In-situ protection construction method of pipeline above foundation pit

The invention discloses an in-situ protection construction method of a pipeline above a foundation pit. The in-situ protection construction method comprises the steps of (1) cracking a pavement; (2) driving two steel uprights corresponding to each of support point parts on the two ends of each truss, and erecting a middle bearing beam arranged horizontally over the two steel uprights; (3) excavating earth; (4) precipitating; (5) erecting a truss over the two opposite middle bearing beams, and arranging upper bearing beams on the top of the truss; (6) wrapping the four sides of a pipeline box culvert with steel plates to form a box culvert strengthening covering barrel, supporting the bottom of the covering barrel by using lower bearing beams, wherein the lower bearing beams correspond to the upper bearing beams one to one; and (7) connecting the lower bearing beams and the upper bearing beams through chain blocks and steel wire ropes. The in-situ protection construction method provided by the invention is capable of avoiding sedimentation deformation of the pipeline box culvert in the construction process of the foundation pit and thus in-situ protection of the pipeline is realized. The in-situ protection construction method is capable of ensuring that the sedimentation deformation value of an important pipeline without moving and modifying conditions within the construction range of the foundation pit does not exceed an allowable value and influence on the support structure and the main body structure of the foundation pit is within a controllable range.
Owner:CHINA CONSTR SIXTH ENG DIV CORP

Collapsible loess foundation rubble frame structure reinforcement system and reinforcement method

InactiveCN106677154AUneven settlement deformation avoidanceAvoid settlement deformationSoil preservationCarrying capacityGeocells
The invention belongs to the field of foundation reinforcement engineering, and relates to a collapsible loess foundation rubble frame structure reinforcement system and a reinforcement method. The reinforcement system comprises reinforced gravel piles, an earthwork standard room reinforced gravel layer, an EVA (Ethylene-Vnyl Acetate) waterproof plate, a geofabric pad layer and a concrete pavement layer. The reinforced gravel piles lengthways stretch into a collapsible loess foundation layer to be reinforced and are arranged in parallel; the earthwork standard room reinforced gravel layer is paved on the upper surfaces of the reinforced gravel piles; the concrete pavement layer, the geofabric pad layer and the EVA waterproof plate are sequentially paved on the upper surface of the earthwork standard room reinforced gravel layer from top to bottom; and the reinforced gravel piles and the earthwork standard room reinforced gravel layer are jointly grouted through pre-embedded grouting pipes and form the integral reinforced gravel frame structure reinforcement system. The invention provides the collapsible loess foundation rubble frame structure reinforcement system with reasonable structural mechanical property, good integrality and impermeability, and high carrying capacity, and the reinforcement method.
Owner:SHANXI PROVINCIAL RES INST OF COMM +1

Plain pile reinforcement system used for reserving conditions for long-term lines passing existing lines and construction method of system

InactiveCN106812134AEasy to process and manufactureAvoid formation loss and settlement deformationBulkheads/pilesSoil preservationTreatment effectEngineering
The invention relates to a plain pile reinforcement system used for reserving conditions for long-term lines passing existing lines and a construction method of the system. Under the influence of built metro lines and surroundings, later metro line building conditions are relatively strict, and in a project of passing the existing lines, conventional stratum pre-reinforcement treatment measures cannot meet the safe operation requirements of the existing lines. The system comprises existing tunnels and long-term tunnels above or below the existing tunnels, overlapping regions of planar projections of the existing tunnels and the long-term tunnels are interchanging point ranges, and plain concrete piles are arranged at the interchanging point ranges. Sleeve valve pipe grouting reinforcement areas are arranged between the existing tunnels and the long-term tunnels. By means of the system, physical and mechanical parameter indexes of interlayered soil bodies between the existing lines and the long-term lines can be effectively improved, and the safe operation of the existing lines is ensured. The system has the advantages of being flexible to arrange, adjustable in pile diameter and reliable in stratum treatment effect, and is capable of avoiding the unpredictability of a conventional stratum advance pre-reinforcement effect.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Subsurface tunnel waterstop structure used for protecting groundwater environment and construction method thereof

The invention relates to an electrified railway technology, in particular to a subsurface tunnel waterstop structure used for protecting a groundwater environment and a construction method thereof. The waterstop structure comprises a plurality of vertical frozen earth waterstop layers distributed sequentially in the tunnel direction and horizontal waterstop layers surrounding the outer contour of a tunnel, and the horizontal waterstop layers extend in the extending direction of the tunnel; the vertical frozen earth waterstop layers and the horizontal frozen earth waterstop layers intersect with each other; and the bottoms of the vertical frozen earth waterstop layers are lower than the bottoms of the horizontal frozen earth waterstop layers; and tunnel lining structures are arranged between the horizontal frozen earth waterstop layers and the tunnel. The vertical frozen earth waterstop layers and the horizontal frozen earth waterstop layers are adopted to form a cup-shaped frozen earth waterstop layer, the groundwater environment is protected, and groundwater is prevented from being polluted in the tunnel construction process. By the adoption of the frozen earth waterstop structure, large-scale drainage construction is avoided, precious groundwater resources are saved, and settlement deformation of surrounding adjacent buildings and structures caused by drainage construction is avoided at the same time.
Owner:SHANDONG GEOLOGICAL ENG INVESTIGATION INST

Rainwater collection and permeation system preventing settlement deformation of ground

ActiveCN104452941AMeet the needs of penetration and utilizationAvoid settlement deformationGround-workSewerage structuresGeomembraneSludge
The invention discloses a rainwater collection and permeation system preventing settlement deformation of the ground. The rainwater collection and permeation system comprises a primary rainwater flow abandoning pond, a filtering and purifying pond, a rainwater collection tank and a dry type sludge removing well. Multiple permeation filtering pipelines are vertically connected to the lower portion of the rainwater collection pond at intervals. The rainwater collection pond is formed by building polypropylene plastic modules and is wrapped in a waterproof geomembrane. The permeation filtering pipelines can guide rainwater to cross a foundation bearing layer to reach a lower sand contained layer, it is avoided that damage is generated due to the fact that rainwater permeates into the soil body of the foundation bearing layer for a long time and even soaks the soil body, and therefore a foundation is effectively prevented from settlement deformation. According to the rainwater collection and permeation system preventing the settlement deformation of the ground, the permeation filtering pipelines and the polypropylene plastic modules are combined to form an in-situ permeation system, the demands of ground settlement and utilization of rain seepage are met, the contradiction that the settlement of the ground and the in-situ permeation cannot be unified is overcome, and the rainwater collection and permeation system is widely applied to and built under the ground of rigid pavement park sites, squares, parking lots and the like.
Owner:广州建筑园林股份有限公司

Construction structure and construction method for controlling settlement of shallow-buried and underground-excavated large-section tunnel

The invention discloses a construction structure and a construction method for controlling settlement of a shallow-buried and underground-excavated large-section tunnel. A full-section method has thedefects that the stability of surrounding rock is reduced due to a large excavation surface, and a double-side-wall heading method is safe in construction, but low in speed and high in cost. The construction structure comprises an oval structure defined by four fan-shaped chambers and ground steel beams (2) laid on the ground, wherein a supporting structure is arranged outside each fan-shaped chamber in a surrounding mode, each supporting structure is composed of two layers of reinforcing meshes (4) arranged outside the corresponding fan-shaped chamber and a plurality of reinforcing grids (3)laid between the two layers of reinforcing meshes, and a plurality of locking anchor rods (1) are arranged on the ground steel beams, pass through holes in the ground and then are welded in the reinforcing grids. The construction structure and the construction method are used for controlling the settlement of the shallow-buried and underground-excavated large-section tunnel.
Owner:中交哈尔滨地铁投资建设有限公司 +2

Geocell reinforced cement concrete pavement structure and surface layer plate thickness calculation method

The invention discloses a geocell reinforced cement concrete pavement structure and a surface layer plate thickness calculation method. The pavement structure mainly comprises a base layer, a surfacelayer and a wearing layer which are sequentially laid from bottom to top. The base layer is composed of an upper geotextile layer, a lower geotextile layer and a middle geocell reinforced graded broken stone layer; the surface layer is a cement concrete layer reinforced by a geocell; the wearing layer comprises a cement mixture wearing layer and a geogrid; pull rings are reserved on the two sidesof each geocell in a road direction, the geocells are stretched to be in a tensioned state, and wooden wedges penetrate through the pull rings to fix the geocell at the outermost end. The surface layer plate thickness calculation method mainly comprises the steps of traffic analysis, initial simulation of a pavement structure, determination of pavement material parameters, and checking of load stress, temperature stress and a structure limit state. The problems that an existing pavement structure is low in strength, and a cement concrete pavement is subjected to fatigue fracture, mud pumping,slab staggering and the like under heavy-load traffic are solved, so that the pavement structure has high bearing capacity and deformation resistance, and damage to the pavement structure is reduced.
Owner:HUNAN UNIV OF SCI & TECH

Expansive soil foundation structure containing ballastless track roadbed and construction method

The invention provides an expansive soil foundation structure containing a ballastless track roadbed and a construction method. The structure comprises porous pipe piles, an expansive soil foundation,a geosynthetics reinforced cushion layer and a ballastless track roadbed, the porous pipe piles and the expansive soil foundation are arranged at the lowermost portion, and the geosynthetics reinforced cushion layer and the ballastless track roadbed are sequentially arranged above the porous pipe piles and the expansive soil foundation from bottom to top; a plurality of porous pipe piles are vertically arranged in the expansive soil foundation, each porous pipe pile comprises a hollow porous pile body and an elastomer material filling the hollow porous pile body, each hollow porous pile bodyis of a hollow reinforced concrete structure, and each porous pipe pile further comprises a radial through hole penetrating through the inner wall and the outer wall of the corresponding hollow porouspile body in the radial direction. According to the method, the expansion and shrinkage deformation of the expansive soil foundation during water immersion and loss is effectively reduced, so that the expansion and shrinkage deformation of the ballastless track roadbed is controlled within a reasonable range, the requirements of high-speed and safe operation of trains on the ballastless track roadbed are met, and the expenses for reinforcing and treating the expansive soil foundation are saved.
Owner:CENT SOUTH UNIV

High-fill embankment structure and construction method

PendingCN111827030ASolve the problem of poor drainageLow priceRoadwaysSewer pipelinesDitchGeogrid
The invention discloses a high-fill embankment structure and a construction method. A plurality of layers of drainage blind ditches and geogrids among the layers of drainage blind ditches are arrangedin an embankment structure body from bottom to top; each layer of drainage blind ditch is a drainage blind ditch net with a grid structure formed by longitudinal blind ditches and transverse blind ditches which are intersected longitudinally and transversely, a side length of a grid is 12-15m, and a distance between the upper layer and the lower layer of the adjacent drainage blind ditches is notmore than 5m; each layer of geogrid is laid on a plane which is not less than 50cm away from the lower part of the upper drainage blind ditch layer in a full-plane manner; and foot protecting walls or drainage gullies are arranged on the two transverse sides of an embankment respectively. Accumulated water is drained by arranging longitudinal solid blind ditches and transverse solid blind ditches, settlement deformation of the high-fill embankment is prevented by arranging the geogrids, and engineering safety is improved; and compared with traditional measures such as adopting well-graded sand gravels, laying reinforcing meshes between layers, arranging load-reducing culverts and the like, the structure and the method have great economic advantages, and problems of excessive settlement and unsmooth embankment drainage can be effectively solved.
Owner:中国水利水电第七工程局有限公司

Tunnel construction method adopting prefabricated inverted arch module

The invention relates to the technical field of tunnel construction, and discloses a tunnel construction method adopting a prefabricated inverted arch module. According to the tunnel construction method, a connecting steel frame is supported between a preliminary brace and the prefabricated inverted arch module more firmly, finally, a fastening bolt between the connecting steel frame and an embedding sleeve is fastened again, the connecting steel frame and the embedding sleeve are welded, a fastening bolt between a connecting steel plate and a supporting steel plate is fastened again, the connecting steel plate and the supporting steel plate are welded, accordingly, it is ensured that the prefabricated inverted arch module and the preliminary brace are stably connected, the phenomenon thatdue to the fact that the connecting steel frame is not tightly mounted, and the preliminary brace deforms towards the inner side due to the surrounding rock pressure is avoided; and inverted arch filling in traditional tunnel construction is replaced with the prefabricated inverted arch module, accordingly, it is ensured that a support around the tunnel can rapidly form a closed loop, deformationsettlement of an excavated segment of the tunnel can be avoided, and the stability and the construction proceed of the tunnel structure can be improved.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Heat insulation and water prevention integration building roof and construction method thereof

The invention relates to a heat insulation and water prevention integration building roof and a construction method thereof, relating to the technical field of building. So-called integration firstly means heat insulation and water prevention function integration and secondarily means that a seamless integral roof is formed through a cast-in-site construction method so that the building roof has better heat insulation and water prevention effect. The heat insulation and water prevention integration building roof comprises a heat insulation tile layer and a water prevention layer sandwiched infoam concrete. The heat insulation and water prevention integration building roof is characterized in that the heat insulation tile layer is positioned on the lowest end of the building roof and formed by overlapping heat insulation tiles, and overlapping positions are provided with water-stop groove faces; and the water prevention layer is formed by casting polystyrene foam concrete on the heat insulation tile layer in site and then strickling, then spraying high molecular polymer emulsion and then coating waterproof paint in a strickling way, then paving waterproof roll materials and finally casting the foam concrete in site. The invention is not only suitable for severe cold regions in the national north, but also suitable for extremely hot regions in the national south and also has the advantages of low project cost, easy construction process operation, wide material source and suitability for wide popularization.
Owner:沈阳金铠建筑科技股份有限公司

Construction and construction method of expansive soil foundation with ballastless track subgrade

The invention provides an expansive soil foundation structure and construction method containing ballastless track subgrade, comprising porous pipe piles, expansive soil foundation, geosynthetic material reinforced cushion and ballastless track subgrade, the porous pipe pile and expansive soil The foundation is set at the bottom, and above it, a geosynthetic material reinforced cushion and a ballastless track subgrade are arranged in sequence from bottom to top; a plurality of porous pipe piles are vertically arranged in the expansive soil foundation, and the porous pipe piles include hollow porous The pile body and the elastomer material filled therein, the hollow porous pile body is a hollow reinforced concrete structure, and the porous pipe pile also includes a radial through hole passing through the inner and outer walls of the hollow porous pile body in the radial direction. The invention effectively reduces the expansion and contraction deformation of the expansive soil foundation when it loses water, so that the expansion and contraction deformation of the ballastless track subgrade is controlled within a reasonable range, which meets the high-speed and safe operation requirements of trains on the ballastless track subgrade, and saves expansive soil The cost of ground reinforcement treatment.
Owner:CENT SOUTH UNIV

Urban operation subway heaving control structure and control method thereof

The invention discloses an urban operation subway heaving control structure and a control method thereof. The urban operation subway heaving control structure comprises a plurality of uplift piles, a bottom-carrying cable pipe and back pressure prestressed tendons, wherein the uplift piles are buried in foundation pits to be excavated on the two opposite sides of an underground structure of an operation subway correspondingly, and the burial depth of the pile tops of the uplift piles is located between the top burial depth and the bottom burial depth of the underground structure; the bottom-carrying cable pipe is supported at the bottom of the underground structure, and the two ends of the bottom-carrying cable pipe are connected to the upper parts of the uplift piles on the two opposite sides of the underground structure correspondingly; the back pressure prestressed tendons abut against the upper part of the underground structure, and the two ends of each back pressure prestressed tendon are connected to the upper parts of the uplift piles on the two opposite sides of the underground structure correspondingly. According to the urban operation subway heaving control structure, the problems that new building products developed on the two sides of an operated metro station easily cause upheaval or settlement of an operated metro structure, and the safety of the operated metro structure is seriously affected are solved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Vertical radial grouting settlement control method for rigid sleeve valve pipe bundles

PendingCN113279766ADoes not affect excavation progressAvoid Construction Safety RisksMining devicesUnderground chambersObservation pointExhaust pipe
The invention discloses a vertical radial grouting settlement control method for rigid sleeve valve pipe bundles. The vertical radial grouting settlement control method comprises the following steps that grout overflow holes are marked and drilled in at least three steel pipes with sequentially increased lengths, and a rigid sleeve valve pipe bundle is formed by means of combining and fixing; the positions of a plurality of grouting control settlement holes are calibrated in the arch part of a primary support, and drilling is performed vertically to a set depth; a grouting pipe and an exhaust pipe are bound on the rigid sleeve valve pipe bundle and sent into a grouting control settlement hole, the hole is sealed, and a sleeve shell material is poured; settlement observation points and convergence observation points are installed at set positions, and settlement data of settlement mileage are monitored and controlled in real time; when the settlement data reach a critical settlement value, grouting is conducted according to the length of steel pipes in the rigid sleeve valve pipe bundles from short to long, one rigid sleeve valve pipe is used each time, other rigid sleeve valve pipes are used for standby application, the settlement data are monitored in real time in the grouting process, and grouting is stopped when the monitored settlement data reach the requirement, until controlling of all stratums of the settlement mileage is completed.
Owner:CHINA RAILWAY DESIGN GRP CO LTD +1

A rainwater collection and infiltration system to prevent ground subsidence and deformation

ActiveCN104452941BMeet the needs of penetration and utilizationAvoid settlement deformationGround-workSewerage structuresGeomembranePipeflow
The invention discloses a rainwater collection and permeation system preventing settlement deformation of the ground. The rainwater collection and permeation system comprises a primary rainwater flow abandoning pond, a filtering and purifying pond, a rainwater collection tank and a dry type sludge removing well. Multiple permeation filtering pipelines are vertically connected to the lower portion of the rainwater collection pond at intervals. The rainwater collection pond is formed by building polypropylene plastic modules and is wrapped in a waterproof geomembrane. The permeation filtering pipelines can guide rainwater to cross a foundation bearing layer to reach a lower sand contained layer, it is avoided that damage is generated due to the fact that rainwater permeates into the soil body of the foundation bearing layer for a long time and even soaks the soil body, and therefore a foundation is effectively prevented from settlement deformation. According to the rainwater collection and permeation system preventing the settlement deformation of the ground, the permeation filtering pipelines and the polypropylene plastic modules are combined to form an in-situ permeation system, the demands of ground settlement and utilization of rain seepage are met, the contradiction that the settlement of the ground and the in-situ permeation cannot be unified is overcome, and the rainwater collection and permeation system is widely applied to and built under the ground of rigid pavement park sites, squares, parking lots and the like.
Owner:广州建筑园林股份有限公司

Power channel structure crossing subway route

The invention discloses a power channel structure crossing a subway route. The power channel structure comprises an originating well, a receiving well and a jacking pipe segment connecting the originating well with the receiving well. The originating well and the receiving well are located on the two sides of an existing subway route, the distance between the originating well and the existing subway route is larger than that between the receiving well and the existing subway route, a pipeline between the receiving well and the originating well comprises an existing highway and original soil onthe two sides of the existing highway, the jacking pipe segment is located between the road surface and the existing subway route, a reinforcing structure is further included, and comprises a first reinforcing structure at least arranged in the original soil between the originating well and the existing highway and a second reinforcing structure located outside a concrete pipe segment, the reinforcing structure is arranged in the original soil, on the premise of ensuring the reinforcing effect, the influence on the operation of the existing highway can be avoided, partition reinforcing in theheight direction is carried out, and the construction time is shortened on the premise of ensuring the reinforcing effect.
Owner:成都建工第二建筑工程有限公司

Floodwall supporting and retaining system

InactiveCN107806063APrevent changes in the stress fieldAvoid changeBreakwatersQuaysHigh pressureRetaining wall
The invention discloses a floodwall supporting and retaining system. The floodwall supporting and retaining system comprises a row pile, an anchor rod and an anchoring plate, the front end of the anchor rod is fixedly connected with the row pile and a top beam, and the rear end of the anchor rod penetrates through a dike and is fixedly connected with the anchoring plate; and the anchor rod penetrates through a dike body, pipe piles are used for supporting a wall body, and cement mixing piles are arranged on both sides of the pipe piles. According to the floodwall supporting and retaining system, the row pile is arranged, a row pile anti-flood wall adopts drilled grouting piles to prevent change of a dike foundation stress field, and settlement deformation is avoided; the drilled piles areconnected by adopting two high-pressure jet grouting piles, scouring loss of soil behind the wall can be prevented, the anti-seepage effect is achieved, guarantee is provided for the equipment using environment, and the service life of the equipment is prolonged; and the anti-flood row pile retaining wall is fixedly connected with the anchoring plate behind the dike, the cement mixing piles are adopted to treat soft soil in front of and behind the wall, after the floodwall supporting and retaining structure is adopted, the problems such as treatment of a soft oil dike foundation, stability anddisplacement of a high embankment are solved, and a new design idea is provided for a newly-built anti-flood wall with the height being above 6 m.
Owner:中山市水利水电勘测设计咨询有限公司

Open-cut tunnel water-stop structure and construction method for protecting groundwater environment

The invention relates to an underground construction technology, and specifically relates to an open-excavated tunnel water stopping structure for protecting a groundwater environment and a construction method thereof. The open-excavated tunnel water stopping structure comprises vertical frozen earth water stopping layers arranged at two sides of an open-excavated foundation pit of a tunnel, and a horizontal frozen earth water stopping layer arranged at the bottom part of the open-excavated foundation pit of the tunnel, wherein the vertical frozen earth water stopping layers intersect with the horizontal frozen earth water stopping layer; the bottom parts of the vertical frozen earth water stopping layers are lower than the bottom part of the horizontal frozen earth water stopping layer. According to the open-excavated tunnel water stopping structure, the vertical frozen earth water stopping layers and the horizontal frozen water stopping layer form a U-trough shaped frozen earth water stopping layer to protect the groundwater environment, and thus the groundwater can be prevented from being polluted during the tunnel construction process; a frozen earth water stopping structure is adopted, so that wide-range draining construction can be avoided, and precious groundwater resources can be saved; meanwhile, surrounding buildings and structures can be prevented from being subjected to sedimentation and deformation caused by the draining construction.
Owner:CHINA RAILWAY ENG CONSULTING GRP CO LTD

The Method of Strengthening the Building Foundation by Utilizing Quicklime Brick Dregs Compaction Pile

The invention relates to a reinforcement construction method for building foundation treatment, in particular to a method for strengthening the foundation of a building by utilizing quicklime brick ballast compaction piles, using quicklime, brick ballast, soil, and cement as raw materials and pouring into the foundation In the pile hole, the pile hole is formed by impact, and the pile end is compacted with brick ballast. The adopted process is: construction preparation→construction setting out→construction precipitation→impact hole forming→layer pouring→tamping and capping. The percussion drill impacts the hole, and the soil between the piles is compacted during the hole formation process. After mixing quicklime, brick slag, soil, and cement raw materials, they are driven into the pile hole of the foundation soil. The quicklime absorbs water and expands to cause secondary compaction of the soil between the piles. effect, the pile end is rammed with brick ballast, and the brick ballast acts as a hard aggregate, making the pile upright and upright, which can effectively increase the strength of the foundation soil, improve the bearing capacity of the foundation soil, improve the uniformity of the foundation soil, and prevent the foundation from being damaged due to Settlement deformation occurs due to uneven force, low cost, no environmental pollution, and can shorten the construction period.
Owner:周口市颍河岩土工程有限公司

Tunnel with prefabricated inverted arch modules

The disclosure relates to the technical field of tunnel construction, and discloses a tunnel using prefabricated inverted arch modules. The prefabricated invert module of the tunnel is provided with a pre-embedded sleeve, which extends to the outside of the lateral end of the prefabricated invert module, and the protruding part of the pre-embedded sleeve is provided with a first strip-shaped installation hole. The installation holes are arranged along the horizontal extension, the inner end of the connecting steel frame is provided with the first bolt installation hole, the first bolt installation hole and the first bar-shaped installation hole are connected with fastening bolts, and the lower end of the primary support is provided with a supporting steel plate , the supporting steel plate is arranged along the longitudinal extension, the outer end of the connecting steel frame is provided with a connecting steel plate connected with the supporting steel plate, the supporting steel plate is provided with a second strip-shaped installation hole, the second strip-shaped installation hole is arranged along the vertical extension, and the connecting steel plate is opened There is a second bolt installation hole, and the second bolt installation hole and the second bar-shaped installation hole are connected with fastening bolts; the stability of the tunnel structure and the construction progress are improved.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products