculation result of the to-be-processed macroscopic task.
Owner:36TH RES INST OF CETC

A source network load storage multi-time scale scheduling method based on dynamic feedback

PendingCN123034516ADeviation vectorMixed programming
The application discloses a source network load storage multi-time scale scheduling method based on dynamic feedback, relates to the technical field of power system operation control, and comprises the following steps: acquiring system operation state data, non-source load prediction data and a scheduling plan of a last scheduling period, and constructing an intra-day rolling optimization model; taking the scheduling plan of the last period as a hot start initial solution to input the model, carrying out first stage solving, and obtaining a global theoretical lower bound and a current optimal feasible solution; calculating source load prediction deviation vectors of each period, combining related data to obtain a flip urgency score of energy storage integer variables; selecting a reference number of candidate integer variables according to the score, fixing the remaining integer variables, and constructing a mixed programming sub-model; performing second stage solving with a time limit on the mixed programming sub-model, updating the optimal solution and iterating when the solution is better, and stopping until a preset termination condition is met; outputting a scheduling plan of a current scheduling period, calculating an optimal gap, and performing a hierarchical optimization strategy.
Owner:BEIJING TIANCHENG TECHNOLOGY CO LTD

Man-machine mixed programming software development method

The invention provides a man-machine hybrid software development method, which comprises the following steps of: dividing a software development activity into a plurality of tasks, establishing task messages for the tasks, configuring message formats for the task messages, and pulling task attributes of the corresponding tasks for the task messages; the human or the robot issues the task message to a task pool; the robot performs task screening in the task pool to identify and get a target task; and the robot obtains the content of the target task and runs the target task. The robot part is enabled to undertake tasks in the aspects of architecture design, software development, testing and the like, and the labor burden of software engineering personnel in project development is reduced. The tasks are screened when the robot receives the tasks in the task pool, on one hand, it can be guaranteed that the task execution process of the robot is conducted smoothly, and on the other hand, the task execution efficiency of the robot can be effectively improved.
Owner:ZHIZHISHENGONG (SHANGHAI) INFORMATION TECH CO LTD

Multi-target dynamic production and assembly integrated scheduling method

The invention discloses a multi-target dynamic production and assembly integrated scheduling method, and belongs to the technical field of production scheduling, and the method comprises the following steps: obtaining the processing and assembly information of a multi-product simultaneous generation process; based on the processing and assembling information of the multi-product simultaneous generation process, constructing a multi-product production and assembling linkage hybrid planning model; and solving the multi-product production and assembly linkage hybrid planning model based on a co-evolution algorithm to obtain a multi-product cross-workshop production and assembly coordinated processing hour-level scheduling scheme. According to the method, a cross-workshop integrated scheduling strategy is adopted, and through dynamic collaborative optimization of production and assembly, the overall production period is shortened, and the resource utilization rate is increased; the provided task network can explicitly express the dependency relationship between the part machining path and the assembly process, and the feasibility of a scheduling scheme is ensured.
Owner:NORTHEASTERN UNIV CHINA

Production line optimization method, system and electronic equipment

The present invention relates to the technical field of production management, and discloses a production line optimization method, system and electronic equipment. The method assigns a node identifier to each process node from multiple preset identifiers based on a node relationship matrix, and ensures that adjacent process nodes do not have the same node identifier, thereby obtaining multiple identifier allocation schemes. A target scheme is determined from each identifier allocation scheme according to the number of identifiers adopted, and then a set label of each process node is determined according to the node identifier of the target scheme. A linear model is established based on the set label, and the production sequence between each process node in the original production line is converted from a mixed programming problem to a linear programming problem for solution, thereby providing linear reference and linear constraints for the linear theory of the automated production line, improving the analysis accuracy of the linear theory on the automated production line, and improving the optimization effect of the automated production line.
Owner:广域铭岛数字科技有限公司 +1